TGI_3819P51206A01_redact.pdf
PDF 2 MB Posted
- Attached to
- USS BLUE RIDGE 5C1 DSRA MODERNIZATION BUNDLE 5
- Solicitation number
- N6264925RA058
About this file
This document is a Task Group Instruction (TGI) for HVAC Load Center work on the USS Blue Ridge (LCC-19). The task involves accomplishing air conditioning load center modifications across multiple ship locations, including passages, fan rooms, living spaces, messrooms, and various administrative areas. The work is scheduled to begin on 7/21/2026 and complete by 11/21/2027, with specific requirements including structural, sheet metal, and insulation work, machinery modifications, electrical installations, and piping system updates.
Key technical details include installing new wallpaper, laminated plastic sheets, flow control valves, steam supply and drain valves, temperature regulating valves, electrical components, and insulation. The work involves testing various systems, including hydrostatic tests for piping, valves, and cooling equipment, with strict requirements for pressure testing, leak prevention, and quality assurance. The project involves multiple technical disciplines and requires careful coordination across different ship compartments and systems, with specific attention to fire zone boundaries and non-flammable closures.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: 80964K HVAC LOAD CTR AY A 0 2
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
(RE) F/O - S/A 80964K, ACCOMPLISH LCC 19 ESLP AIR CONDITIONING LOAD CENTER 1-4
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
YUUJI MATSUYAMA 231B. 315-243-4476 28-FEB-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B 315-243-4502 28-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Title of reference of 2.4 is incorrect.
Paragraphs 5.13.3 have typo.
CHANGE INSTRUCTIONS:
CH1: Correct title of reference of 2.4. (03/05/2025) CH2: correct typo in paragraphs 5.13.3. (03/11/2025)
SPECIAL REQUIREMENTS:
This Work Affects a Fire Zone Boundary. Fabrication and/or Staging of a Non-Flammable Closure is Required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II and III.
CLASS P-2 and P-3B PIPING.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: 80964K HVAC LOAD CTR AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 2/1
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-13 QA28
(1-2)
J 1-3 QA28
(1-10)
M 1-12 Sketch (1-3)
1. SCOPE/PURPOSE
1.1 Title: S/A 80964K, Accomplish Air Conditioning Load Center 1-4; accomplish
1.2 Location of Work:
1.2.1 Passage (03-67-01-L)
1.2.2 Passage (2-40-0-L)
1.2.3 Flag Executme Assistant SR (2-46-2-L)
1.2.4 Flag Mess Office (2-49-2-Q)
1.2.5 Fan Room (2-52-6-Q)
1.2.6 Officers WR, WC SH & Decontamination Station (2-54-2-L)
1.2.7 Passage (3-18-0-L)
1.2.8 S-5 Office (3-30-0-Q)
1.2.9 Passage (3-30-01-L)
1.2.10 DCRS 1F (3-32-2-Q)
1.2.11 Word Room Galley (3-34-0-Q)
1.2.12 Word Room Scullery (3-34-2-Q)
1.2.13 Passage (3-40-2-L)
1.2.14 Fan Room (3-48-2-Q)
1.2.15 Passage (3-52-0-L)
1.2.16 Fleet OPS (3-52-2-Q)
1.2.17 Fan Room (3-60-4-Q)
1.2.18 Passage (3-86-4-L)
1.2.19 Passage (3-108-2-L)
1.2.20 Passage (3-109-6-L)
FOUO
SHIP: LCC-19 CHG/VER: 2/1
1.2.21 Utility Room (3-112-6-Q)
1.2.22 Augmentee Living Space (4-25-1-L)
1.2.23 Crew and Troop Messroom and Forward Battle Dressing Station (4-30-0-L)
1.2.24 CPO Living Space (4-30-2-L)
1.2.25 Fan Room (4-30-3-Q)
1.2.25.1 Vent Plenum for HVAC Recirculating System (RS) 4-30-1
1.2.26 Fan Room (4-30-5-Q)
1.2.27 Forward Repair No. 2 (4-30-7-Q)
1.2.28 Crew Living Space (4-32-2-L)
1.2.29 Load Center No. 11 (4-34-1-Q)
1.2.30 Crew Scullery (4-36-0-Q)
1.2.30.1 Watertight Trunk for Exhaust System (ES) 1-37-2
1.2.31 Hot Water Heater Room (4-36-1-Q)
1.2.32 Cooling Gear Locker (4-36-2-A)
1.2.33 Crew Messroom (4-40-0-L)
1.2.34 CPO Career Counseling Office (4-52-4-Q)
1.2.35 LPO Career Counseling Office (4-54-2-Q)
1.2.36 Load Center 21/22 (4-57-2-Q)
1.2.37 Passage (4-64-0-L)
1.2.38 CPO Messroom (4-70-0-L)
1.2.39 Load Center Switch Board Center No. 31 (4-76-1-Q)
1.2.40 Passage (4-76-3-L)
1.2.41 Passage (4-76-4-L)
1.2.42 Propulsion Repair No. 5 (4-79-1-Q)
1.2.43 Load Center 41/42 (4-106-4-Q)
1.2.44 Passage (4-109-01-L)
1.2.45 Load Center Switchboard Room No. 4 Annex (4-109-6-Q)
1.2.46 Passage (4-113-01-L)
FOUO
SHIP: LCC-19 CHG/VER: 2/1
1.2.47 Crew Living Space (5-30-01-L)
1.2.48 Crew Living Space (5-52-0-L)
1.2.49 Uptake Space (5-76-0-Q)
1.2.50 Crew WC (5-105-2-L)
1.3 Identification:
1.3.1 Quantity (One Lot), Structural, Sheet Metal, and Insulation Work for S/A 80964 K LCC19 ESLP Air Conditioner Load Center 1-4
Remarks: See 2.3 through 2.19 for materials and details and Sheet One of Sketch Enclosure-01 for location and detail.
1.3.1.1 Quantity (16 SF), Wallpaper in 4-70-0-L [Existing]
Color: White Remarks: See Sheet 2 of Sketch Enclosure-01 for location and detail.
1.3.1.2 Quantity (16 SF), Wallpaper in 4-70-0-L [Existing]
Color: Wood grain Remarks: See Sheet 2 of Sketch Enclosure-01 for location and detail.
1.3.1.3 Quantity (16 SF), Wallpaper in 4-70-0-L [New]
MFR: GOLDCREST WALLCOVERINGS & CONTRACT SALES
Parts No.: LB2-4063 Remarks: See Sheet 2 of Sketch Enclosure-01 for location and detail.
1.3.1.4 Quantity (16 SF), Laminated Plastic Sheet in 4-70-0-L [New]
MFR: WILSONART INTERNATIONAL
Parts No.: 4197-WM Remarks: See Sheet 2 of Sketch Enclosure-01 for location and detail.
1.3.1.5 Quantity (4 SF), Filler in 3-30-01-L [Existing]
Remarks: See Sheet 3 of Sketch Enclosure-01 for location and detail.
1.3.1.6 Quantity (4 SF), Bond Coat
Specification: MIL-PRF-3135, Type III
1.3.1.7 Quantity (4 SF), Light Weight Polymeric Underlayment
Specification: MIL-PRF-3135, Type III
1.3.1.8 Quantity (4 SF), Grout Coat
Specification: MIL-PRF-24613, Type I
1.3.1.9 Quantity (4 SF), Waterproof Membrane
FOUO
SHIP: LCC-19 CHG/VER: 2/1
Specification: ANSI A118.10
1.3.2 Quantity (One EA), Existing Chilled Water Flow Control Valve for Cooling Coil 4-30-3 Capacity: 40GPM Type: Union End Size: 1.50-Inch IPS Item No: R3 on 2.20
1.3.3 Quantity (One EA), New Chilled Water Flow Control Valve for Cooling Coil 4-30-3 Mfr: Romac Industries Inc.
Mfr Id: 2353-1352 Type: Union End Size: 1.50-Inch IPS Item No: V1 on 2.20
1.3.3.1 Quantity (One EA), Orifice Plate Assembly
Capacity: 31GPM Item No: R4 on 2.20
1.3.3.2 Quantity (One EA), Mesurflo Orifice Plate Repair Kit
Mfr: Romac Industries Inc.
Part Number: 5865-12SK Capacity: 29GPM Item No: F12 on 2.20
1.3.4 Quantity (One EA), New Service Steam Supply Cutout Valve for Heater 4-36-2 Mfr Id: 803-4384536-31A Type: Globe, In-Line Stop, Union End Size: 0.50-Inch IPS Item No: V1 on 2.21
1.3.5 Quantity (One EA), New Service Steam Drain Cutout Valve for Heater 4-36-2 Mfr Id: 803-4384536-32A Type: Globe, In-Line Stop Check, Union End Size: 0.50-Inch IPS Item No: V2 on 2.21
1.3.6 Quantity (One EA), New Service Steam Solenoid Valve for Heater 4-36-2 Mfr: Automatic Switch Company Mfr Id: AV174-565-12 Type: Union End Size: 0.50-Inch IPS Item No: V3 on 2.21
1.3.7 Quantity (One EA), New Service Steam Temperature Regulating Valve for Preheater 2-52-8 Type: D-24 with Model “W and L” Thermostat, Union End Size: 1.00-Inch IPS Temperature Range: 40-100 Degrees Fahrenheit for “L” Thermostat Item No: V4 on 2.21
APL: 882140019
1.3.8 Quantity (One EA), Power System
Remarks: See 2.29 for details.
1.3.8.1 Quantity (2 EA), Controller of Ventilation Fan S2-52-2 and E3-48-2 Mfr: General Electric
FOUO
SHIP: LCC-19 CHG/VER: 2/1
Mfr Id: 139B2810G1S2 Type: LVP Volts: 440VAC Frequency: 60Hz Phase: 3
APL: 151404650
1.3.8.2 Quantity (2 EA), Controller of Ventilation Fan R4-58-2 and Fan R4-30-3 Remarks: See 2.29 for guidance.
1.3.9 Quantity (One EA), Lighting System
Remarks: See 2.30 for details.
1.3.10 Quantity (One EA), Receptacle System
Remarks: See 2.31 for details.
1.3.11 Quantity (2 EA), Fan Coil Unit R4-78-1 and R4-108-2
Remarks: See 2.8 and 2.9 for guidance.
1.3.12 Quantity (One Lot), Piping Work for S/A 80964 K LCC19 ESLP Air Conditioner Load Center 1-4
1.3.12.1 Quantity (One Lot), Chilled Water Piping
Remarks: See 2.20 and 2.40 through 2.42 for material and detail
1.3.12.2 Quantity (One Lot), Condensate Drain Piping
Remarks: See 2.20 and 2.40 through 2.42 for material and detail
1.3.12.3 Quantity (One Lot), Waste Drain Piping
Remarks: See 2.14 and 2.43 for material and detail
1.3.12.4 Quantity (One Lot), Service Steam Piping
Remarks; See 2.21 for material and detail
1.4 Security Classification:
1.4.1 Space - 1.2.3, 1.2.4, 1.2.16, 1.2.34, and 1.2.35
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.5.2 Potential Lead Hazard.
1.5.3 Potential PCB Hazard
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 11/21/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
FOUO
SHIP: LCC-19 CHG/VER: 2/1
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
3 DWG 113-
8473148
FOUNDATION MODIFICATIONS
HVAC LOAD CENTER FAN ROOM
& LOAD CENTER
A Y AL
L
4 DWG 501-
8505496
HVAC REMOVAL R4-30-3 LOAD
CENTER #11 (4-34-1-Q) UPGR
4TH DK FR 30-40 P/S
A Y AL
L
5 DWG 501-
8505497
HVAC INSTALLATION R4-30-3
LOAD CENTER #11 (4-34-1-Q)
UPGR 4TH DK FR 30-40 P/S
A Y AL
L
6 DWG 501-
8505498
HVAC RMVL LOAD CENTER
#21/22 (4-57-2-Q) 2ND-4TH DK, FR
48-64 PORT
A Y AL
L
7 DWG 501-
8505499
HVAC UPGRADE FOR LOAD
CENTER #21/22 (4-57-2-Q) 2ND-
4TH DK FR 48-64 PORT
A Y AL
L
8 DWG 501-
8505500
HVAC MODS LOAD CENTER #31
(4-76-1-Q) 4TH DK, FR 76-78
STBD
A Y AL
L
9 DWG 501-
8505501
HVAC MODS LOAD CENTER
#41/42 4-106-4-Q
A Y AL
L
10 DWG 613-
8577998
AIR COND LOAD CENTER NO. 2
MISCELLANEOUS
ARRANGEMENT & DETAIL
MODIFICATIONS
- Y AL
L
11 DWG 605-
8893951
AIR CONDITIONING LOAD
CENTER NO. 1 PAINT,
INSULATION & DECK COVERING
MODIIFCATIO
- Y AL
L
12 LAR SRFY -
0258 - 24
MISSING REINFORCEMENT OF
FAN COIL UNIT FOUNDATION
- Y AL
L
13 LAR SRFY -
0241 - 24
MODIFICATION PLAN OF
FOUNDATION OF COOLING COIL
INSTL IN LOAD CTR 21/22(4-57-2-
Q
- Y AL
L
14 LAR SRFY -
0222 - 24
MODIFICATION PLAN OF
FOUNDATION OF FCU INSTL IN
LOAD CTR 41/42 (4-106-4-Q)
- Y AL
L
15 LAR SRFY -
0221 - 24
MODIFICATION PLAN OF
FOUNDATION OF VANEAXIAL
FAN
- Y AL
L
16 LAR SRFY -
0212 - 24
Discrepancy compartment number between the DWG and ship condition
- Y AL
L
17 LAR SRFY -
0211 - 24
Relocation of Cooling coil CC4-57-2 and Fan R4-58-2
- Y AL
L
18 LAR
PSNSIMF -
0117 - 25
BLUE RIDGE (LCC19) A2 Fan Foundation Shock Qualification
- Y AL
L
19 PDD 105-
ELM-250182
INSTL OF PATCH FOR REMOVAL
DUCT INCID TO SCD 10964
- Y AL
L
20 DWG 502-
8474276
CHILLED WATER &
CONDENSATE DRAIN
MODIFICATIONS INCID TO CC 4-
30-3 FAN ROOM (4-30
A Y AL
L
21 DWG 500-
8506390
SERVICE STEAM PP MODS INCID
LOAD CENTERS 2ND DK AND
BLW
A Y AL
L
22 LAR SRFY -
0228 - 24
Installation method about flow control valve replacement
- Y AL
L
23 DWG 1682-
B4
ASSEM. 1-1/2" UNION END x 1-1/4
BODY AUTO-MATIC BALANCING
VALVE W/UNION ENDS FOR
4 Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 2/1
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
24 DWG 502-
7290820
A/C CHILLED WATER CIRC SYS
DIAG DETAILS & MATERIAL
SPECS
B N
25 TM S9086-
RK-STM-
010/CH-505
Piping System 6 N
26 TM 0948-LP-
012-5000
Standard Navy Valves 32 N
27 DWG 803-
4384536
Valves; Bronze; 1/4"-2" Union End;
Globe; In-Line & Angle; Stop Check & Needle
N N
28 MIL MIL-
STD-1627
Bending of Pipe or Tube for Ship Piping Systems
C N
29 DWG 302-
8506133
POWER SYSTEM
MODIFICATIONS LOAD CENTER
HVAC
A Y AL
L
30 DWG 303-
8505729
LIGHTING SYSTEM
MODIFICATIONS LOAD CENTERS
1-4 HVAC UPGRADE
A Y AL
L
31 DWG 303-
8786989
RECEPTACLE SYSTEM
MODIFICATIONS LOAD CENTERS
1-4 HVAC UPGRADE
- Y AL
L
32 DWG 345-
8786971
AIR CONDITIONING LOAD
CENTWR SWBD RM 31 ARR 4-76-
1-Q
- Y AL
L
33 PDD
302/303-
ELM-250075
SUPPL INFO FOR SCD 10964
PWR & LTG MODIFICATION
- Y AL
L
34 LAR
PSNSIMF -
0487 - 24
BLUE RIDGE (LCC19) Material Description and Material Specification Conflict in L
- Y AL
L
35 LAR SRFY -
0015 - 25
Correction to drawing discrepancies for SCD 10964
- Y AL
L
36 MIL MIL-
STD-2003
Electric Plant Installation Standard Methods for Surface Ships and Submarines
B N
37 TM S9AA0-
AB-GOS-
010/GSO
General Specifications for Overhaul of Surface Ships (GSO)
11 N
38 DWG
139B2810
Size 0 AC Magnetic Controller D Y AL L
39 DWG
1346D00
UNIT ASSEMBLY FCU-V6 A Y AL
L
40 DWG 502-
8474273
CHILLED WATER AND
CONDENSATE DRAIN
MODIFICATIONS FCU 4-108-2
LOAD CTR 41/42 (4-1
A Y AL
L
41 DWG 502-
8474274
CHILLED WATER AND
CONDENSATE DRAIN
MODIFICATIONS FCU 4-58-2 LD
CTR NO. 2
A Y AL
L
42 DWG 502-
8474275
CHILLED WATER AND
CONDENSATE DRAIN
MODIFICATIONS LOAD CTR
SWBD RM NO. 3
A Y AL
L
43 DWG 505-
8506389
WASTE DRAIN SYSTEM DECK
DRAIN INSTL INCID LOAD CNTRS
4TH DK AND BLW
A Y AL
L
44 TM S9086-
VH-STM-
010/CH-635
Thermal, Fire, and Acoustic Insulation
3 N
3. APPENDICES:
FOUO
SHIP: LCC-19 CHG/VER: 2/1
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the structural, sheet metal, and insulation work for SA 80964K listed in 1.3.1 in accordance with 2.3 through 2.19, and Enclosure-01.
5.1.1 Remove each existing wallpaper listed 1.3.1.1 and 1.3.1.2.
5.1.2 Install each new wallpaper and laminated plastic sheet listed 1.3.1.3 and 1.3.1.4,
5.1.3 Accomplish the requirements of 009-26 of 2.1 for removal of each existing equipment listed in 1.3.1.5 and installation of each new equipment listed in 1.3.1.6 through 1.3.1.9 in accordance with manufacture’s instruction.
5.1.3.1 Template detail from existing equipment for new installation.
5.1.3.2 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area receiving new deck covering. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
5.1.3.3 Apply one top coat of dark blue, color No. 25044 (SAE-AMS-STD-595), conforming to MIL-DTL-24607 at 2 to 4 mils to the top and vertical surface of each equipment listed in 1.3.1.9.
5.1.4 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, C, and D, Lines One through 7.
5.1.5 Accomplish the requirements of 009-11 of 2.1.
5.1.5.1 Accomplish the requirements of 009-12 of 2.1.
5.1.5.2 Accomplish the requirements of 009-32 of 2.1 for receiving surface and top surface where new insulation is installed.
5.1.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
5.1.7 After installation of each new water tight closure 4-34-1, 4-35-1, 4-57-2, and 4-60-2, cycle each new water tight closure from fully closed to fully open to fully closed 3 times. Allowable binding: None.
(V) "VALVE CYCLING"
5.2 Accomplish a machinery work of S/A 80964K listed in 1.3.2 through 1.3.7 in accordance with 2.20 through 2.22.
5.2.1 Remove each orifice plate assembly listed in 1.3.3.1 from each new flow control valve listed in 1.3.3 and install each orifice plate repair kit listed in 1.3.3.2 to each new flow control valve listed in 1.3.3 in accordance with 2.22, using 2.23 for guidance.
5.2.1.1 Etch out existing "31 GPM" stamp on valve body of each new flow control valve and restamp "29 GPM" on valve body of each new flow control valve in accordance with 2.22, using 2.23 for guidance.
5.2.2 Accomplish a shop test of each new flow control valve listed in 1.3.3, using 2.23 through 2.25 for guidance.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.2.2.1 Shop test equipment must conform to the requirements in Paragraph 505-11.1.3 of 2.25.
5.2.2.2 Accomplish a mechanical joint tightness test of each new flow control valve, using clean fresh water at 150 PSIG (not less than 150 PSIG and not more than 153 PSIG) for a minimum of 3 minutes. Allowable external leakage:
None.
(V) "MECHANICAL JOINT TIGHTNESS TEST"
5.2.2.3 Document each shop test result on QA Form 28 Enclosure-02-1.
5.2.3 Accomplish a bonnet ring torque check and tighten each bonnet ring of each new globe valve listed in 1.3.4 and 1.3.5 in accordance with Table 4.3.5-10 of 2.26, using 2.21 and 2.27 for guidance.
5.2.3.1 Torque of each bonnet ring of each new globe valve is 32 to 35 foot pounds.
5.2.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using feed water at 101 PSIG, for each new valve listed in 1.3.4 through 1.3.7.
5.2.4.1 Document each shop test result on QA Form 28 Enclosure-02-2.
5.3 Accomplish electrical removals, modifications and installations of the system listed in 1.3.8 through 1.3.10 in accordance with 2.4, 2.5, 2.7 through 2.10 and 2.29 through 2.35.
5.3.1 Electrical installations must be in accordance with 2.36.
5.3.2 Submit one legible copy, in hard copy or approved transferrable media, of new motor name plate data of new ventilation fan R4-58-2 to the SUPERVISOR for evaluation of protective device.
5.3.3 Inspect each protective device of the equipment listed in 1.3.8.1, 1.3.8.2 and 1.3.11.
5.3.3.1 Verify that size and setting of each overload heater of the equipment listed in 1.3.8.1 and 1.3.8.2 are correctly used under the motor full load running current in accordance with Section 302g of 2.37 and 2.29, using 2.38 for guidance.
(V) "SIZE/SETTING"
5.3.3.2 Verify that each fuse of the equipment listed in 1.3.8.2 and 1.3.11 is correctly sized in accordance with Section 302g of 2.37 and 2.29, using 2.39 for guidance.
(V) "SIZE"
5.3.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A and D, Lines One through 7.
5.3.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of stuffing tube.
Allowable leakage: None.
5.4 Accomplish piping work for SCD 80964K listed in 1.3.12 in accordance with 2.14, 20, 21 and 40 through 2.43.
5.4.1 Bend each new pipe in accordance with 2.28.
5.4.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.4.2.1 Accomplish nondestructive testing in accordance with Line 13 for liquid penetrant testing accomplished to satisfy operational pressure test option.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.4.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.4.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for new and disturbed chilled water system piping listed in 1.3.12.1.
5.4.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-1.
5.4.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed condensate drain system piping listed in 1.3.12.2.
5.4.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-2.
5.4.6 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed waste drain system piping listed in 1.3.12.3.
5.4.6.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-3.
5.4.7 Accomplish flow check of each new waste drain piping listed in 1.3.12.3, using clean, fresh water. Allowable external leakage: None.
(V) (G) “FLOW CHECK”
5.4.8 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 101 PSIG, for new and disturbed service steam system piping listed in 1.3.12.4.
5.4.8.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-4.
5.4.9 Accomplish the requirements of 009-25 of 2.1 for an air hose test of new weld on pipe pentation sleeve.
Allowable leakage: None.
5.4.10 Remove each existing insulation and lagging from the piping listed in 1.3.12.1 through 1.3.12.4 with associated fittings, using 2.44 for guidance.
5.4.11 Accomplish the requirements of 009-11 of 2.1 for installation each new insulation and lagging to the piping listed in 1.3.12.1 through 1.3.12.4 with associated fittings.
5.4.11.1 Apply vapor barrier conforming to MIL-PRF-19565 to the new lagging surface listed in 1.3.12.1.
5.4.12 Cycle each new valve from fully closed to fully open to fully closed 4 times. Allowable binding: None.
(V) "VALVE CYCLING”
5.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for each new colling coil (4-57-2).
5.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-5.
5.6 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for each new fan coil unit (4-78-1).
5.6.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-6.
5.7 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for each new fan coil unit (4-108-2).
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.7.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-7.
5.8 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 101 PSIG, for each new preheater (2-52-8).
5.8.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-8.
5.9 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 101 PSIG, for each new reheater (4-33-2).
5.9.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-9.
5.10 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 101 PSIG, for each new reheater (4-36-2).
5.10.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-10.
5.11 Confirm that all personnel have exited the space prior to closure of the space listed in 1.2.25.1 and 1.2.30.1.
Designate one person to account for all personnel who may have entered the space.
5.12 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.13 Notes:
5.13.1 Planner: Code 231B Y. Matsuyama, 243-4476
Planner: Code 232 K. Nakamura, 243-0090 Planner: Code 233 Y. Shinohara, 080-9350-1451 Planner: Code 234 M. Motohashi, 243-2373 Planner: Code 234 T. Tsunoi, 070-7787-2058 Engineer: Code 250 A. Souma, 243-4332
5.13.2 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.13.3 Removal, fabrication and Installation, including 6XXX series aluminum welding of the following equipment will be covered by TGI No(s). 3819P51206U01, 3819P51206F01, 3819P51206R01, 3819P51206U02, 3819P51206F02 and 3819P51206R02 (SRF-JRMC TGI).
Supply System (SS) 01-77-3 Drip Proof and Non-Watertight Duct: Plan 10-A, 14-A, and 19-A of 2.8.
SS 3-105-2 Drip Proof and Non-Watertight Duct: Plan 11-A, 14-A, and 14-D of 2.9.
5.13.4 JCN EXSA-ZC04 is related to this TGI.
5.14 Government Furnished Material (GFM):
5.14.1 All installing activity furnished (IAF) material except hazardous material listed in each S/A drawing will be provided as kitted material by SRF-JRMC.
5.14.2 SRF-JRMC will provide material listed in Appendix “M”.
5.15 SRF-JRMC will provide the following service work: (TGI No. 3819P51206S02).
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.15.1 [C740] Crane and crane rigging service.
5.15.2 [X99E] Utility service, electrical.
5.15.3 [X99M] Utility service, including low pressure air supply, water supply and steam supply.
5.15.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.15.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.15.6 [C133] QA inspection for (G) symbol(s).
5.15.7 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 2/1
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
80964K HVAC LOAD CTR AY A 0 1
CU PHASE TITLE:
(RE) F/O - S/A 80964K, ACCOMPLISH LCC 19 ESLP AIR CONDITIONING LOAD CENTER 1-4
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
CW SPLY 4-106-4-Q PP CW RTN 3-109-6-L PP CW SPLY 3-109-6-L PP CW RTN 3-60-4-Q
PP CW SPLY 3-60-4-Q PP SS 4-30-0-L PP CNDS DR 4-76-1-Q IN CNDS DR 4-76-1-Q
PP PLMB DR 5-105-2-L PP FCU 4-78-1 CC RHR 4-36-2 HT (4-109-2)-1L-F2A RC(4-57-
2)-1L-D5B RC PDB 4-31-1 PA (3-29-7)-1P-G(CONT2) C- (3-29-7)-1P-G(OT1) C-(3-29-7)-1P- G(OT2) C- (3-29-7)-1P-G(SOL2) C- (3-29-7)-1P-G(SOL3) C- (3-29-7)-4P-C1 C- (3-29-7)-4P-C2
C- CONTACTOR 4-35-1 EM CONTACTOR 4-39-1 EM (2-40-1)-4P-A C- (2-40-1)-4P-C C-
(2-65-2)-1P-K4 C- (3-29-7)-1P-G(INTLK1 C- (3-29-7)-1P-G(TS1) C- (3-29-7)-1P-G(TS2) C- (3-29- 7)-1P-G(TS3) C- (3-29-7)-4P-G C- (3-29-7)-4P-G(INTLK2 C- (3-89-2)-4P-D2 C- (4-51-1)-1P-C
C- (4-51-1)-1P-C(INTLK) C- (4-51-1)-4P-C C- CW RTN 4-30-5-Q PP CW SPLY 4-30-5-Q
PP VNT SS 2-52-2 DT CMPT 4-106-4-Q MS CMPT 3-52-2-Q MS CMPT 4-76-1-Q
MS (3-29-7)-4P-C C- CW RTN 4-76-1-Q PP CW SPLY 4-76-1-Q PP CW RTN 4-106-4-Q
PP CW 3-112-6-Q IN CW 4-106-4-Q IN CW 4-30-5-Q IN CW 4-76-3-L IN VNT E3-48-2
DT CMPT 4-30-0-L MSCMPT 3-48-2-Q MS CMPT 4-79-1-Q MS CW RTN 4-76-3-L
PP CW SPLY 4-76-3-L PP CW RTN 3-112-6-Q PP CW SPLY 3-112-6-Q PP SS 4-30-2-L
PP PLMB DR 5-52-0-L PP (4-36-1)-1L-F1D LF CNDS DR 4-30-5-Q IN CNDS DR 4-30-5-Q
PP VNT S1-37-1 DT VNT E1-70-4 DT VS 3-48-2 FA CMPT 4-52-4-Q MS WTC 4-
34-1 V- CNDS DR 4-57-2-Q IN CNDS DR 4-57-2-Q PP CW RTN 4-109-01-L PP CW
SPLY 4-109-01-L PP CC 4-57-2 CC RHR 4-35-1 HT (4-51-1)-1P-C(TS) C- VNT R4-30-3 CT
(2-65-2)-1P-K4(SOL) C- (3-29-7)-1P-G(SOL1) C- (3-89-2)-4P-D2(SOL) C- (4-51-1)-1P- C(SOL) C- (4-78-1)-1L-K3B RC (4-109-2)-1L-A3D LF VNT R4-58-2 CT CC 4-30-3 CC CMPT
4-57-2-Q MS CMPT 2-52-6-Q MS CMPT 4-56-4-Q MS CMPT 4-36-0-Q MS
CMPT 3-40-2-L MS(4-57-2)-1L-D4A LF (4-57-2)-1L-D4C LF VNT R4-108-2 DT WTC 4-60-2
V- CC 4-30-3 FCONT V- CW 3-60-4-Q IN CW 4-57-2-Q IN SS 4-30-2-L IN CW 3-
109-6-L IN PHR 2-52-8 SPLY V4 V- VNT R4-30-3 DT PLMB DR 5-76-0-Q PP CNDS DR 4-
106-4-Q IN CNDS DR 4-106-4-Q PP CW 4-109-01-L IN SS 4-30-0-L IN SS 2-52-6-Q IN
WTC 4-35-3 V- DK DRN 4-106-4-Q PP DK DRN 4-57-2-Q PP DK DRN 4-76-1-Q
PP PLMB DR 4-106-4-Q PP PLMB DR 4-106-4-Q IN (4-36-1)-1L-F1B LF VNT R4-78-1 DT
(2-65-2)-4P-K4 C- CW 4-109-6-Q IN CW 4-30-0-L IN CW 4-76-1-Q IN PHR 2-52-8
HT WTC 4-35-1 V- VNT E1-37-2 DT VNT E2-99-2 DT VS 2-52-2 FA CMPT 4-30-5-Q
MS CMPT 4-34-1-Q MS CMPT 3-60-4-Q MS (4-36-1)-1L-C3A LF CW RTN 4-109-6-Q
PP CW SPLY 4-109-6-Q PP CW RTN 4-57-2-Q PP CW SPLY 4-57-2-Q PP SS 2-52-6-Q
PP FCU 4-108-2 CC VNT R4-58-2 DT VNT R4-58-2 FA RHR 4-33-2 HT HTR 4-33-2
HT RHR 4-33-1 HT WTC 4-57-2 V-
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P51206A01-Sketch.pdf) saved on 27-FEB-2025 0000.
2. ENCLOSURE-02 (3819P51206A01-QA28-01.docx) saved on 26-FEB-2025 0000.
3. ENCLOSURE-03 (3819P51206A01-QA28-02.docx) saved on 26-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI ,YASUHIKO
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P51206 A01
TOTAL MAT’L COST TOTAL DURATION:
FOUO
J-2
SHIP: LCC-19 CHG/VER: 2/1
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish S/A 80964K, LCC 19 ESLP air conditioning load center 1-4.
Location of Work:
Passage (03-67-01-L) Passage (2-40-0-L) Flag Executme Assistant SR (2-46-2-L) Flag Mess Office (2-49-2-Q) Fan Room (2-52-6-Q) Officers WR, WC SH & Decontamination Station (2-54-2-L) Passage (3-18-0-L) S-5 Office (3-30-0-Q) Passage (3-30-01-L)
DCRS 1F (3-32-2-Q)
Word Room Galley (3-34-0-Q) Word Room Scullery (3-34-2-Q) Passage (3-40-2-L) Fan Room (3-48-2-Q) Passage (3-52-0-L) Fleet OPS (3-52-2-Q) Fan Room (3-60-4-Q) Passage (3-86-4-L) Passage (3-108-2-L) Passage (3-109-6-L) Utility Room (3-112-6-Q) Augmentee Living Space (4-25-1-L) Crew and Troop Messroom and Forward Battle Dressing Station (4-30-0-L) CPO Living Space (4-30-2-L) Fan Room (4-30-3-Q) Vent Plenum for HVAC Recirculating System (RS) 4-30-1 Fan Room (4-30-5-Q) Forward Repair No. 2 (4-30-7-Q) Crew Living Space (4-32-2-L) Load Center No. 11 (4-34-1-Q) Crew Scullery (4-36-0-Q) Watertight Trunk for Exhaust System (ES) 1-37-2 Hot Water Heater Room (4-36-1-Q) Cooling Gear Locker (4-36-2-A) Crew Messroom (4-40-0-L) CPO Career Counseling Office (4-52-4-Q) LPO Career Counseling Office (4-54-2-Q) Load Center 21/22 (4-57-2-Q) Passage (4-64-0-L) CPO Mess (4-70-0-L) Load Center Switch Board Center No. 31 (4-76-1-Q) Passage (4-76-3-L) Passage (4-76-4-L) Propulsion Repair No. 5 (4-79-1-Q) Load Center 41/42 (4-106-4-Q) Passage (4-109-01-L) Load Center Switchboard Room No. 4 Annex (4-109-6-Q) Passage (4-113-01-L) Crew Living Space (5-30-01-L) Crew Living Space (5-52-0-L) Uptake Space (5-76-0-Q) Crew WC (5-105-2-L)
FOUO
J-3
SHIP: LCC-19 CHG/VER: 2/1
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 SMTL , SFTR , WELD , PNTR , INSL , CARP , RGRS ,
ELEC , PFTR , QA
22 KE PC
5.2 OMCH , IMCH , QA 22 KE PC
5.3 ELEC , INSL , PFTR SFTR , WELD , STML , CARP ,
PNTR
22 KE PC
5.4 PFTR , WELD , PNTR , INSL , CARP , OMCH , ELEC ,
QA
22 KE PC
5.5 PFTR , QA 22 KE PC
5.6 PFTR , QA 22 KE PC
5.7 PFTR , QA 22 KE PC
5.8 PFTR , QA 22 KE PC
5.9 PFTR , QA 22 KE PC
5.10 PFTR , QA 22 KE PC
5.11 SFTR 22 KE PC
5.12 PNTR , QA 22 KE PC
Structural, Sheet Metal, and Insulation Work: CFM: for all paint, grit, including disposal cost, thinner, fire watch cost, lead analysis and sampler cost, air compressor rental cost and fuel oil cost for air hose test, deck covering, tile, wear resistant deck tile, weld pin, --- continue to below ---
22 MQ CS
--- continued from above --- asbestos sampler cost and analysis cost for duct, compartment insulation, gasket for heater, and deck covering, adhesive for laminate, wallpaper, and insulation, misc such as electrodes, gases, fastener, covering materials, and other consumable.
22 MQ CS
Machinery Work CFM: for label plate (L1 of SH2 on DWG 8474276), label plate mount and Misc (plastic sheets/bags and other consumable).
22 MQ CS
Electrical Work CFM: for cable band, rubber, steel strapping, fastener, tape, cable strap, rubber strip, electrical tie down strap, air compressor rental cost, fuel oil cost, asbestos sample and analysis cost, plastic sheet/tape and other consumable.
22 MQ CS
Piping Work CFM: or electrode, brazing rod, flux for brazing, argon gas, nitrogen gas, acetylene gas, oxygen gas, plastic sheet, covering material, tape, plastic bag, disposable coverall, saw blade, paint --- continue to below ---
22 MQ CS
--- continued from above --- bulk sample cost for asbestos, analysis cost, sample cost for lead paint, NDT cost, air compressor rental cost, Fuel oil cost, asbestos disposal cost fire watch cost and other consumable material (MISC).
22 MQ CS
Lagging Work CFM: for asbestos sampler and analysis cost, wire, covering material, painting material and other consumable material (MISC).
22 MQ CS
Process Funding Document. 10 CT OM
Version-1: revised title of Ref. No. 4.
C231B R. Takagi, 03/05/2025 -/Y/N.
V-01
TGI NO.: 80964K HVAC LOAD
CTR
AY A 0
FOUO
M-1
SHIP: LCC-19 CHG/VER: 2/1
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
80964K HVAC LOAD CTR AY A 0 1
CU PHASE TITLE:
(RE) F/O - S/A 80964K, ACCOMPLISH LCC 19 ESLP AIR CONDITIONING LOAD CENTER 1-4
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
1 LAR SRFY-0221-24 -
2 LAR SRFY-0258-24 -
3 LAR SRFY-0212-24 -
4 LCC19-302/303-ELM-25007 -
5 509-8786566
6 LAR SRF-02222-24 -
JOB ORDER: KEY OP:
3819P51206 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
100 M INSULATI, ORDERED FOR KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9Q 5640 008096312 NA 4 N 20/EA
101 M SOUND CO, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9Q 5640 007565866 NA 4 N 20/SH
102 M TAPE,TEX, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 8315 002671632 NA 4 N 20/RO
NOTES:
CTR
AY A 0
FOUO
M-2
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
103 M TAPE,TEX, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 8315 002671633 NA 4 N 20/RO
104 M SHEET,ME, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 9535 002326866 NA 4 N 10/SH
105 M SHEET,ME, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 9535 010931648 NA 4 N 3/SH
106 M SHEET,METAL, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 9515 002306675 NA 4 N 1/SH
107 M SHEET,METAL, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 9515 002306675 NA 4 N 1/SH
108 M ADHESIVE, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 8040 008419773 NA 4 Y 5/PT
109 M ADHESIVE, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 8040 002738708 NA 4 Y 5/GL
110 M SEALING, ORDERED FOR KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9B 8030 001742588 NA 4 Y 4/GL
111 M CARPET, DDD-C-95, TY,
CARPET, 100 PERCENT WOOL,
DDD-C-95 TYPE II (VELVET)
CLASS 1 (SINGLE CUT PILE),
COLOR: BLUE PLUSH, *
MAXIMUM WIDTH IS 12FT.
SIZE: 3'X5'
ORDERED FOR XKTR
ORIG: C231B, Y.MATSUYAMA,
PHONE: 243-4476
LL4580574 NA 4 N 15/SF
112 M WALLCOVERING, VINYL
FABRIC WALLCOVERING,
CCC-W-408 TYPE II
ROLL SIZE: LENGTH 30 YD
WIDTH 52"/54"
WEIGHT: 20 OZ
PATTERN LB2-4063
ORDERED FOR KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
NA 4 N 1/RO
CTR
AY A 0
FOUO
M-3
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
113 M LAMINATED PLASTIC SH,
LAMINATED PLASTIC SHEET,
SIZE: 48"X96"X0.05"THK,
COLOR: TRADING WALNUT,
MIL-P-17171 PRODUCT
TYPE: 605,
PARTS NO.: 4197-WM
REQUIRED SPECIAL PACKAGE
FOR DAMAGE PROTECTION
ORDERED FOR KTR
ORIGINATOR: C231B Y.
MATSUYAMA 243-4476
NA 4 N 1/SH
114 M MATTING,, ORDERED FOR
KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9Q 7220 010249040 NA 4 N 1/RO
115 M WELDING, WELDING THREAD,
LONMAT XL NO.5XL, SIZE:
4MM DIA X 500FT, BLUE
COLOR (NO.5)
ORDERED FOR KTR
ORIG: C231B Y, MATSUYAMA
PHONE: 243-4476
9Z 5330 LL4612692 NA 4 N 1/RO
116 M ADHESIVE, CONSIST OF
SA5501 PART A EPOXY RESIN
AND SB5501 PART B EPOXY
HARDENER, ADHESIVE FOR A
PART OF WEAR RESISTANT
DECK TILE SYSTEM, MIL-PRF-
32170 CLASS I, 1 GALLON/KIT.
*GSA ADVANTAGE ITEM* SRF
AUL#: N0657, LSN: 8040-LL-
N05-2939 (OLD LSN: 8040-LL-
N04-8289)
ORDERED FOR KTR
ORIG: C231B Y, MATSUYAMA
PHONE:
LLN052939 NA 4 Y 2/KT
150 65 1 M PLATE,ME, SIZE: 2 FT X 2 FT-
6", ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9515 001533184 NA 4 N 50555199 5/SF
151 66 1 M BAR,METAL,FLAT, BAR,
METAL, FLAT,
SPEC: MIL-S-22698 GRADE A
(ASTM A36),
SIZE: 1" X 3/16"THK,
MATL: STEEL,
QTY: 10 FT (ONE
CONTINUOUS LENGTH
REQUIRED) X 1 EA,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
LL4658339 NA 4 N 10/FT
152 2 M ANGLE,STRUCTURAL, ORDER
FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9520 009545651 NA 4 N 50555175 20/FT
CTR
AY A 0
FOUO
M-4
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
153 3 M LABEL PLATE, MANUFACTURE
LABEL PLATE IAW ATTACHED
DETAILS.
THE ORIGINATOR WILL
PROVIDE THE LABEL PLATE
DETAILS.
AVAILABLE LOCAL SOURCE:
MISATO TRADING CO LTD
(CAGE: JS799),
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9905 LL1111111 NA 4 N 50697499 5/EA
200 M VALVE,SOLENOID, ORIG: C232
K. NAKAMURA, 070-7787-1977
ORDERED FOR KTR
ITEM NO. V2 OF DWG 8474275
3B 4810 013137633 NA 4 N 50455464 1/EA
201 M GASKET, ORIG: C232 K.
NAKAMURA, 070-7787-1977
ORDERED FOR KTR
1/8” THK, MIL-DTL-24696 TY II
FOR CHW BUTTERFLY VLVS
9B 5330 013865379 NA 4 N 50455197 2/SH
300 M TAPE, PRES SENSITIV, ORIG:
C233 Y.SHINOHARA 080-9350-
ORDERED FOR KTR
9Q 7510 001325109 NA 4 N 1/RO
301 M CABLE,POWER,ELECTRI,
ORIG: C233 Y.SHINOHARA 080-
9350-1451
ORDERED FOR KTR
9B 6145 012019497 NA 4 N 50/FT
302 M STANDOFF, ORIG: C233
Y.SHINOHARA 080-9350-1451
ORDERED FOR KTR
9B 5340 002829526 NA 4 N 1/HD
303 M HEATER,THERMAL RELE,
ORIG: C233 Y.SHINOHARA 080-
9350-1451
ORDERED FOR KTR
9B 5999 005049162 NA 4 N 2/EA
350 1 4 M STANDOFF, ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5340 002726544 NA 4 N 50555189 1/HD
351 2 4 M STANDOFF, ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5340 002829526 NA 4 N 50555188 1/HD
352 3 4 M PAD, TAP, PAD, TAPPED
ROUND, 1/2"-13UNC-2B X 1"LG,
STEEL, CARBON, AISI-1020,
CENTERED, CONCENTRIC
INTERNAL THREAD THRU
HOLE 1" OD, FINISH: PLAIN.
BIW CATALOG NO.53204-082,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5315 LL9307892 NA 4 N 50557450 70/EA
353 4 4 M PAD, TAPPED ROUND, PAD,
TAPPED ROUND, 1/4"-20UNC-
2B X 2"LG, STEEL, CARBON,
AISI-1020, CENTERED,
CONCENTRIC INTERNAL
THREAD THRU HOLE 5/8" OD,
FINISH: PLAIN.
BIW CATALOG NO.53204-171,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9B 5340 LL9813197 NA 4 N 50697501 10/EA
CTR
AY A 0
FOUO
M-5
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
354 5 4 M ANGLE,ST, ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9520 002774913 NA 4 N 50555191 20/FT
355 6 4 M ANGLE,STRUCTURAL, ORDER
FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
3B 9520 009545666 NA 4 N 50555174 20/FT
356 7 4 M PIPE,METALLIC, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 4710 002785349 NA 4 N 50555177 20/FT
357 8 4 M BAR,METAL, ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9510 001891557 NA 4 N 50555172 10/FT
358 8 4 M BAR,METAL, ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9510 001891557 NA 4 N 50555173 10/FT
359 9 4 M SHEET,METAL, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9515 002044525 NA 4 N 50555176 1/SH
360 10 4 M PLATE,ME, SIZE: 1 FT X 1 FT,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9515 002375333 NA 4 N 50555197 1/SF
361 11 4 M ANGLE DOWNCOMER, ANGLE
DOWNCOMMER, NAVY TYPE,
WELD MOUNTING,
LENGTH: 20”,
MATL: STEEL,
REMARKS: PART NUMBER
EQUALS ONE PAIR.
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5975 LL9609237 NA 4 N 50697523 10/PR
362 12 4 M ANGLE DOWNCOMER, ANGLE
DOWNCOMMER, NAVY TYPE,
WELD MOUNTING,
LENGTH: 30”,
MATL: STEEL,
REMARKS: PART NUMBER
EQUALS ONE PAIR.
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
NA 4 N 10/PR
363 13 4 M WIREWAY,CROSSTIER,
WIREWAY, CROSSTIER,
LENGTH: 11",
MATL: STEEL,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5975 LL4948109 NA 4 N 50697522 10/EA
364 14 4 M HANGER,CABLE, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9B 5975 015069602 NA 4 N 50555178 10/EA
CTR
AY A 0
FOUO
M-6
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
365 15 4 M STUFFING TUBE, STL, ,
STUFFING TUBE, SWAGE,
COMPLETE WITH GLAND NUT
& GLAND RING,
SPEC: MIL-S-24235/18,
SIZE B,
LENGTH: 6.75",
MATL: STEEL,
RT&D: 0B6SC,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5975 LL4723252 NA 4 N 50697521 1/EA
366 16 4 M STUFFING TUBE, STL, ,
STUFFING TUBE, SIZE-C,
11"LG, STEEL, COMPLETE
WITH GLAND NUT AND GLAND
RING, MIL-S-24235/18,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5975 LL4462801 NA 4 N 50697520 1/EA
367 17 4 M STUD,WELDING, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5307 013255380 NA 4 N 50555179 20/EA
368 18 4 M STUD,WELDING, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5307 012789668 NA 4 N 50555180 20/EA
369 19 4 M REDUCING ADAPTER,
REDUCING ADAPTER,
HOST TUBE: D,
EFFECTIVE REDUCTION SIZE:
C, MATL: STEEL,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
NA 4 N 10/EA
370 20 4 M REDUCING ADAPTER,
REDUCING ADAPTER,
HOST TUBE: E,
EFFECTIVE REDUCTION SIZE:
C, MATL: STEEL,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
NA 4 N 10/EA
371 21 4 M PLATE HANGER,BOTTOM,
PLATE HANGER, BOTTOM
LOADING,
LENGTH: 7",
MATL: STEEL,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
NA 4 N 10/EA
372 22 4 M STUFFING TUBE, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5975 010167079 NA 4 N 50555181 10/EA
373 23 4 M STUFFING TUBE, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5975 010167607 NA 4 N 50555182 10/EA
374 24 4 M STUFFING TUBE, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9B 5975 010167608 NA 4 N 50555183 10/EA
CTR
AY A 0
FOUO
M-7
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
375 M LABEL PLATE, MANUFACTURE
LABEL PLATE IAW ATTACHED
DETAILS.
THE ORIGINATOR WILL
PROVIDE THE LABEL PLATE
DETAILS.
AVAILABLE LOCAL SOURCE:
MISATO TRADING CO LTD
(CAGE: JS799),
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9905 LL1111111 NA 4 N 50697500 2/EA
400 M INSULATION PIPE,
INSULATION, PIPE, BRAND: K-
FLEX ECO, SPECIFICATION
COMPLIANCE:EB 4013, FOR
SIZE: 1/2" IPS, SIZE: 7/8" ID X
3/4" THK X 6FT LG, UI: EA/6
FT(ONE CONTINUOUS
LENGTH REQUIRED), MATL:
NON-HALOGEN, 21EA/BOX.
**GSA ADVANTAGE ITEM*
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5970 LL4783092 NA 4 N 50457409 2/EA
401 M INSULATION, PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 3/4" IPS,
SIZE: 1-1/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5640 LL9607842 NA 4 N 50457410 15/EA
402 M INSULATION, PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 1" IPS,
SIZE: 1-3/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5970 LL4783096 NA 4 N 50457412 38/EA
403 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR SIZE: 1-1/4" IPS,
SIZE: 1-5/8" ID X 3/4" THK X 6FT
LG, UI: EA/6 FT(ONE
CONTINUOUS LENGTH
REQUIRED),
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5640 LL4783095 NA 4 N 50457414 2/EA
CTR
AY A 0
FOUO
M-8
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
404 M INSULATION, PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 2-1/8" OD TUBE,
SIZE: 2-1/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5970 LL9607843 NA 4 N 50457416 10/EA
405 M INSULATION PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 2" IPS,
SIZE: 2-3/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN, 8
EA/BOX.
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5970 LL9607844 NA 4 N 50457417 10/EA
406 M INSULATION, PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 2-1/2" IPS,
SIZE: 2-7/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5970 LL9607845 NA 4 N 50457419 15/EA
407 M INSULATION, PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 3" IPS,
SIZE: 3-1/2"ID X 3/4" THK X 6 FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
5EA/BOX. *MUST BE ORDERED
IN MULTIPLES OF 5EA*
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
9B 5970 LL9607846 NA 4 N 50457421 4/EA
CTR
AY A 0
FOUO
M-9
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
408 M INSULATION PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4-1/8" OD TUBE,
SIZE: 4-1/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5970 LL9607847 NA 4 N 50457423 2/EA
409 M INSULATION, PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4" IPS,
SIZE: 4-1/2" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5970 LL9607848 NA 4 N 50457425 2/EA
410 M INSULATION, PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 8" IPS,
SIZE: 8-5/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5970 LL9607851 NA 4 N 50457430 4/EA
411 M INSULATION SHEET,
INSULATION, FLAT SHEET,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR SIZE: 36”W X
48”L X 3/4” THK, MATL: NON-
HALOGEN,
**GSA ADVANTAGE
AVAILABLE**
8SH/BOX.
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5640 LL9607854 NA 4 N 50457433 5/SH
412 M ADHESIVE, ADHESIVE FOR
CLOTH,
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 8040 002738708 NA 4 Y 50455113 6/GL
413 M ADHESIVE, ADHESHIVE
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
9B 8040 008419773 NA 4 Y 50455177 9/PT
CTR
AY A 0
FOUO
M-10
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
414 M SEALING COMPOUND, VAPOR
BARRIER COATING FOR
INSULATED REFRIGERANT
AND CHILLED WATER LINES
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 8030 001742588 NA 4 Y 50455251 5/GL
415 M CLOTH,PLAIN WEAVE, CLOTH
WEIGHT: 8.50 OUNCES PER
SQUARE YARD PLUS OR
MINUS 0.10 (10%) OUNCES
PER SQUARE YARD; LENGTH:
50 YARDS PLUS OR MINUS 5
YARDS; WIDTH: 60 INCHES
PLUS OR MINUS 1 INCH
COLOR: NATURAL BOTH
SIDES
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 8305 001487363 NA 4 N 50455371 1/RO
416 M INSULATI, INSULATION,
FIBROUS GLASS, THERMAL,
BLANKET WITHOUT BINDER,
UNFACED, SIZE: 5FT W X 45FT
L X 1"THK, MIL-DTL-32585,
TYPE I, FORM 3, NSN: 5640-00-
173-6591 (NSN MISTAKENLY
INDICATES FACING D, BUT
CORRECT ITEM IN THIS NSN
IS UNFACED.)
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9Q 5640 LL9607458 NA 4 N 50457435 1/RO
417 M CLOTH,PLAIN WEAVE, CLOTH,
PLAIN WEAVE, H/W,
(NATURAL)
GLASS CLOTH, 5’ X50YD, 17.5
OZ
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 8305 001487364 NA 4 N 50455372 1/RO
418 M CEMENT,INSULATION,H,
CEMENT, 45LB/BG,
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9Q 5640 002264540 NA 4 Y 50455375 3/BG
419 M KEICAL A, "KEICAL ACE SUP
SILICA, TOMBO, 1/2" X 1-
1/4"THK (30MM) X 2FT LENGTH
(610MM), 35EA/BOX. *MUST BE
ORDERED IN MULTIPLES OF
35EA** EQUAL TO INDUSTRIAL
INSL GROUP(DESIGNATED
MFR BY QPL-2781) MODEL#
THERMO-12 GOLD, BUT IT
DOES NOT HAVE
1/4""INCREMENTS THK
ORDERED FOR KTR
ORIG: C234 T. TSUNOI,070-
9Q 5640 LL4465715 NA 4 N 50457800 35/EA
CTR
AY A 0
FOUO
M-11
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
420 M INSULATI, INSULATION, FLAT
SHEET, BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR SIZE: 36”W X
48”L X 3/4” THK, MATL: NON-
HALOGEN,
**GSA ADVANTAGE
AVAILABLE**
8SH/BOX.
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5640 LL9607854 NA 4 N 50567435 3/SH
421 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 8" IPS,
SIZE: 8-5/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 5640 LL9607851 NA 4 N 50567436 2/EA
422 M ADHESIVE, ADHESIVE FOR
CLOTH,
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 8040 002738708 NA 4 Y 50555196 20/GL
423 M ADHESIVE, ADHESHIVE
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 8040 008419773 NA 4 Y 50555195 10/PT
424 M SEALING COMPOUND, VAPOR
BARRIER COATING FOR
INSULATED REFRIGERANT
AND CHILLED WATER LINES
ORDERED FOR KTR
ORIG: C234 T. TSUNOI, 070-
7787-2058
9B 8030 001742588 NA 4 Y 50555194 15/GL
430 M PIPE, 8"IPS, PIPE, 8" IPS, CU-NI
90-10, MIL-T-16420, CL 200
9B 4710 006048050 NA 4 N 5/FT
431 M SLV, 8" IPS, SLEEVE, SIZE:
8"IPS, BUTT WELD, CNA 90-10,
200PSI, ASME B16.9
NSN 4730-00-722-5477
9C 4730 LL4462375 NA 4 N 8/EA
432 M BR, 8" IPS, BACKING RING, 8"
IPS, CU-NI 90-10
9C 4730 LL4558792 NA 4 N 8/EA
433 M SLV, 1" IPS, SLEEVE, BUTT
WELD, 1"IPS, CU-NI 90-10, 200
PSI, DWG 810-1385880
PREMIER COPPER P/N:
88008200
9C 4730 LL4742596 NA 4 N 2/EA
CTR
AY A 0
FOUO
M-12
SHIP: LCC-19 CHG/VER: 2/1
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
434 F13 5 M PIPE HANGER, PIPE HANGER,
SIZE: 1"IPS X 24"LG, MATL:
STEEL, LINER: 1/8"THK
NEOPRENE RUBBER, 60
DUROMETER,
DWG: 810-4714432 TYPE 5,
PH435200 (W&O P/N
548437.200)
ORDER FOR KTR
ORIG: C234 M. MOTOHASHI,
243-2373
9B 4730 LL9100289 NA 4 N 10/EA
435 M PIPE HANGER, PIPE HANGER,
1"IPS X 15"LEG LG, TY 1,
STEEL,
LINED WITH RUBBER MIL-R-
6855 CLASS II 60
DUROMETER. DWG: 810-
4714432 TYPE I
ORDERED FOR KTR
ORIG: C234 M. MOTOHASHI,
243-2373
9C 4730 LL9002223 NA 4 N 10/EA
436 M SLV, 1" IPS, SLEEVE, BUTT
WELD, 1"IPS, CU-NI 90-10, 200
PSI, DWG 810-1385880
PREMIER COPPER P/N:
88008200
9C 4730 LL4742596 NA 4 N 2/EA
437 M BR, 1" IPS, BACKING RING,
1"IPS, CNA 90/10, 200PSIG
LL4558773 NA 4 N 2/EA
450 P1 6 M TUBE,METALLIC, ORDER FOR
KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 4710 002774624 NA 4 N 50555184 20/FT
451 F1 6 M ELBOW,PI, ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 4730 005425226 NA 4 N 50555187 4/EA
452 F2 6 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 2-1/8" OD TUBE,
SIZE: 2-1/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 5640 LL9607843 NA 4 N 50557451 3/EA
453 F3 6 M PIPE HANGER, PIPE HANGER,
SIZE: 1-1/2"IPS X 15"LG. MATL:
STEEL, LINER WITH RUBBER
MIL-R-6855 CLASS II 60
DUROMETER. DWG: 810-
4714432 TYPE I,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
LL9301415 NA 4 N 2/EA
454 F4 6 M CLOTH,PL, ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9B 8305 001487363 NA 4 N 50555192 1/RO
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 80964K HVAC LOAD CTR AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P51206 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 80964K HVAC LOAD CTR AY A 0
SKETCH
3869A42301A01 ENCLOSURE-01 Sheet 1 of 3
Yuuji.Matsuyama.ja Line
Yuuji.Matsuyama.ja_1 Line
Yuuji.Matsuyama.ja_2 Line
Yuuji.Matsuyama.ja_3 Line
Yuuji.Matsuyama.ja_4 Text Box
INSTALLATION OF INSULATION
Yuuji.Matsuyama.ja_5 Text Box
INSTALLATION OF INSULATION
Yuuji.Matsuyama.ja_6 Text Box
INSTALLATION OF INSULATION
Yuuji.Matsuyama.ja_7 Text Box Location for Installation of Insulation 4-30-0-L Side of 4-36-0-Q
3819P51206A01 ENCLOSURE-01 Sheet 2 of 3
Yuuji.Matsuyama.ja_8 Polygon
Yuuji.Matsuyama.ja_9 Line
Yuuji.Matsuyama.ja_10 Line
Yuuji.Matsuyama.ja_11 Line
Yuuji.Matsuyama.ja_12 Line
Yuuji.Matsuyama.ja_13 Cross-Out
Yuuji.Matsuyama.ja_14 Text Box Location for Removal of Wallpaper and Installation of…
This is the start of the file's text. The full file is on GovTribe.