This document provides an amendment to a solicitation and details of the related federal contract opportunity. The amendment modifies the site visit date and time for the solicitation for the Sacramento River East Levee Contract 2 project to November 12, 2020 at 1pm. The project scope involves construction of approximately 1.8 miles of varying types of seepage cutoff walls along levee reaches and includes utility relocations, modifications to relief wells, and contaminated soil remediation. The opportunity is a firm-fixed-price construction contract with the U.S. Army Corps of Engineers estimated between $25-100 million. The solicitation will be issued on October 30, 2020 with bids due November 30, 2020. All work must be completed by December 2021 with levee reconstruction by September 2021.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0004 - Pricing Schedule.pdf PDF
Amendment 0004 - Summary of Changes.pdf PDF
Amendment 0004 - Specification Revision.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 - Revised Drawing.pdf PDF
Amendment 0003 - Specification ATTACHMENTS.pdf PDF
Amendment 0003 - Specifications.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Summary.pdf PDF
Amendment 0003 - Drawings.pdf PDF
Amendment 0002 - Revised Drawings.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 - Specifications ATTACHMENTS.pdf PDF
Amendment 0002 - Revised 2342 Specifications.pdf PDF
Amendment 0002 - Revised Pricing_Schedule.pdf PDF
Amendment 0002 - Summary.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
ARCF SREL C2 Site Visit 10NOV20.pdf PDF
Solicitation W9123821B0001.pdf PDF
Site Visit Map.pdf PDF
Attachment 3 - Drawings.10.29.2020.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 5 of 5.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 1 of 5.pdf PDF
Attachment 1 - Specifications_10.23.2020.pdf PDF
Attachment 7 - Pre-Award Survey.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 2 of 5.pdf PDF
Attachment 6 - Past Performance Questionnaire.pdf PDF
Attachment 5 - Pricing Schedule.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 4 of 5.pdf PDF
Attachment 4 - Wage Determination.CA20200007.10.9.2020.pdf PDF
Solicitation W9123821B0001.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 3 of 5.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to change the site visit date and time and make a grammatical edit to clause 52.211-12.

No other changes are made or implied.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Nov-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123821B0001

X 9B. DATED (SEE ITEM 11)

30-Oct-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Nov-2020

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123821B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- November 5, 2020 @ 9am November 12, 2020 @ 1pm

(c) Participants will meet at-- Miller Park, 2701 Marina View Dr. Sacramento, CA 95818

(End of provision)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $5,178 for each calendar day of delay until the work is completed or accepted.

In the event the Contractor fails to complete the entire work prior to 30 March 2022, the Contractor shall pay additional liquidated damages to the Government in the amount of $50,000 to compensate the Government’s costs to enter into negotiations with the Sacramento Metropolitan Air Quality Management District (SMAQMD) to amend the existing air quality conformity agreement as necessary to cover the extended period of project construction.

In addition, if the revised agreement requires the Government to pay additional air quality mitigation fees, the contractor shall pay additional damages to the Government in the amount of actual costs incurred by the Government to comply with the revised SMAQMD agreement. These costs are currently estimated to be approximately $30,000 for each additional ton of mitigation. The Government shall provide the Contractor with a full accounting of said costs, in if incurred.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.