12_Attachment_1L_Site_Map_Temp_Facility_and_Utilities.pdf

PDF 1 MB Posted

Attached to
Temporary Facility T-2728 Federal contract opportunity
Solicitation number
FA8219-18-R-0010
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 1L Revised

View the file

Other files for this federal contract opportunity

Other files attached to Temporary Facility T-2728, newest first.
File Type Posted
12_Attachment_1A_Workspace_Specs_for_Temp_Facility_Rev_03.xlsx XLSX spreadsheet
12_Attachment_4_FAR_52212_2_Evaluation_Addendum_Temp_Fac_Rev_03.docx DOCX document
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_03.docx DOCX document
FA8219-18-R-0010-0004.pdf PDF
12_Attachment_3_FAR52212-1_Instructions_Addendum_Temp_Fac_Rev_03.docx DOCX document
12_FA8219-18-R-0010-0002.pdf PDF
12_Attachment_1E_ICD_ICS_705_v1_4.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_02.pdf PDF
12_Attachment_1A_Workspace_Specifications_for_Temp_Facility_Rev_02.xlsx XLSX spreadsheet
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Rev_02.pdf PDF
12_Attachment_1A_Workspace_Specifications_Temporary_Facility_Rev_01.xlsx XLSX spreadsheet
12_Attachment_8_CDRL_A028_Conceptual_Design.pdf PDF
12_Attachment_1F_Air_Force_Furnishings_Commodity_Council_Contractors_Rev_01.pdf PDF
12_Attachment_8_CDRL_A112_Site_Preparation.pdf PDF
03_Vendor_Solicitation_Questions_and_Comments.xlsx XLSX spreadsheet
11_Record_of_Pre-Proposal_Conference_Sign-in.pdf PDF
12_FA821918R0010-0001.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_01.pdf PDF
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Rev_01.pdf PDF
12_Attachment_1N_Communications_Requirements.png PNG image
12_Attachment_8_CDRL_A071_Accident_Incident_Reports.pdf PDF
12_Attachment_4_FAR_52_212_2_Evaluation_Addendum_Temporary_Facility_Rev_01.pdf PDF
03_Vendor_Questions_and_Comments_Updated_09_Feb_2018.pdf PDF
12_Attachment_1A_Workspace_Specifications_for_Temporary_Facility_Final.xlsx XLSX spreadsheet
12_Attachment_6_Subcontractor_Consent_Letter.docx DOCX document
12_Attachment_1C_Hill_AFB_Civil_Engineering_Requirements.docx DOCX document
12_Attachment_1G_City_Light_Power_Service_Connection_Manual_2017_R3.pdf PDF
12_Attachment_1J_01_57_20_Environmental_Protection.pdf PDF
12_Attachment_8_CDRL_A001_Design.pdf PDF
12_Attachment_7_Past_Performance_Questionnaire.docx DOCX document
12_Attachment_1I_01_35_26_Government_Safety_Requirements.pdf PDF
12_Attachment_1F_Air_Force_Furnishings_Commodity_Council_Contract_Requirements.pdf PDF
12_FA821918R7010.pdf PDF
12_Attachment_1L_Site_Map_Temp_Facility_and_Utilities.pdf PDF
12_Attachment_1H_01_00_00_General_Requirements.docx DOCX document
12_Attachment_1E_ICD_ICS_705.pdf PDF
12_Attachment_8_CDRL_A002_Site_Preparation.pdf PDF
12_Attachment_4_FAR_52_212-2_Evaluation_Addendum_Temporary_Facility_Revised.docx DOCX document
12_Attachment_2_Wage_Determination_UT180104.pdf PDF
12_Attachment_8_CDRL_A003_Accident_Mishap.pdf PDF
12_Attachment_1B_Standards_and_Specifications_Library.docx DOCX document
12_Attachment_5_Past_Performance_Information_Form.docx DOCX document
12_Attachment_1M_Buried_Antenna_Location.pdf PDF
12_Attachment_1D_TAB_K.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Final.docx DOCX document
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Revised.docx DOCX document
12_Attachment_1K_HAFB_Safety_Fire_Protection_Health_Specs.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE:

MXD: Utilities

12/7/20173:11:36 PMMAP CONTROL #201705

Hill AFB Temporary Facility Siting (Utilities)

SHEET 1 OF 1

GROUND BASED STRATEGIC DETERRENT

HILL, AFB

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

I 0 60 12030

Feet

Legend

0 20 4010 Meters ver 1.0

1 in = 120 feet

Exterior Light

¨ Electrical Transformer Ñ Electrical Switch ! Power Pole

Overhead Power

Gas Line Sewer Line

! Sewer Mahole

") Storm Inlet & Storm Fitting

Storm Sewer Line

X Water Valve Water Line Contour Lines

THIS MAP IS FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED

This map is for reference and planning purposes only and is not meant to be used for engineering or survey work.

Information safeguarding is the responsibility of the individual/agency/company requesting and taking possession of this map.

Release or reproduction of this map, or any part of it, is prohibited except for official use only.

No public publication of this map by any means is authorized.

This map must be destroyed properly.

Direct any questions in regards to this policy to the BAE Systems Geospatial Office.

6008 Wardleigh Road Hill AFB (801) 896-2090.

Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).

EUL Boudary

Temporary Facility

Parking Lot

Temporary Facility

Site

Parking Lot access route from

Alabama St michael.hinton Line michael.hinton Line michael.hinton Line michael.hinton Line michael.hinton Stamp michael.hinton Sticky Note Unmarked set by michael.hinton michael.hinton Line michael.hinton Line michael.hinton Line michael.hinton Line goodlick Callout THIS WATER LINE IS AN ABANDONED IRRIGATION LINE AND WOULD NOT WORK TO SERVICE THE NEW FACILITY.

goodlick Callout THIS SEWER LINE STUB DOES NOT EXIST. THE SANITARY SEWER CONNECTION NEEDS TO GO BACK TO THE MANHOLE SHOWN.

goodlick Callout THE NEAREST WATER LINE IS LOCATED JUST EAST OF THIS ROADWAY. IT IS A 14-INCH DIAMETER PVC WATER LINE.

!H!H

!H

!H

!H

! (! ( !(!(G!.

!H

!H $1

$1

8"

6"

8" 2"

6"

1"

6"

6"

6"

6"

6"

11538

8"

6"

8"

JO

NQ

UI

L

WA

RD

LE

IG

H

ALABAMA

IN

DI

GO

CONNECTICUT

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

MMXG TEMP

OFFICE

3/6/2018 p

7834 North Dr Bldg 1909

Hill AFB, Utah 84056

Do cu me nt

Pa th:

S :\M

SG

\G

IS

\H ill_

AF

B\ Pr oje cts

\20

M

MX

G Te mp O ffic e\M

MX

G

Te mp

.m xd

This document is intended to be used for general information purposes only. American Water makes no representations or warranties of any kind, express or implied, related to the accuracy, completeness, relevance, suitability, or reliability of any information contained herein. Any person or entity that relies on this information does so solely at his/her/its own risk

Legend

± Proposed Cap $1 Proposed CO !H Proposed MH

Proposed Sewer Main !H Existing SSMH

Existing SS Main G!. Proposed Hydrant !( Proposed Valve

Proposed Water Line Existing W Main

NOT TO SCALE

PROPOSED

FH

Proposed:

2" Water Service 6" Fire Service

PROPOSED

BUILDING

75' of 6" SDR-35 PVC @ 2% Slope

125' of 8" SDR-35 PVC @ 1% Slope

400' of 8" SDR-35 PVC @ 1% Slope

Stub Out 8" SDR-35 PVC For Futrue Extension

Approx 830' of C-900 PVC