TGI_3819P51206T01_c0v0_redact.pdf
PDF 96 KB Posted
- Attached to
- USS BLUE RIDGE 5C1 DSRA MODERNIZATION BUNDLE 5
- Solicitation number
- N6264925RA058
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), specifically focused on the Chill Water System Tightness & Operational Test. The TGI is dated 11-MAR-2025 and is part of the naval ship repair and modernization project (Project 19P, System 51411) with a job summary ID of 512G0006. The instruction outlines tasks for contractor work (22/KE), quality assurance work (33/G1), and support/functional work, all centered on accomplishing and documenting the tightness and operational test in accordance with the referenced technical procedure (TP 51411-3-300KTR). The document is marked FOUO (For Official Use Only) and involves key personnel such as Yuuji Fukuda (preparing activity) and Jason Y. Ohta (approving activity), with Yasuhiko Takahashi listed as the zone manager.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
11-MAR-2025 1553
20.14.15.2.9020 (September 2024) ICN: 3819P51206 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51411-3-300KTR TT T 4 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51411
CU PHASE TITLE: CHILL WATER SYS (T & OP), S/A 80964K - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EXSAZC04
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
FUKUDA, YUUJI 246.2 3152435265 24-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 10-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSA-ZC04
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
512G0006
Tightness & Operational Test for Chill Water System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
11-MAR-2025 1553
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51206 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51411-3-300KTR TT T 4 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51411
CU PHASE TITLE: CHILL WATER SYS (T & OP), S/A 80964K - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 51411-3-300KTR CHILL WATER SYS (T & OP) -
KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51411-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51411-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51411-3-300KTR.
/ EXSA N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P51206 KEY OP: T01
File details come from the government source that posted it. Updated .