This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, dated 11-MAR-2025, focused on a Heating System Tightness & Operational Test. The task instruction covers a specific maintenance procedure (S/A 80964K - KTR) for the ship's heating system, with work to be performed by contractors, quality assurance personnel, and support function (S/F) staff. The document references Technical Procedure TP 51111-3-300KTR and includes sections for task descriptions, references, and a material list, though no specific materials are listed in this version. Key personnel include Yuuhei Ishii (preparer), Jason Y. Ohta (approver), and Yasuhiko Takahashi (zone manager), with the work being assigned a job summary ID of 512G0006.

View the file

Other files

File Type Posted
BLR_5C1_SHIPALT_BUNDLE 5 CDRL rev.pdf PDF
N6264925RA0580004.pdf PDF
N6264925RA0580003.pdf PDF
TGI_3819P51206T03_c0v0_redact.pdf PDF
TGI_3819P25501A01_c0v0.pdf PDF
TGI_3819P51206A01_redact.pdf PDF
TGI_3819P49501T01_c0v0.pdf PDF
TGI_3819P52601_A01_c1v1.pdf PDF
TGI_3819P52302T01_redact.pdf PDF
TGI_3819P49501A01_c0v1.pdf PDF
TGI_3819P52302A01_redact.pdf PDF
TGI_3819P51206T05_c0v0_redact.pdf PDF
TGI_3819P51206T01_c0v0_redact.pdf PDF
N6264925RA0580002.pdf PDF
TGI_3819P51206T07_c0v0_redact.pdf PDF
TGI_3819P51206T04_c0v0_redact.pdf PDF
TGI_3819P49501T02_c0v0.pdf PDF
N6264925RA0580001.pdf PDF
TGI_3819P51206T02_c0v0_redact.pdf PDF
TGI_3819P51206T03_c0v0_redact.pdf PDF
TGI_3819P51206T01_c0v0_redact.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
TGI 3819P25501A01_c0v0.pdf PDF
TGI_3819P49501T01_c0v0.pdf PDF
Attachment II Proposal Breakdown Sheet.xlsx XLSX spreadsheet
Attachment VII Warranty Tracking Information.pdf PDF
TGI_3819P51206T04_c0v0_redact.pdf PDF
TGI_3819P49501T02_c0v0.pdf PDF
TGI_3819P52302T01_redac.pdf PDF
Attachment V Contract data.pdf PDF
TGI_3819P51206T05_c0v0_redact.pdf PDF
TGI_3819P51206T07_c0v0_redact.pdf PDF
TGI_3819P49501A01_c0v1.pdf PDF
TGI_3819P51206A01_redac_(1).pdf PDF
TGI_3819P52601_A01_c1v1.pdf PDF
Exhibit (A) BUNDLE 5 CDR.pdf PDF
Attachment IV RFI.docx DOCX document
TGI_3819P52302A01_redac(1).pdf PDF
2.01 N6264925RA058 Solicitation.pdf PDF
Attachment III GFP List_V3.xlsx XLSX spreadsheet
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

11-MAR-2025 1554

20.14.15.2.9020 (September 2024) ICN: 3819P51206 KeyOp: T02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51111-3-300KTR TT T 7 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51111

CU PHASE TITLE: HEATING SYS (T & OP), S/A 80964K - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EXSAZC04

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ISHII, YUUHEI 246.2 3152434302 24-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 10-MAR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSA-ZC04

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

TAKAHASHI, YASUHIKO U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

512G0006

Tightness & Operational Test for Heating System S/A 80964K - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

11-MAR-2025 1554

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51206 KeyOp: T02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51111-3-300KTR TT T 7 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51111

CU PHASE TITLE: HEATING SYS (T & OP), S/A 80964K - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 51111-3-300KTR HEATING SYSTEM (T & OP) -

KTR

LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51111-3-300KTR.

22/KE PC N

(G) QA work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51111-3-300KTR.

33/G1 QA N

(S) S/F work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51111-3-300KTR.

/ EXSA N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P51206 KEY OP: T02