Amendment 0002 - Revised Pricing_Schedule.pdf
PDF 233 KB Posted
- Attached to
- Sacramento River East Levee (SREL) Contract 2
- Solicitation number
- W9123821B0001
About this file
This document contains a pricing schedule amendment and related federal contract opportunity notice for construction services. The pricing schedule amendment revises estimated quantities and pricing for line items to construct approximately 1.8 miles of various seepage cutoff walls along the Sacramento River East Levee. Services include installing soil-bentonite, slag cement-cement-bentonite, deep mix method, and jet grout cutoff walls. Additional services include utility relocation, relief well modification, removal and replacement of a city sump, and handling contaminated soils. The federal contract opportunity is solicitation number W9123821B0001 for the Sacramento River East Levee Contract 2 project. Construction must be completed by December 2021 to install cutoff walls and reconstruct the levee by September 2021. The solicitation is estimated to issue on October 30, 2020 with bids due November 30, 2020 on beta.sam.gov. The project value is estimated between $25-100 million.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule - American River Common Features 2016 - Sacramento River East Levee, Contract 2 CLIN 0001 - CUTOFF: Jet Grout Cutoff Walls
Stations: 1093+50 to 1098+50 Revised November 25, 2020
Contract Line
Item No.
Item Description Estimated
Quantity Unit Unit Price Total Price
0001.01 Mobilization and Demobilization 1 JOB $ $
0001.02 Traffic Control 1 JOB $ $
0001.03 Storm Water Pollution Control 1 JOB $ $
0001.04 Vibration Monitoring 1 JOB $ $
0001.05 Jet Grout Pre-Production Section 1 JOB $ $
0001.06 Remove, Store, and Reinstall CLF Gate 1 EA $ $
0001.07 Class 2 Aggregate Base* 354 TN $ $
0001.08 Asphalt Concrete Paving* 111 TN $ $
0001.09 Thermoplastic Traffic Stripe* 500 LF $ $
0001.10 Modify Relief Wells 1 JOB $ $
0001.11 Erosion Control Seeding* 0.3 AC $ $
0001.12 Clearing and Grubbing* 0.4 AC $ $
0001.13 Remove and Dispose - Asphalt Concrete* 74 TN $ $
0001.14 Remove and Dispose - Aggregate Base* 137 TN $ $
0001.15 Jet Grout Cap Excavation and Disposal (Offsite)* 421 CY $ $
0001.16 Utility Inspect and Restore 1 EA $ $
0001.17 Abandon Utility 1 EA $ $
0001.18 Jet Grout Wall at Existing Vault (STA 1096+40 to
1096+70) 1 JOB $ $
0001.19 Jet Grout Cuttings Management 1 JOB $ $
0001.20 Jet Grout Wall (Except STA 1096+40 to
1096+70)* 52,528 SF $ $
0001.21 Jet Grout Cuttings Disposal* 31,634 TN $ $
0001.22 Jet Grout Cap - (Soil Type 1 or CLSM)* 421 CY $ $
TOTAL $
NOTE: AC is acre, CY is cubic yard, EA is each, LF is linear foot, SF is square Foot, and TN is ton.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
CLIN 0002 - CUTOFF: Conventional Cutoff Walls
Stations: 1300+30 to 1310+00 and 1336+00 to 1407+50
Line Item
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
0002.01 Mobilization and Demobilization 1 JOB $ $
0002.02 Traffic Control 1 JOB $ $
0002.03 Storm Water Pollution Control 1 JOB $ $
0002.04 Vibration Monitoring 1 JOB $ $
0002.05 Remove, Store, and Reinstall Gate 2 EA $ $
0002.06 Restore Ellsworth C. Zacharias Park. 1 JOB $ $
0002.07 Class 2 Aggregate Base* 3,990 TN $ $
0002.08 Class 3 Aggregate Surface Course* 6,776 TN $ $
0002.09 Asphalt Concrete Paving* 1,251 TN $ $
0002.10 Thermoplastic Traffic Stripe* 5,628 LF $ $
0002.11 Erosion Control Seeding* 14 AC $ $
0002.12 Maintenance of Zacharias Park to April 15, 2022 1 JOB $ $
0002.13 Clearing and Grubbing* 14 AC $ $
0002.14 Topsoil Stripping* 8,254 CY $ $
0002.15 Remove and Dispose - Asphalt Concrete* 1,041 TN $ $
0002.16 Remove and Dispose - Aggregate Base* 1,542 TN $ $
0002.17 Remove Aggregate Surfacing* 21,982 SY $ $
0002.18 Abandon Existing Piezometer 7 EA $ $
0002.19 Remove and Dispose Utility - Up to 4' Depth 16 EA $ $
0002.20 Remove and Dispose Utility - Greater than 4'
Depth 1 EA $ $
0002.21 Demolition at Sump 63 (STA 1360+30) 1 JOB $ $
0002.22 Levee Excavation (Levee Degrade and Cutoff
Trench)* 53,033 CY $ $
0002.23 Controlled Levee Degrade 2,500 LF $ $
CLIN 0002 - CUTOFF: Conventional Cutoff Walls
Stations: 1300+30 to 1310+00 and 1336+00 to 1407+50
0002.24 SB Cutoff Wall* 463,370 SF $ $
0002.25 DMM or SB Cutoff Wall* 41,850 SF $ $
0002.26 SCCB Cutoff Wall* 43,015 SF $ $
0002.27 Levee Embankment Fill (Soil Type 1)* 80,808 CY $ $
0002.28 Sump 63 (STA 1360+30) 1 JOB $ $
0002.29 Archaeological Testing 4 EA $ $
TOTAL $
BASE CONTRACT TOTAL $
NOTE: AC is acre, CY is cubic yard, EA is each, LF is linear foot, SF is square Foot, SY is square yard, and TN is ton.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
CLIN 0003 – Controlled Levee Degrade
Stations: 1345+00 to 1408+00
Line Item
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
0003.01 Controlled Levee Degrade 2,500 LF $ $
TOTAL $
BASE CONTRACT TOTAL $
NOTE: AC is acre, CY is cubic yard, EA is each, LF is linear foot, SF is square Foot, SY is square yard, and TN is ton.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
OPTION 1
OPTIONAL CLIN 0001 - CUTOFF: Jet Grout Cutoff Wall Stations: 1105+00 to 1116+15
Line
Item No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1001.01 Mobilization and Demobilization 1 JOB $ $
1001.02 Traffic Control 1 JOB $ $
1001.03 Storm Water Pollution Control 1 JOB $ $
1001.04 Vibration Monitoring 1 JOB $ $
1001.05 Remove Pipe Gate 1 EA $ $
1001.06 Furnish and Install Pipe Gate 1 EA $ $
1001.07 Remove and Replace Curb and Gutter* 20 LF $ $
1001.08 Class 2 Aggregate Base* 525 TN $ $
1001.09 Asphalt Concrete Paving* 165 TN $ $
1001.10 Thermoplastic Traffic Stripe* 740 LF $ $
1001.11 Erosion Control Seeding* 1 AC $ $
1001.12 Clearing and Grubbing* 1.7 AC $ $
1001.13 Remove and Dispose - Asphalt Concrete 110 TN $ $
1001.14 Remove and Dispose - Aggregate Base 203 TN $ $
1001.15 Jet Grout Cap Excavation and Disposal (Offsite) 779 CY $ $
1001.16 Utility Inspect and Restore 4 EA $ $
1001.17 Abandon Utility 4 EA $ $
1001.18 Jet Grout Cuttings Management 1 JOB $ $
1001.19 Jet Grout Wall* 47,750 SF $ $
1001.20 Jet Grout Cuttings Disposal* 31,634 TN $ $
1001.21 Jet Grout Cuttings Hazardous Disposal (STA
1110+00 to 1116+15)* 15,960 TN $ $
1001.22 Jet Grout Cap - (Soil Type 1 or CLSM)* 780 CY $ $
TOTAL $
NOTE: AC is acre, CY is cubic yard, EA is each, LF is linear foot, SF is square foot, and TN is ton.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
OPTION 2
OPTIONAL CLIN 1002: Abandon Utility Pipes Stations: 1093+50 to 1095+50
Line
Item No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1002.01 Mobilization and Demobilization 1 JOB $ $
1002.02 Traffic Control 1 JOB $ $
1002.03 Storm Water Pollution Control 1 JOB $ $
1002.04 Vibration Monitoring 1 JOB $ $
1002.05 Utility Inspect and Restore 12 EA $ $
1002.06 Abandon Utility 12 EA $ $
TOTAL $
NOTE: EA is each.
OPTION 3
OPTIONAL CLIN 1003: Abandon Utility Pipes and Containment Basin Re-Grading (Chevron) Stations: 1105+00 to 1113+00
Line
Item No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1003.01 Mobilization and Demobilization 1 JOB $ $
1003.02 Traffic Control 1 JOB $ $
1003.03 Storm Water Pollution Control 1 JOB $ $
1003.04 Vibration Monitoring 1 JOB $ $
1003.05 Utility Inspect and Restore 8 EA $ $
1003.06 Abandon Utility 8 EA $ $
TOTAL $
NOTE: EA is each.
OPTION 5
OPTIONAL CLIN 1004: Clearing and Grubbing Stations: 1388+25 to 1389+00
Line
Item No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1004.01 Mobilization and Demobilization 1 JOB $ $
1004.02 Traffic Control 1 JOB $ $
1004.03 Storm Water Pollution Control 1 JOB $ $
1004.04 Vibration Monitoring 1 JOB $ $
1004.05 Clearing and Grubbing* 0.013 AC $ $
1004.06 Erosion Control Seeding* 0.013 AC $ $
TOTAL $
GRAND TOTAL, including ALL OPTIONS $
NOTE: AC is acre.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
File details come from the government source that posted it. Updated .