This document is a Task Group Instruction (TGI) for the USS Blue Ridge, dated 13-MAR-2025, focusing on a Fan Coil Unit (FCU) testing procedure. The specific task involves conducting tightness & operational and volumetric & balance tests for the KTR (Contractor) system, referencing technical procedure TP 51211-3-302KTR. The work involves three primary groups performing the test: the contractor (22/KE), Quality Assurance (33/G1), and Support/Facilities (EXSA), each responsible for accomplishing and documenting the tests in accordance with the referenced technical procedure. The document is marked FOUO (For Official Use Only) and includes administrative details such as preparation by Nakajima Hisato and approval by Ohta Jason Y. on 13-MAR-2025, with a project number of 19P and system number 51211.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
13-MAR-2025 1532
20.14.15.2.9020 (September 2024) ICN: 3819P51206 KeyOp: T05
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51211-3-302KTR TT T 3 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51211
CU PHASE TITLE: FCU R4-108-2 (T & OP, VOL & BAL), S/A 80964K - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EXSAZC04
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NAKAJIMA, HISATO 246.2 3152434197 24-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 13-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSA-ZC04
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
512G0006
Tightness & Operational and Volumetric & Balance Test for Fan Coil Unit - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
13-MAR-2025 1532
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51206 KeyOp: T05
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51211-3-302KTR TT T 3 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51211
CU PHASE TITLE: FCU R4-108-2 (T & OP, VOL & BAL), S/A 80964K - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 51211-3-302KTR FCU (T & OP) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational and volumetric & balance test in accordance with reference, TP 51211-3-302KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational and volumetric & balance test in accordance with reference, TP 51211-3-302KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational and volumetric & balance test in accordance with reference, TP 51211-3-302KTR.
/ EXSA N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P51206 KEY OP: T05