Sacramento River East Levee (SREL) Contract 2
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123821B0001
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Sacramento CA 95814 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Sacramento is seeking bids for a firm-fixed price construction contract for the Sacramento River East Levee Contract 2 project. The scope of work involves constructing approximately 1.8 miles of various types of seepage cutoff walls along segments of the levee, relocating and removing utilities, modifying relief wells, removing and replacing a sump, and handling contaminated soils. All work must be completed by December 2021, with levee reconstruction finished by September 2021. Bids are due by November 30, 2020. Contractors must be on the Pre-Qualified Sources List. The evaluation criteria will be based on price.
There is no set-aside designation. The primary NAICS code is 237990 for other heavy and civil engineering construction with a size standard of $39.5 million. The estimated value of construction is between $25-100 million to perform work in Sacramento, California. The place of performance will be along discontinuous reaches of the Sacramento River East Levee within Miller Park, Little Pocket, and Big Pocket areas of Sacramento. Cutoff wall construction methods will include open trench soil-bentonite, slag cement-cement-bentonite, deep mix method, and jet grout walls.
Notice text
7 versions
Update #7 · Latest ·
Please note, all bids are due at 10am, however, the WebEx will not begin until 10:30, to ensure all bids are downloaded from DOD SAFE timely. All bids must be uploaded and the email sent from DOD SAFE to the Contracti Specialist by 10am, no exceptions will be made for technical difficulites.
****Amendment 0004 posted a revised pricing schedule, revised drawing and 2 revised spec sections.****
****Amendment 3 extends the bid opening date, and posts specification and drawing revisions. Also includes additional specification attachments.*****
****Amendment 2 extends bid opening date and posts several revisions.****
****Site Visit Sign-In Sheet posted 17 Nov 2020****
**** Site Visit Slides posted 10 Nov 2020 ****
Please see attachments and bring a printed copy to the site visit.
****Amendment 1 changes the site visit date and time****
The Government anticipates issuing an Invitation for Bid with the intent of awarding a Firm-Fixed Price construction contract for Sacramento River East Levee, Contract 2
Project Description:
The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. Product Service Code is Y1LC - Construction of Tunnels and Subsurface Structures.
The solicitation will proceed unrestricted and must use contractors from the Pre-Qualified Sources List (PSL) for the included features of work. The solicitation is estimated to be issued on or about 30 October 2020 with bids due tentatively on 30 November 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Update #6 ·
****Amendment 3 extends the bid opening date, and posts specification and drawing revisions. Also includes additional specification attachments.*****
****Amendment 2 extends bid opening date and posts several revisions.****
****Site Visit Sign-In Sheet posted 17 Nov 2020****
**** Site Visit Slides posted 10 Nov 2020 ****
Please see attachments and bring a printed copy to the site visit.
****Amendment 1 changes the site visit date and time****
The Government anticipates issuing an Invitation for Bid with the intent of awarding a Firm-Fixed Price construction contract for Sacramento River East Levee, Contract 2
Project Description:
The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. Product Service Code is Y1LC - Construction of Tunnels and Subsurface Structures.
The solicitation will proceed unrestricted and must use contractors from the Pre-Qualified Sources List (PSL) for the included features of work. The solicitation is estimated to be issued on or about 30 October 2020 with bids due tentatively on 30 November 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Update #5 ·
****Amendment 2 extends bid opening date and posts several revisions.****
****Site Visit Sign-In Sheet posted 17 Nov 2020****
**** Site Visit Slides posted 10 Nov 2020 ****
Please see attachments and bring a printed copy to the site visit.
****Amendment 1 changes the site visit date and time****
The Government anticipates issuing an Invitation for Bid with the intent of awarding a Firm-Fixed Price construction contract for Sacramento River East Levee, Contract 2
Project Description:
The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. Product Service Code is Y1LC - Construction of Tunnels and Subsurface Structures.
The solicitation will proceed unrestricted and must use contractors from the Pre-Qualified Sources List (PSL) for the included features of work. The solicitation is estimated to be issued on or about 30 October 2020 with bids due tentatively on 30 November 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Update #4 ·
****Site Visit Sign-In Sheet possted 17 Nov 2020****
**** Site Visit Slides posted 10 Nov 2020 ****
Please see attachments and bring a printed copy to the site visit.
****Amendment 1 changes the site visit date and time****
The Government anticipates issuing an Invitation for Bid with the intent of awarding a Firm-Fixed Price construction contract for Sacramento River East Levee, Contract 2
Project Description:
The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. Product Service Code is Y1LC - Construction of Tunnels and Subsurface Structures.
The solicitation will proceed unrestricted and must use contractors from the Pre-Qualified Sources List (PSL) for the included features of work. The solicitation is estimated to be issued on or about 30 October 2020 with bids due tentatively on 30 November 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Update #3 ·
**** ConOps Posting update on 10 Nov 2020 adds Site Visit Slides ***
Please see attachments and bring a printed copy to the site visit.
****Amendment 1 changes the site visit date and time****
The Government anticipates issuing an Invitation for Bid with the intent of awarding a Firm-Fixed Price construction contract for Sacramento River East Levee, Contract 2
Project Description:
The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. Product Service Code is Y1LC - Construction of Tunnels and Subsurface Structures.
The solicitation will proceed unrestricted and must use contractors from the Pre-Qualified Sources List (PSL) for the included features of work. The solicitation is estimated to be issued on or about 30 October 2020 with bids due tentatively on 30 November 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Update #2 ·
****Amendment 1 changes the site visit date and time****
The Government anticipates issuing an Invitation for Bid with the intent of awarding a Firm-Fixed Price construction contract for Sacramento River East Levee, Contract 2
Project Description:
The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. Product Service Code is Y1LC - Construction of Tunnels and Subsurface Structures.
The solicitation will proceed unrestricted and must use contractors from the Pre-Qualified Sources List (PSL) for the included features of work. The solicitation is estimated to be issued on or about 30 October 2020 with bids due tentatively on 30 November 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Update #1 ·
The Government anticipates issuing an Invitation for Bid with the intent of awarding a Firm-Fixed Price construction contract for Sacramento River East Levee, Contract 2
Project Description:
The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. Product Service Code is Y1LC - Construction of Tunnels and Subsurface Structures.
The solicitation will proceed unrestricted and must use contractors from the Pre-Qualified Sources List (PSL) for the included features of work. The solicitation is estimated to be issued on or about 30 October 2020 with bids due tentatively on 30 November 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Files
Show all 34
Notice history
| Notice | Type | Posted |
|---|---|---|
| Sacramento River East Levee (SREL) Contract 2 | Award Notice | |
| This notice | Solicitation | |
| Sacramento River East Levee (SREL) Contract 2 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA | ENDIST Sacramento | No set-aside | |
| $465M SPK small business MATOC for DBB/DB construction | ENDIST Sacramento | Total Small Business | |
| Camp wooten/starbuck levee rehab | ENDIST Walla Walla | No set-aside | |
| CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R | ENDIST Vicksburg | Total Small Business |