This document is a Task Group Instruction (TGI) for modifying the forecastle deck drain and piping on the USS Blue Ridge (LCC-19), a naval vessel. The modification work is scheduled to start on 7/21/2026 and complete by 11/21/2027, involving multiple ship compartments including the Anchor and Line Handling Space, Windlass Room, and various offices. The specific tasks include installing new deck drain components, bending pipes, performing hydrostatic testing, and conducting clad welds on penetration sleeves, with special requirements for cleanliness and fire zone boundary management.
The instruction includes detailed specifications for structural modifications, such as replacing deck and bulkhead plates using OS material (MIL-S-22698 GR-A), installing vertical stiffeners, and adding deck pads. The work involves potential asbestos and lead hazards, and requires nondestructive testing and quality assurance inspections. Puget Sound Naval Shipyard will provide kitted materials, and SRF-JRMC will provide additional services including crane, utility, and safety inspections. The modification is part of job order 3819P52601 with the specific change instruction to revise requirements in paragraph 5.1.6.1.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SCD 11176K DD AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
*(RE) F/O - SCD 11176K ACCOMPLISH MODIFICATION OF FORECASTLE DECK DRN AND PIPING
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
HIRONARI ITO 234. 315-243-4534 30-MAY-2024
APPROVED BY: CODE PHONE DATE
HIDEKUNI SHINMEI 234. 315-243-4534 30-MAY-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Correct the column of the requirements of 009-12.
CHANGE INSTRUCTIONS:
CH1: Revise the column of the requirements 009-12 on paragraph 5.1.6.1 from “E” to “D”. (06/05/2024)
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.
CLASS P-2 PIPING.
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SCD 11176K DD AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 1/1
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-6 QA20
(2)
J1-2 QA28
(1)
M1-2 Map (1- 2)
1. SCOPE/PURPOSE
1.1 Title: SCD 11176K, Modification of Forecastle Deck Drain and Piping; accomplish
1.2 Location of Work:
1.2.1 Anchor and Line Handling Space (2-F-0-Q)
1.2.2 C7F 1st Division Office (2-14-6-Q)
1.2.3 Supplementary Plot (2-14-5-Q)
1.2.4 Windlass Room (3-8-0-Q)
1.2.5 Stateroom (3-14-2-L)
1.2.6 Sail Loft (3-14-1-Q)
1.2.7 CMAA Office (4-12-2-Q)
1.2.8 Training Officer Office (4-12-3-Q)
1.2.9 Freeboard Weather, Frames between 12 and 13, Port and Starboard (Stbd)
1.3 Identification:
1.3.1 Quantity (One Lot), Forecastle Deck Drain and Piping with Associated Fittings Remarks: See 2.3 for detail.
1.3.1.1 Quantity (2 EA), Forecastle Deck Drain Overboard Discharge Valve Size: 4.00 Inch IPS Type: Scupper, Flanged Valve No.: 4-12-2-W and 4-13-1-W
1.3.2 Quantity (One Lot), Structural Member in 2-F-0-Q, 2-14-5-Q, 3-8-0-Q, and 3-14-1-Q
1.3.2.1 Quantity (One EA), Deck Plate, Second Deck Plating, Frames between 13 and 15, Stbd
Material: OS, MIL-S-22698 GR-A, 10.2 LBs Plate Remarks: See Sheet 3 of 2.11 for detail
1.3.2.2 Quantity (One EA), Bulkhead Plate, Transverse Bulkhead Plating, Frame 14, Stbd
Material: OS, MIL-S-22698 GR-A, 10.2 LBs Plate Remarks: See Section 4-A of 2.11 for detail
FOUO
SHIP: LCC-19 CHG/VER: 1/1
1.3.2.3 Quantity (One EA), Bracket on Transverse Bulkhead Plating, Frame 14, Stbd
Material: OS, MIL-S-22698 GR-A, 4 Inches x 1/4 Inch Thickness Flat Bar Remarks: See Section 4-A of 2.11 for detail
1.3.2.4 Quantity (2 EA), Vertical Stiffener on Transverse Bulkhead Plating, Frame 14, Stbd
Material: OS, MIL-S-22698 GR-A, 6 Inches x 3.06 Inches x 5.9 LBs T Remarks: See Elevation 4-B of 2.11 for detail
1.3.2.5 Quantity (2 EA), Deck Pad on Second Deck Plating, Frames between 14 and 15, Stbd
Material: OS, MIL-S-22698 GR-A, 15.3 LBs Plate Remarks: See Sheet 3 of 2.11 for detail
1.3.2.6 Quantity (One EA), Deck Plate, Second Deck Plating, Frames between 13 and 14, Port
Material: OS, MIL-S-22698 GR-A, 10.2 LBs Plate Remarks: See Plan 5-A of 2.11 for detail
1.3.2.7 Quantity (One EA), Bulkhead Plate, Transverse Bulkhead Plating, Frame 14, Port
Material: OS, MIL-S-22698 GR-A, 12.75 LBs Plate Remarks: See Section 5-B of 2.11 for detail
1.4 Security Classification:
1.4.1 Spaces - 1.2.3
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 11/21/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items ORG N 2 LI FY-25 Local Standard Items ORG N
3 DWG 505-
8506468
DECK DRAIN MODS IMPROVED
FORECASTLE DRAINAGE 2ND
DK - 4TH DK, FR 12-15
A Y AL
L
4 DWG 100-
2491002
SHELL PLATING & STRINGERS
STEM-FR 51-1/2 ABV 4TH DK
E Y AL
L
5 DWG 810-
4714432
STD Pipe Hangers Fabrication
DETS & INSTL
L N
6 DWG 106-
2491056
2ND DK PLTG STEM - FR 52 M Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 1/1
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
7 DWG 105-
2491053
3RD DK PLTG STEM - FR 52 M Y AL
L
8 DWG 505-
2424406
PP SLEEVES STRL PEN (S-3-11) B N
9 DWG 803-
1385866
PENETRATION BULKHEAD &
DECK
E N
10 MIL MIL-
STD-1627
Bending of Pipe or Tube for Ship Piping Systems
C N
11 PDD 106-
ELM-240219
PATCHES FOR DECK DR MODS
INCIDENTAL TO SCD 11176
- Y AL
L
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish modification of forecastle deck drain and piping listed in 1.3.1 in accordance with 2.3, using 2.4 through 2.9 for guidance.
5.1.1 Accomplish the requirements of 009-95 of 2.1 for installation of new cap (F14 shown on 2.3).
5.1.2 Bend each new pipe in accordance with 2.10.
5.1.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.1.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.1.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed forecastle deck drain and piping.
5.1.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-1.
5.1.6 Accomplish clad weld of penetration sleeve on shell plating in accordance with 2.3.
5.1.6.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) D, Lines One through 7.
5.1.6.2 Accomplish nondestructive testing in accordance with Line 10.
5.1.6.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-02-1 and Enclosure-02-2.
Each joint identification number must be in accordance with Mapping Plan Enclosure-01.
5.1.6.4 Accomplish the requirements of 009-09 of 2.1 for welding procedure of each joint shown on Mapping Plan Enclosure-01.
FOUO
SHIP: LCC-19 CHG/VER: 1/1
5.1.7 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each deck drain and penetration sleeve. Allowable leakage: None.
5.1.8 Cycle the valve from fully closed to fully open to fully closed 4 times. Allowable binding: None.
(V) “VALVE CYCLING”
5.1.9 Accomplish flow check of forecastle deck drain and piping listed in 1.3.1, using clean, fresh water. Allowable external leakage: None.
(V)(G) “FLOW CHECK”
5.2 Remove existing, fabricate and install new each structural member listed in 1.3.2 in accordance with 2.11.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.2.1.1 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each deck plate, bulkhead plate listed in 1.3.2.1, 1.3.2.2, 1.3.2.6, and 1.3.2.7. Allowable leakage: None.
5.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.4 Notes:
5.4.1 Planner: Code 234 H. Ito, 243-4534
Planner: Code 231B H. Tanaka, 243-4491
5.4.2 All material listed in 2.3 will be provided as kitted material by Puget Sound Naval Shipyard (PSNS).
5.4.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.4.4 Preservation work for new and disturbed exterior surface of freeboard will be covered by ICN 3819P11001
(KTR TGI).
5.4.5 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.4.6 JCN EXSA-ZBV7 is related to this TGI.
5.5 Government Furnished Material (GFM)
5.5.1 SRF-JRMC will provide GFM listed in Appendix ”M”.
5.6 SRF-JRMC will provide the following service work: (TGI No. 3819P52601S02).
5.6.1 [C740] Crane and crane rigger service.
5.6.2 [X99E] Utility service, electrical.
5.6.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
FOUO
SHIP: LCC-19 CHG/VER: 1/1
5.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.6.6 [C133] QA inspection for (G) Symbol(s).
5.6.7 [C135] QA inspection for (G) Symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 1/1
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SCD 11176K DD AY A 0 1
CU PHASE TITLE:
*(RE) F/O - SCD 11176K ACCOMPLISH MODIFICATION OF FORECASTLE DECK DRN AND PIPING
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
DK DRN 4-12-3-Q PP DK DRN 3-8-0-Q PP DK DRN 4-12-2-Q PP DK DRN 2-F-0-Q
PP DK DRN 3-14-2-L PP CMPT 4-12-3-Q MS CMPT 3-14-1-Q MS CMPT 4-12-2-Q
MS CMPT 2-F-0-Q MS CMPT 3-14-2-L MSCMPT 2-14-5-Q MS CMPT 3-8-0-Q MS
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P52601-Map.pdf) saved on 25-MAY-2024 0000.
2. ENCLOSURE-02 (3819P52601A01-QA20.docx) saved on 25-MAY-2024 0000.
3. ENCLOSURE-03 (3819P152601A01-QA28.docx) saved on 28-MAY-2024 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P52601 A01
TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish modification of deck drain and piping.
Location of Work:
Anchor and Line Handling Space (2-F-0-Q) C7F 1st Division Office (2-14-6-Q) Supplementary Plot (2-14-5-Q) Windlass Room (3-8-0-Q) Stateroom (3-14-2-L) Sail Loft (3-14-1-Q) CMAA Office (4-12-2-Q) Training Officer Office (4-12-3-Q) Freeboard Weather, Frames between 12 and 13, Port and Starboard
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 PFTR HRs, RGRS HRs, SFTR HRs , SMTL HRs , WELD
HRs, IMCH HRs, OMCH HRs, PNTR HRs, INSL HRs, QA HRs
22 KE PC
5.2 SFTR HRs, STML HRs, WELD HRs, INSL HRs, CARP HRs, PNTR HRs, RGRS HRs, QA HRs
22 KE PC
5.3 PNTR HRs, QA HRs 22 KE PC
Piping Work CFM for PT inspection cost, analysis and bulk sample cost for asbestos, sample cost for lead, air compressor rental cost, fuel oil cost, welding rod, paint, firewatch cost and MISC such as gas cylinder, plastic sheet, covering material, plastic bag, coverall, argon gas and consumable material.
22 MQ CS
FOUO
J-2
SHIP: LCC-19 CHG/VER: 1/1
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
Structure Work CFM for all paints, thinner, grits including disposal cost, deck covering material, firewatch cost, air compressor rental cost and fuel oil cost for air hose test, sampler/analysis cost for asbestos/lead, and misc such as electrode, gases, temporary covering and closure material, and other consumable.
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 1/1
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SCD 11176K DD AY A 0 1
CU PHASE TITLE:
*(RE) F/O - SCD 11176K ACCOMPLISH MODIFICATION OF FORECASTLE DECK DRN AND PIPING
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P52601 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
100 M PLATE,ME, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
5 FT X 3 FT X 1 PM
9B 9515 001533184 NA 4 N 41415012 15/SF
101 M PLATE,ME, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
2 FT X 2 FT X 1 PM
9B 9515 001533217 NA 4 N 41415013 4/SF
102 M PLATE,ME, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
2 FT X 2 FT X 1 PM
9B 9515 001533223 NA 4 N 41415014 4/SF
103 M BEAM,STRUCTURAL, ORDER
FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 9520 002780938 NA 4 N 41415001 10/FT
104 M INSULATI, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9Q 5640 008096312 NA 4 N 41415015 25/EA
105 M INSULATI, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9Q 5640 008096315 NA 4 N 41415016 15/EA
106 M SOUND CO, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9Q 5640 007565866 NA 4 N 41415017 15/EA
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 1/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
107 M TAPE,TEX, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 8315 002671632 NA 4 N 41415018 3/RO
108 M TAPE,TEX, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 8315 002671633 NA 4 N 41415019 3/RO
109 M ADHESIVE, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 8040 002738708 NA 4 Y 41415021 3/GL
110 M CAP,SNAP, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 5325 007377648 NA 4 N 41415020
100/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SCD 11176K DD AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P52601 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SCD 11176K DD AY A 0
MAPPING PLAN
ENCLOSURE-01 SHEET 1 OF 23819P52601A01
PLAN VEW
4TH DK, FR 12 - 15, PORT
DETAIL 1-A HJ-1
SEE DETAIL 1-A
CMAA OFFICE
4-12-2-Q
MAPPING PLAN
ENCLOSURE-01 SHEET 2 OF 23819P52601A01
TRAINING OFFICER OFFICE
4-12-3-Q
SEE DETAIL 2-A
PLAN VEW
4TH DK, FR 12 - 15, STBD
DETAIL 2-A HJ-2
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P52601A01 ENCLOSURE-02-1 TOTAL 2
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EXSA-ZBV7
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
18 MAY 2024
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
SHELL PLTG
9. DWG NO.
505-8506468 REV. A
10. CWP STEP NO.
5.1.6.3
11. JOINT ID
HJ-1
12. JOINT DESIGN
CLAD WELD
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED
REQUIREMENTS.
3819P52601A01 ENCLOSURE-02-1 TOTAL 2
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P52601A01 ENCLOSURE-02-2 TOTAL 2
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EXSA-ZBV7
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
18 MAY 2024
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
SHELL PLTG
9. DWG NO.
505-8506468 REV. A
10. CWP STEP NO.
5.1.6.3
11. JOINT ID
HJ-2
12. JOINT DESIGN
CLAD WELD
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P52601A01 ENCLOSURE-02-2 TOTAL 2
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P52601A01 ENCLOSURE-03-1 TOTAL 1
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 EXSA-ZBV7 KTR N/A Deck Drain System Piping
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. .
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
REQUIRED
MEDIUM
MEDIUM
USED
REQUIRED
PRESSURE
ACTUAL
PRESSURE
MINIMUM
DURATION
ACTUAL
DURATION
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.1.5 A Clean Fresh Water 50 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE
File details come from the government source that posted it. Updated .