03_Vendor_Questions_and_Comments_Updated_09_Feb_2018.pdf

PDF 72 KB Posted

Attached to
Temporary Facility T-2728 Federal contract opportunity
Solicitation number
FA8219-18-R-0010
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Vendor Questions and Comments

View the file

Other files for this federal contract opportunity

Other files attached to Temporary Facility T-2728, newest first.
File Type Posted
12_Attachment_1A_Workspace_Specs_for_Temp_Facility_Rev_03.xlsx XLSX spreadsheet
12_Attachment_4_FAR_52212_2_Evaluation_Addendum_Temp_Fac_Rev_03.docx DOCX document
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_03.docx DOCX document
FA8219-18-R-0010-0004.pdf PDF
12_Attachment_3_FAR52212-1_Instructions_Addendum_Temp_Fac_Rev_03.docx DOCX document
12_Attachment_1L_Site_Map_Temp_Facility_and_Utilities.pdf PDF
12_Attachment_1A_Workspace_Specifications_for_Temp_Facility_Rev_02.xlsx XLSX spreadsheet
12_FA8219-18-R-0010-0002.pdf PDF
12_Attachment_1E_ICD_ICS_705_v1_4.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_02.pdf PDF
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Rev_02.pdf PDF
12_Attachment_1A_Workspace_Specifications_Temporary_Facility_Rev_01.xlsx XLSX spreadsheet
12_Attachment_8_CDRL_A028_Conceptual_Design.pdf PDF
12_Attachment_1F_Air_Force_Furnishings_Commodity_Council_Contractors_Rev_01.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Rev_01.pdf PDF
12_Attachment_8_CDRL_A112_Site_Preparation.pdf PDF
03_Vendor_Solicitation_Questions_and_Comments.xlsx XLSX spreadsheet
11_Record_of_Pre-Proposal_Conference_Sign-in.pdf PDF
12_FA821918R0010-0001.pdf PDF
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Rev_01.pdf PDF
12_Attachment_1N_Communications_Requirements.png PNG image
12_Attachment_8_CDRL_A071_Accident_Incident_Reports.pdf PDF
12_Attachment_4_FAR_52_212_2_Evaluation_Addendum_Temporary_Facility_Rev_01.pdf PDF
12_Attachment_1J_01_57_20_Environmental_Protection.pdf PDF
12_Attachment_8_CDRL_A001_Design.pdf PDF
12_Attachment_7_Past_Performance_Questionnaire.docx DOCX document
12_Attachment_1I_01_35_26_Government_Safety_Requirements.pdf PDF
12_Attachment_1F_Air_Force_Furnishings_Commodity_Council_Contract_Requirements.pdf PDF
12_FA821918R7010.pdf PDF
12_Attachment_1A_Workspace_Specifications_for_Temporary_Facility_Final.xlsx XLSX spreadsheet
12_Attachment_6_Subcontractor_Consent_Letter.docx DOCX document
12_Attachment_1C_Hill_AFB_Civil_Engineering_Requirements.docx DOCX document
12_Attachment_1G_City_Light_Power_Service_Connection_Manual_2017_R3.pdf PDF
12_Attachment_1L_Site_Map_Temp_Facility_and_Utilities.pdf PDF
12_Attachment_1H_01_00_00_General_Requirements.docx DOCX document
12_Attachment_1E_ICD_ICS_705.pdf PDF
12_Attachment_8_CDRL_A002_Site_Preparation.pdf PDF
12_Attachment_4_FAR_52_212-2_Evaluation_Addendum_Temporary_Facility_Revised.docx DOCX document
12_Attachment_2_Wage_Determination_UT180104.pdf PDF
12_Attachment_8_CDRL_A003_Accident_Mishap.pdf PDF
12_Attachment_1B_Standards_and_Specifications_Library.docx DOCX document
12_Attachment_5_Past_Performance_Information_Form.docx DOCX document
12_Attachment_1M_Buried_Antenna_Location.pdf PDF
12_Attachment_1D_TAB_K.pdf PDF
12_Attachment_1_Statement_of_Work_Temporary_Facility_Final.docx DOCX document
12_Attachment_3_FAR_52_212-1_Instructions_to_Offerors_Addendum_Temporary_Facility_Revised.docx DOCX document
12_Attachment_1K_HAFB_Safety_Fire_Protection_Health_Specs.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor

Comment/

Question

Number Comment/Question Program Team Responses

One of the requirements was to have 100 people accommodated in the secured area. Could we consider splitting that up to allow the configuration to sit better on the site?

Reference Attachment 1A, the Office Space Area

#1 is to be sufficient for 100 personnel.

Understanding that we would need to meet frost line requirements, could an upgrade for the foundation be required to provide flexibility on blocking location on the building?

Reference Attachment 1C (para. 3.7.3), the frost line requirement will dictate the footing/foundation requirement.

Please provide specifications for the interior and exterior finishes.

Reference Attachment 1C, para. 4.1.2 for exterior finishes. Interior finishes shall be painted, pre‐ laminated, or coated wallboard, carpeted flooring, and hung‐ceiling (Ref SOW, para 3.2.6.)

with final color to be determined after contract award.

Is skirting required and if so, do you have a requirement for the material?

A breeze block or decorative‐face block shall be used as skirting around the exterior footings of the building (Ref. SOW, para. 3.2.5)

5 What is the classification of this building?

Reference Attachment 1A, construct to ICD/ICS

Will a TEMPEST rating be required? If so to what level is the equipment distance, set back etc.? No TEMPEST rating is required.

Have you been in contact with DIA yet to verify if they have any additional tempest requirements? No TEMPEST rating is required.

Does the building require any additional physical protection such as FEBR (Forced Entry/Ballistic Resistant)? No.

Please confirm the STC rating requirement for the building and rooms?

This requirement is defined in the Statement of

Work, para. 3.2.3, as Sound Group 4 ‐ STC 50 or better.

Has the government established a budget range for the project? If so, please provide.

The Government has a cost estimate, but it will not be provided with the RFP.

11 Does this job require Union labor? Prevailing wage?

This job does not require organized labor.

Prevailing wage rates for the Incidental construction and preparation for Temporary

Facility 2728 site and utilities, CLIN 0002, must be paid in accordance with the Construction Wage

Rate Requirements Statute, formerly known as the Davis Bacon Act.

Is it anticipated that Radio Frequency Shielding will be required? No.

Does Hill AFB have a SCIF expert and or resource person on base?

A successful offeror must be familiar with

Intelligence Community Directive (ICD) 705 –

Sensitive Compartmented Information Facilities and Intelligence Community Standard (ICS) 705‐1

– Physical and Technical Standards for Sensitive

Compartmented Information Facilities.

Government security personnel will participate in periodic reviews of the Contractor's work on an infrequent and unannounced basis, and at as part of the accreditation processes at the conclusion of the Contract. Government personnel will not serve as advisors to the

Contractor as part of the performance of this effort.

What type wall constructions are you looking for to comply with the ICD/ICS 705, Wall type A, B, or C?

Reference Statement of Work, para 3.2.3., Wall

Type A

16 Does this project require to have emergency power?

Reference Statement of Work para 3.2.9., only the alarm system will require emergency power.

Is the entire building to be a SCIF or is there a small section of the building to meet the SCIF requirements?

Construction standards for each room are defined in the Attachment 1A.

The instructions to offerors ask for a 60% design be included with the proposal, typically floor plans and elevations are included with modular building proposals. Please clarify what the intent for the 60% design is and what will be expected with the solicitation response. (I.E. MEP, Structural, etc.)

Reference Attachment 12 to the solicitation ‐ FAR

52.212‐1, Instructions to Offerors Temporary

Facility 22 Jan 2018.

The Offeror shall provide a 60% interim design solution, which represents a complete package with all design disciplines for the entire project, as defined in UFGS Section 01 33 16.00 10. The interim design shall demonstrate the offeror’s ability to identify, understand, and integrate temporary facility manufacturing, security, and safety standards in accordance with the following attachments:

a) Attachment 1B ‐ Unitified Facilities Criteria –

Whole Building Design Guide

b) Attachment 1C ‐ Hill AFB ‐ Base Facility Design

Standards

c) Attachment 1E ‐ Intelligence Community

Directive / Intelligence Community Standards

(ICD/ICS) 705.

19 Recommend Specify Ceiling Height of 8’‐Standard Industry

Concur. Attachment 1A updated to state ceiling height shall not be less than 8' floor to ceiling.

Attachment A ‐ Hinged Floor Crawl Space‐Keep in mind there is only 30” from bottom of finished floor to the ground. This is understood by the Government.

Attachment A ‐ Recommend specify furniture requirements, i.e.desk size, type of chair, etc. I did see that you are looking for

7’x7’ cubicles?

The desk size and style for employee cubes shall be monolithic panel, 6'x6' staff cube (efficiency), w/ power to all panels. Supervisors office shall be a stackable panel, 8'x10' manager cube, with power on all panels, and with office height panels (76"‐81") with door. Each supervisors office shall be furnished with freestanding "U" shaped desk, with 24" wide storage tower with shelves. All chairs shall be black, swivel/tilt Mesh

Mid‐Back Task Chair, with Fixed Cantilevered

Arms. (Ref. SOW, para. 3.2.6)

22 Who is the Hill Air Force Base Access Control Provider?

This requirement is defined in Attachment 1C for

1) Intrusion Detection System (IDS) ‐ para. 14.12.

and 2) Access Control System (ACS) ‐ para.

14.13.

23 Attachment D ‐ Specify who will install sensors

If you are talking about the IDS…the contractor installs the sensors. (Ref Attachment 1C, para

4.12 and 4.13.)

Attachment H ‐ Pg. 14‐1.15 Storage‐In our Industry Day meeting there was a concern on where to stage the buildings during installation. It appeared that the area that was designated was a dirt area that has the potential during a rainy season to become muddy. If possible, please specify a staging area that would be better suited.

Hill is unable to provide any property for staging or storage, outside of what is available on the

Temp Facility site and parking lot.

25 Does this entire structure needs to be built as a "SCIF"?

Room construction standards are defined in

Attachment 1A.

Does the Air Force indent to put dimensions on the sample drawing that was released a few months back?

No. The Government does not intend to provide dimensions. Any sample drawings previously provided are for informational purposes only.

Please ensure the space is allocated according to the specifications provided.

Are you able to give me the overall footprint of the modular of the property? Reference Attachments 1L and 1M.

File details come from the government source that posted it.