TGI_3819P51206T03_c0v0_redact.pdf
PDF 96 KB Posted
- Attached to
- USS BLUE RIDGE 5C1 DSRA MODERNIZATION BUNDLE 5
- Solicitation number
- N6264925RA058
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) dated 13-MAR-2025. The specific task involves conducting an operational test and volumetric & balance test for the Ventilation Fan in Load Center #11, with the task number 51211-3-303KTR. The document details work to be performed by three groups: a contractor (22/KE), quality assurance (33/G1), and support/facilities work (EXSA), all of whom are required to accomplish and document the operational test in accordance with reference document TP 51211-3-303KTR. The TGI is part of a larger ship repair and modernization project for the USS Blue Ridge, which involves multiple task group instructions and test phases for ship repair, overhaul, preservation, and replacement work.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
13-MAR-2025 1531
20.14.15.2.9020 (September 2024) ICN: 3819P51206 KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51211-3-303KTR TT T 4 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51211
CU PHASE TITLE: VENTILATION FAN, LOAD CENTER #11 (OP, VOL & BAL), S/A 80964K - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EXSAZC04
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
SATO, YOSHIYUKI 246.2 3152434596 24-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 13-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSA-ZC04
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
512G0006
Operational Test and Volumetric & Balance Test for Ventilation System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
13-MAR-2025 1531
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51206 KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51211-3-303KTR TT T 4 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51211
CU PHASE TITLE: VENTILATION FAN, LOAD CENTER #11 (OP, VOL & BAL), S/A 80964K - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 51211-3-303KTR VENTILATION FAN (OP) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the operational test and volumetric & balance test in accordance with reference, TP 51211-3-303KTR.
22/KE PC N
(Q) QA work:
Accomplish/document the operational test and volumetric & balance test in accordance with reference, TP 51211-3-303KTR.
33/G1 QA N
(S) S/F Work:
Accomplish/document the operational test and volumetric & balance test in accordance with reference, TP 51211-3-303KTR.
/ EXSA N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P51206 KEY OP: T03