Temporary Facility T-2728

Awarded Award Notice Posted

Solicitation number
FA8219-18-R-0010
Agency
AFLCMC Hill AFB Lifecycle Management Center, Department of Defense
Awarded
to Boxx Modular, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
FA8219-18-C-0010 Federal contract award
NAICS code
332311 Prefabricated Metal Building and Component Manufacturing
PSC
Not on record
Place of performance
North of 6008 Wardleigh Road, Building 1580 Hill Air Force Base, Utah 84056, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Added: Feb 28, 2018 6:58 pm Modified: Apr 10, 2018 7:24 pmTrack Changes Amended 10 April 2018



The purpose of this Amendment is to:
1. Revise the List of Documents, Exhibits or Attachments as follows:


a) Attachment 1, Statement of Work Para. 2. updated to reflect supersession
of Attachment 1A – Workspace Specifications over Attachment 1D
telecommunications installation criteria


FROM:
Attachment 1D – Telecommunications Installation Criteria for Facility Design and Renovation


TO:
Attachment 1D – Telecommunications Installation Criteria for Facility Design and Renovation, where not superseded by Attachment 1A – Workspace Specifications


b) Attachment 1A, Workspace Specifications for Temporary
Facility is updated to reflect accurate requirements


c) Attachment 3, FAR Clause 52.212-1 Addendum


d) Attachment 4, FAR Clause 52.212-2 Addendum


2. Extend the proposal due date:


FROM: 12 April 2018 at 2:00 p.m. Mountain Daylight Time.


TO: 17 April 2018 at 2:00 p.m. Mountain Daylight Time.


All other terms and conditions remain unchanged.

-------------------------------------------------------------------------------------------------
Amended 27 March 2018


The purpose of this Amendment is to: 
1. Revise the List of Documents, Exhibits or Attachments as follows:
a) Attachment 4, FAR Clause 52.212-2 Addendum:
· 2. a. Evaluation Factors and Subfactors Factor 1: Technical is updated to reflect design proposal requirements:
FROM:
· Subfactor 1: 60% Design Proposal
TO:
· Subfactor 1: Design Proposal

2. Incorporate Vendor Questions, Comments, and Answers as part of the Federal Business Opportunities (FBO) notice.
-------------------------------------------------------------------------------------------------

Amended 23 March 2018

The purpose of this Amendment is to:


1. Revise the List of Documents, Exhibits or Attachments as follows:


a) Attachment 1, Statement of Work:


· Para. 1. Updated to reflect facility area and parking lot lighting.
· Para. 2. Attachment 1E - Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities (IC tech spec for ICD/ICS 705) is updated.
· Para. 2. Attachment 1L - Site Map is updated.
· Para. 3.1.5.6. Updated to reflect facility area and parking lot lighting.
· Para. 3.2.2. Updated to reflect CDRL reference.
· Para. 3.2.6. Updated to reflect Americans Disability Act requirements.
· Para. 3.2.8. Updated to reflect OSHA Standards.
· Para. 3.2.18.1. Updated to reflect CDRL reference.
· Para. 3.2.18.2. Updated to reflect facility area and parking lot lighting.
· Para. 3.2.18.7. Incorporated to reflect connection requirements.
· Para. 3.2.21.3. Updated to reflect accident safety mishap reporting and CDRL reference.


b) Attachment 1A, Workspace Specifications for Temporary Facility is updated to reflect accurate bathroom requirements, cells A-G36 and 37, 20 and independent work spaces, cells A-G 181 are updated to reflect six foot (6') work desks.


c) Attachment 1E, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities (IC tech spec for ICD/ICS 705), is updated to Version 1.4 dated 28 September 2017.


d) Attachment 1L, Site Map, is updated to reflect additional information.


e) Attachment 3, FAR Clause 52.212-1 Addendum:


· Paragraph 5.3.3. is updated to reflect a proposal guarantee (bid bond) in the amount of 20%.


2. Extend the proposal due date:


FROM: 29 March 2018 at 2:00 p.m. Mountain Standard Time


TO: 12 April 2018 at 2:00 p.m. Mountain Daylight Time.


-------------------------------------------------------------------------------------------------

Amended 14 March 2018

The purpose of this Amendment is to:

1. Revise or add to the List of Documents, Exhibits or Attachments as follows:


a) Attachment 1, Statement of Work:


· Para 1. Updated to reflect a single story requirement
· Para 2. Add Attachment 1N - AFNWC Comm Req (SCOIW)
· Deleted 3.1.5.5.1. in its entirety.
· Deleted 3.2.17. in its entirety.
· Deleted 3.2.17.1. in its entirety.
· Deleted 3.2.20.2. in its entirety.
· Revised the table at 3.2.28.


b) Attachment 1A, Workspace Specifications for Temporary Facility double-door Intelligence Community Directive (ICD)705/Intelligence Community Standard (ICS) 705-1 construction procedures are deleted from cell G10.


c) Attachment 1F, Air Force Furnishings Commodity Council Contract Requirements is revised with current Utah vendor points of contact.


d) Attachment 1N, Communication Requirements, is incorporated.


e) Attachment 3, FAR Clause 52.212-1 Addendum, Paragraph 3.2 is updated to reflect UFC requirements, UFGS format, and design stamps. Paragraphs 3.3 and 3.4 are updated to reflect a single story requirement. Paragraph 5.3.3. is updated to further outline proposal guarantee (bid bond) requirements.


f) Attachment 4, FAR Clause 52.212-2 Addendum, Subfactor 1 is updated to reflect UFC requirements, UFGS format, and design stamps. Subfactors 2 and 3 are updated to reflect a single story requirement


g) Attachment 8, CDRLs A001, A002, and A003 are renumbered A028, A112, and A071 respectively.


2. Delete FAR Provision 52.232-13 Notice of Progress Payments from the solicitation.


3. Add DFARS Clause 252.232-7007 Limitation of Government's Obligation


----------------------------------------------------------------------------------------------

28 February 2018

This Request for Proposal (RFP) defines the requirements to procure a pre-fabricated temporary office facility, not to exceed 24,530 square feet, for 204 personnel; perform all required site preparation (earthwork, foundations, exterior utilities, sidewalks, area lighting, parking lots, access roads, etc.); to assemble and install the portable facilities at Hill Air Force Base, Utah; procure and install all system furniture, chairs and cubicles.

***A pre-proposal conference will be conducted at Site location of proposed temporary pre-fabricated facility T-2728 on Tuesday, 13 March 2018 at 09:00 a.m. Mountain Standard Time for the purpose of answering questions regarding this solicitation in accordance with Air Force Federal Acquisition Regulation Supplement (AFFARS) 5352.215-9001

What: Pre-proposal conference
When: 13 March 2018 at 09:00 a.m. Mountain Standard Time
Where: Building 1580 north parking lot
6008 Wardleigh Road
Hill Air Force Base, Utah
84056


Please confirm attendance (RSVP) no-later-than 02:00 p.m. Mountain Standard Time on 09 March to Brogan Fullmer.


What: RSVP (Répondez s'il vous plaît)
When: 09 March 2018 at 02:00 p.m. Mountain Standard Time
To: Brogan Fullmer, Brogan.Fullmer@US.AF.Mil
Provide: Visitor's first and last name, driver's license number, state of driver's license issue***


****To obtain visitor pass, please visit the Hill Air Force Base South Gate Visitors Center


Where: Building 542, Bernard Fisher Highway (State Road 193, 700 S) S Gate Avenue****


*****To reach the South Gate Visitors Center from Interstate-15:


- Take I-15 the Clearfield exit at 700 S
- Turn right onto Bernard Fisher Highway (State Road 193, 700 S)
- Turn left onto Hill Field Road
- The Visitors Center is on the right (east side) of the road*****

Update #5 ·

Added: Feb 28, 2018 6:58 pm Modified: Mar 27, 2018 11:45 amTrack Changes Amended 27 March 2018


The purpose of this Amendment is to: 
1. Revise the List of Documents, Exhibits or Attachments as follows:
a) Attachment 4, FAR Clause 52.212-2 Addendum:
· 2. a. Evaluation Factors and Subfactors Factor 1: Technical is updated to reflect design proposal requirements:
FROM:
· Subfactor 1: 60% Design Proposal
TO:
· Subfactor 1: Design Proposal

2. Incorporate Vendor Questions, Comments, and Answers as part of the Federal Business Opportunities (FBO) notice.
-------------------------------------------------------------------------------------------------

Amended 23 March 2018

The purpose of this Amendment is to:


1. Revise the List of Documents, Exhibits or Attachments as follows:


a) Attachment 1, Statement of Work:


· Para. 1. Updated to reflect facility area and parking lot lighting.
· Para. 2. Attachment 1E - Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities (IC tech spec for ICD/ICS 705) is updated.
· Para. 2. Attachment 1L - Site Map is updated.
· Para. 3.1.5.6. Updated to reflect facility area and parking lot lighting.
· Para. 3.2.2. Updated to reflect CDRL reference.
· Para. 3.2.6. Updated to reflect Americans Disability Act requirements.
· Para. 3.2.8. Updated to reflect OSHA Standards.
· Para. 3.2.18.1. Updated to reflect CDRL reference.
· Para. 3.2.18.2. Updated to reflect facility area and parking lot lighting.
· Para. 3.2.18.7. Incorporated to reflect connection requirements.
· Para. 3.2.21.3. Updated to reflect accident safety mishap reporting and CDRL reference.


b) Attachment 1A, Workspace Specifications for Temporary Facility is updated to reflect accurate bathroom requirements, cells A-G36 and 37, 20 and independent work spaces, cells A-G 181 are updated to reflect six foot (6') work desks.


c) Attachment 1E, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities (IC tech spec for ICD/ICS 705), is updated to Version 1.4 dated 28 September 2017.


d) Attachment 1L, Site Map, is updated to reflect additional information.


e) Attachment 3, FAR Clause 52.212-1 Addendum:


· Paragraph 5.3.3. is updated to reflect a proposal guarantee (bid bond) in the amount of 20%.


2. Extend the proposal due date:


FROM: 29 March 2018 at 2:00 p.m. Mountain Standard Time


TO: 12 April 2018 at 2:00 p.m. Mountain Daylight Time.


-------------------------------------------------------------------------------------------------

Amended 14 March 2018

The purpose of this Amendment is to:

1. Revise or add to the List of Documents, Exhibits or Attachments as follows:


a) Attachment 1, Statement of Work:


· Para 1. Updated to reflect a single story requirement
· Para 2. Add Attachment 1N - AFNWC Comm Req (SCOIW)
· Deleted 3.1.5.5.1. in its entirety.
· Deleted 3.2.17. in its entirety.
· Deleted 3.2.17.1. in its entirety.
· Deleted 3.2.20.2. in its entirety.
· Revised the table at 3.2.28.


b) Attachment 1A, Workspace Specifications for Temporary Facility double-door Intelligence Community Directive (ICD)705/Intelligence Community Standard (ICS) 705-1 construction procedures are deleted from cell G10.


c) Attachment 1F, Air Force Furnishings Commodity Council Contract Requirements is revised with current Utah vendor points of contact.


d) Attachment 1N, Communication Requirements, is incorporated.


e) Attachment 3, FAR Clause 52.212-1 Addendum, Paragraph 3.2 is updated to reflect UFC requirements, UFGS format, and design stamps. Paragraphs 3.3 and 3.4 are updated to reflect a single story requirement. Paragraph 5.3.3. is updated to further outline proposal guarantee (bid bond) requirements.


f) Attachment 4, FAR Clause 52.212-2 Addendum, Subfactor 1 is updated to reflect UFC requirements, UFGS format, and design stamps. Subfactors 2 and 3 are updated to reflect a single story requirement


g) Attachment 8, CDRLs A001, A002, and A003 are renumbered A028, A112, and A071 respectively.


2. Delete FAR Provision 52.232-13 Notice of Progress Payments from the solicitation.


3. Add DFARS Clause 252.232-7007 Limitation of Government's Obligation


----------------------------------------------------------------------------------------------

28 February 2018

This Request for Proposal (RFP) defines the requirements to procure a pre-fabricated temporary office facility, not to exceed 24,530 square feet, for 204 personnel; perform all required site preparation (earthwork, foundations, exterior utilities, sidewalks, area lighting, parking lots, access roads, etc.); to assemble and install the portable facilities at Hill Air Force Base, Utah; procure and install all system furniture, chairs and cubicles.

***A pre-proposal conference will be conducted at Site location of proposed temporary pre-fabricated facility T-2728 on Tuesday, 13 March 2018 at 09:00 a.m. Mountain Standard Time for the purpose of answering questions regarding this solicitation in accordance with Air Force Federal Acquisition Regulation Supplement (AFFARS) 5352.215-9001

What: Pre-proposal conference
When: 13 March 2018 at 09:00 a.m. Mountain Standard Time
Where: Building 1580 north parking lot
6008 Wardleigh Road
Hill Air Force Base, Utah
84056


Please confirm attendance (RSVP) no-later-than 02:00 p.m. Mountain Standard Time on 09 March to Brogan Fullmer.


What: RSVP (Répondez s'il vous plaît)
When: 09 March 2018 at 02:00 p.m. Mountain Standard Time
To: Brogan Fullmer, Brogan.Fullmer@US.AF.Mil
Provide: Visitor's first and last name, driver's license number, state of driver's license issue***


****To obtain visitor pass, please visit the Hill Air Force Base South Gate Visitors Center


Where: Building 542, Bernard Fisher Highway (State Road 193, 700 S) S Gate Avenue****


*****To reach the South Gate Visitors Center from Interstate-15:


- Take I-15 the Clearfield exit at 700 S
- Turn right onto Bernard Fisher Highway (State Road 193, 700 S)
- Turn left onto Hill Field Road
- The Visitors Center is on the right (east side) of the road*****

Update #4 ·

Added: Feb 28, 2018 6:58 pm Modified: Mar 23, 2018 6:44 pmTrack Changes -------------------------------------------------------------------------------------------------

Amended 23 March 2018

The purpose of this Amendment is to:


1. Revise the List of Documents, Exhibits or Attachments as follows:


a) Attachment 1, Statement of Work:


· Para. 1. Updated to reflect facility area and parking lot lighting.
· Para. 2. Attachment 1E - Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities (IC tech spec for ICD/ICS 705) is updated.
· Para. 2. Attachment 1L - Site Map is updated.
· Para. 3.1.5.6. Updated to reflect facility area and parking lot lighting.
· Para. 3.2.2. Updated to reflect CDRL reference.
· Para. 3.2.6. Updated to reflect Americans Disability Act requirements.
· Para. 3.2.8. Updated to reflect OSHA Standards.
· Para. 3.2.18.1. Updated to reflect CDRL reference.
· Para. 3.2.18.2. Updated to reflect facility area and parking lot lighting.
· Para. 3.2.18.7. Incorporated to reflect connection requirements.
· Para. 3.2.21.3. Updated to reflect accident safety mishap reporting and CDRL reference.


b) Attachment 1A, Workspace Specifications for Temporary Facility is updated to reflect accurate bathroom requirements, cells A-G36 and 37, 20 and independent work spaces, cells A-G 181 are updated to reflect six foot (6') work desks.


c) Attachment 1E, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities (IC tech spec for ICD/ICS 705), is updated to Version 1.4 dated 28 September 2017.


d) Attachment 1L, Site Map, is updated to reflect additional information.


e) Attachment 3, FAR Clause 52.212-1 Addendum:


· Paragraph 5.3.3. is updated to reflect a proposal guarantee (bid bond) in the amount of 20%.


2. Extend the proposal due date:


FROM: 29 March 2018 at 2:00 p.m. Mountain Standard Time


TO: 12 April 2018 at 2:00 p.m. Mountain Daylight Time.


-------------------------------------------------------------------------------------------------

Amended 14 March 2018

The purpose of this Amendment is to:

1. Revise or add to the List of Documents, Exhibits or Attachments as follows:


a) Attachment 1, Statement of Work:


· Para 1. Updated to reflect a single story requirement
· Para 2. Add Attachment 1N - AFNWC Comm Req (SCOIW)
· Deleted 3.1.5.5.1. in its entirety.
· Deleted 3.2.17. in its entirety.
· Deleted 3.2.17.1. in its entirety.
· Deleted 3.2.20.2. in its entirety.
· Revised the table at 3.2.28.


b) Attachment 1A, Workspace Specifications for Temporary Facility double-door Intelligence Community Directive (ICD)705/Intelligence Community Standard (ICS) 705-1 construction procedures are deleted from cell G10.


c) Attachment 1F, Air Force Furnishings Commodity Council Contract Requirements is revised with current Utah vendor points of contact.


d) Attachment 1N, Communication Requirements, is incorporated.


e) Attachment 3, FAR Clause 52.212-1 Addendum, Paragraph 3.2 is updated to reflect UFC requirements, UFGS format, and design stamps. Paragraphs 3.3 and 3.4 are updated to reflect a single story requirement. Paragraph 5.3.3. is updated to further outline proposal guarantee (bid bond) requirements.


f) Attachment 4, FAR Clause 52.212-2 Addendum, Subfactor 1 is updated to reflect UFC requirements, UFGS format, and design stamps. Subfactors 2 and 3 are updated to reflect a single story requirement


g) Attachment 8, CDRLs A001, A002, and A003 are renumbered A028, A112, and A071 respectively.


2. Delete FAR Provision 52.232-13 Notice of Progress Payments from the solicitation.


3. Add DFARS Clause 252.232-7007 Limitation of Government's Obligation


----------------------------------------------------------------------------------------------
28 February 2018
This Request for Proposal (RFP) defines the requirements to procure a pre-fabricated temporary office facility, not to exceed 24,530 square feet, for 204 personnel; perform all required site preparation (earthwork, foundations, exterior utilities, sidewalks, area lighting, parking lots, access roads, etc.); to assemble and install the portable facilities at Hill Air Force Base, Utah; procure and install all system furniture, chairs and cubicles.

***A pre-proposal conference will be conducted at Site location of proposed temporary pre-fabricated facility T-2728 on Tuesday, 13 March 2018 at 09:00 a.m. Mountain Standard Time for the purpose of answering questions regarding this solicitation in accordance with Air Force Federal Acquisition Regulation Supplement (AFFARS) 5352.215-9001

What: Pre-proposal conference
When: 13 March 2018 at 09:00 a.m. Mountain Standard Time
Where: Building 1580 north parking lot
6008 Wardleigh Road
Hill Air Force Base, Utah
84056


Please confirm attendance (RSVP) no-later-than 02:00 p.m. Mountain Standard Time on 09 March to Brogan Fullmer.


What: RSVP (Répondez s'il vous plaît)
When: 09 March 2018 at 02:00 p.m. Mountain Standard Time
To: Brogan Fullmer, Brogan.Fullmer@US.AF.Mil
Provide: Visitor's first and last name, driver's license number, state of driver's license issue***


****To obtain visitor pass, please visit the Hill Air Force Base South Gate Visitors Center


Where: Building 542, Bernard Fisher Highway (State Road 193, 700 S) S Gate Avenue****


*****To reach the South Gate Visitors Center from Interstate-15:


- Take I-15 the Clearfield exit at 700 S
- Turn right onto Bernard Fisher Highway (State Road 193, 700 S)
- Turn left onto Hill Field Road
- The Visitors Center is on the right (east side) of the road*****

Update #3 ·

Added: Feb 28, 2018 6:58 pm Modified: Mar 14, 2018 7:23 pmTrack Changes Amended 14 March 2018
The purpose of this Amendment is to:

1. Revise or add to the List of Documents, Exhibits or Attachments as follows:


a) Attachment 1, Statement of Work:


· Para 1. Updated to reflect a single story requirement
· Para 2. Add Attachment 1N - AFNWC Comm Req (SCOIW)
· Deleted 3.1.5.5.1. in its entirety.
· Deleted 3.2.17. in its entirety.
· Deleted 3.2.17.1. in its entirety.
· Deleted 3.2.20.2. in its entirety.
· Revised the table at 3.2.28.


b) Attachment 1A, Workspace Specifications for Temporary Facility double-door Intelligence Community Directive (ICD)705/Intelligence Community Standard (ICS) 705-1 construction procedures are deleted from cell G10.


c) Attachment 1F, Air Force Furnishings Commodity Council Contract Requirements is revised with current Utah vendor points of contact.


d) Attachment 1N, Communication Requirements, is incorporated.


e) Attachment 3, FAR Clause 52.212-1 Addendum, Paragraph 3.2 is updated to reflect UFC requirements, UFGS format, and design stamps. Paragraphs 3.3 and 3.4 are updated to reflect a single story requirement. Paragraph 5.3.3. is updated to further outline proposal guarantee (bid bond) requirements.


f) Attachment 4, FAR Clause 52.212-2 Addendum, Subfactor 1 is updated to reflect UFC requirements, UFGS format, and design stamps. Subfactors 2 and 3 are updated to reflect a single story requirement


g) Attachment 8, CDRLs A001, A002, and A003 are renumbered A028, A112, and A071 respectively.


2. Delete FAR Provision 52.232-13 Notice of Progress Payments from the solicitation.


3. Add DFARS Clause 252.232-7007 Limitation of Government's Obligation


----------------------------------------------------------------------------------------------
28 February 2018
This Request for Proposal (RFP) defines the requirements to procure a pre-fabricated temporary office facility, not to exceed 24,530 square feet, for 204 personnel; perform all required site preparation (earthwork, foundations, exterior utilities, sidewalks, area lighting, parking lots, access roads, etc.); to assemble and install the portable facilities at Hill Air Force Base, Utah; procure and install all system furniture, chairs and cubicles.

***A pre-proposal conference will be conducted at Site location of proposed temporary pre-fabricated facility T-2728 on Tuesday, 13 March 2018 at 09:00 a.m. Mountain Standard Time for the purpose of answering questions regarding this solicitation in accordance with Air Force Federal Acquisition Regulation Supplement (AFFARS) 5352.215-9001

What: Pre-proposal conference
When: 13 March 2018 at 09:00 a.m. Mountain Standard Time
Where: Building 1580 north parking lot
6008 Wardleigh Road
Hill Air Force Base, Utah
84056


Please confirm attendance (RSVP) no-later-than 02:00 p.m. Mountain Standard Time on 09 March to Brogan Fullmer.


What: RSVP (Répondez s'il vous plaît)
When: 09 March 2018 at 02:00 p.m. Mountain Standard Time
To: Brogan Fullmer, Brogan.Fullmer@US.AF.Mil
Provide: Visitor's first and last name, driver's license number, state of driver's license issue***


****To obtain visitor pass, please visit the Hill Air Force Base South Gate Visitors Center


Where: Building 542, Bernard Fisher Highway (State Road 193, 700 S) S Gate Avenue****


*****To reach the South Gate Visitors Center from Interstate-15:


- Take I-15 the Clearfield exit at 700 S
- Turn right onto Bernard Fisher Highway (State Road 193, 700 S)
- Turn left onto Hill Field Road
- The Visitors Center is on the right (east side) of the road*****

Update #2 ·

Added: Feb 28, 2018 6:58 pm Modified: Mar 06, 2018 12:03 pmTrack Changes This Request for Proposal (RFP) defines the requirements to procure a pre-fabricated temporary office facility, not to exceed 24,530 square feet, for 204 personnel; perform all required site preparation (earthwork, foundations, exterior utilities, sidewalks, area lighting, parking lots, access roads, etc.); to assemble and install the portable facilities at Hill Air Force Base, Utah; procure and install all system furniture, chairs and cubicles.

***A pre-proposal conference will be conducted at Site location of proposed temporary pre-fabricated facility T-2728 on Tuesday, 13 March 2018 at 09:00 a.m. Mountain Standard Time for the purpose of answering questions regarding this solicitation in accordance with Air Force Federal Acquisition Regulation Supplement (AFFARS) 5352.215-9001

What: Pre-proposal conference
When: 13 March 2018 at 09:00 a.m. Mountain Standard Time
Where: Building 1580 north parking lot
6008 Wardleigh Road
Hill Air Force Base, Utah
84056


Please confirm attendance (RSVP) no-later-than 02:00 p.m. Mountain Standard Time on 09 March to Brogan Fullmer.


What: RSVP (Répondez s'il vous plaît)
When: 09 March 2018 at 02:00 p.m. Mountain Standard Time
To: Brogan Fullmer, Brogan.Fullmer@US.AF.Mil
Provide: Visitor's first and last name, driver's license number, state of driver's license issue***


****To obtain visitor pass, please visit the Hill Air Force Base South Gate Visitors Center


Where: Building 542, Bernard Fisher Highway (State Road 193, 700 S) S Gate Avenue****


*****To reach the South Gate Visitors Center from Interstate-15:


- Take I-15 the Clearfield exit at 700 S
- Turn right onto Bernard Fisher Highway (State Road 193, 700 S)
- Turn left onto Hill Field Road
- The Visitors Center is on the right (east side) of the road*****

Update #1 ·

Added: Feb 28, 2018 6:58 pm This Request for Proposal (RFP) defines the requirements to procure a pre-fabricated temporary office facility, not to exceed 24,530 square feet, for 204 personnel; perform all required site preparation (earthwork, foundations, exterior utilities, sidewalks, area lighting, parking lots, access roads, etc.); to assemble and install the portable facilities at Hill Air Force Base, Utah; procure and install all system furniture, chairs and cubicles.

Attachments

Files attached to this notice, newest first
File Type Posted
12_Attachment_1A_Workspace_Specs_for_Temp_Facility_Rev_03.xlsx XLSX spreadsheet
12_Attachment_4_FAR_52212_2_Evaluation_Addendum_Temp_Fac_Rev_03.docx DOCX document
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_03.docx DOCX document
FA8219-18-R-0010-0004.pdf PDF
12_Attachment_3_FAR52212-1_Instructions_Addendum_Temp_Fac_Rev_03.docx DOCX document
12_Attachment_1L_Site_Map_Temp_Facility_and_Utilities.pdf PDF
12_Attachment_1A_Workspace_Specifications_for_Temp_Facility_Rev_02.xlsx XLSX spreadsheet
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Rev_02.pdf PDF
12_FA8219-18-R-0010-0002.pdf PDF
12_Attachment_1E_ICD_ICS_705_v1_4.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_02.pdf PDF
12_Attachment_1A_Workspace_Specifications_Temporary_Facility_Rev_01.xlsx XLSX spreadsheet
12_Attachment_8_CDRL_A028_Conceptual_Design.pdf PDF
12_Attachment_1F_Air_Force_Furnishings_Commodity_Council_Contractors_Rev_01.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_01.pdf PDF
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Rev_01.pdf PDF
12_Attachment_1N_Communications_Requirements.png PNG image
12_Attachment_8_CDRL_A071_Accident_Incident_Reports.pdf PDF
12_Attachment_4_FAR_52_212_2_Evaluation_Addendum_Temporary_Facility_Rev_01.pdf PDF
12_Attachment_8_CDRL_A112_Site_Preparation.pdf PDF
03_Vendor_Solicitation_Questions_and_Comments.xlsx XLSX spreadsheet
11_Record_of_Pre-Proposal_Conference_Sign-in.pdf PDF
12_FA821918R0010-0001.pdf PDF
12_Attachment_1J_01_57_20_Environmental_Protection.pdf PDF
12_Attachment_8_CDRL_A001_Design.pdf PDF
12_Attachment_7_Past_Performance_Questionnaire.docx DOCX document
12_Attachment_1I_01_35_26_Government_Safety_Requirements.pdf PDF
12_Attachment_1F_Air_Force_Furnishings_Commodity_Council_Contract_Requirements.pdf PDF
12_FA821918R7010.pdf PDF
12_Attachment_1L_Site_Map_Temp_Facility_and_Utilities.pdf PDF
12_Attachment_1H_01_00_00_General_Requirements.docx DOCX document
12_Attachment_1E_ICD_ICS_705.pdf PDF
12_Attachment_8_CDRL_A002_Site_Preparation.pdf PDF
12_Attachment_4_FAR_52_212-2_Evaluation_Addendum_Temporary_Facility_Revised.docx DOCX document
12_Attachment_2_Wage_Determination_UT180104.pdf PDF
12_Attachment_8_CDRL_A003_Accident_Mishap.pdf PDF
12_Attachment_1B_Standards_and_Specifications_Library.docx DOCX document
12_Attachment_5_Past_Performance_Information_Form.docx DOCX document
12_Attachment_1M_Buried_Antenna_Location.pdf PDF
12_Attachment_1D_TAB_K.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Final.docx DOCX document
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Revised.docx DOCX document
12_Attachment_1K_HAFB_Safety_Fire_Protection_Health_Specs.pdf PDF
03_Vendor_Questions_and_Comments_Updated_09_Feb_2018.pdf PDF
12_Attachment_1A_Workspace_Specifications_for_Temporary_Facility_Final.xlsx XLSX spreadsheet
12_Attachment_6_Subcontractor_Consent_Letter.docx DOCX document
12_Attachment_1C_Hill_AFB_Civil_Engineering_Requirements.docx DOCX document
12_Attachment_1G_City_Light_Power_Service_Connection_Manual_2017_R3.pdf PDF
Show all 48