Bid Abstract.pdf

PDF 71 KB Posted

Attached to
Sacramento River East Levee (SREL) Contract 2
Solicitation number
W9123821B0001
Issued by

About this file

This document contains details on a federal contract opportunity for construction services. The U.S. Army Corps of Engineers, Engineering District Sacramento is soliciting bids for the Sacramento River East Levee Contract 2 project, with a construction value estimated between $25-100 million. The scope of work includes building approximately 1.8 miles of various seepage cutoff walls along the levee using techniques including open trench soil-bentonite, slag cement-cement-bentonite, deep mix method and jet grout cutoff walls. Additional requirements include relocating utilities, working near a railroad, modifying relief wells, replacing a city sump, and removing and disposing of contaminated soils. Bids are due by November 30, 2020 with work expected to be completed by December 2021. Contractors must be on the Pre-Qualified Sources List for the included features of work.

View the file

Other files

File Type Posted
Amendment 0004 - Pricing Schedule.pdf PDF
Amendment 0004 - Summary of Changes.pdf PDF
Amendment 0004 - Specification Revision.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 - Revised Drawing.pdf PDF
Amendment 0003 - Specification ATTACHMENTS.pdf PDF
Amendment 0003 - Specifications.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Summary.pdf PDF
Amendment 0003 - Drawings.pdf PDF
Amendment 0002 - Revised Drawings.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 - Specifications ATTACHMENTS.pdf PDF
Amendment 0002 - Revised 2342 Specifications.pdf PDF
Amendment 0002 - Revised Pricing_Schedule.pdf PDF
Amendment 0002 - Summary.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
ARCF SREL C2 Site Visit 10NOV20.pdf PDF
Solicitation W9123821B0001.pdf PDF
Amendment 1.pdf PDF
Site Visit Map.pdf PDF
Attachment 3 - Drawings.10.29.2020.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 5 of 5.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 1 of 5.pdf PDF
Attachment 1 - Specifications_10.23.2020.pdf PDF
Attachment 7 - Pre-Award Survey.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 2 of 5.pdf PDF
Attachment 6 - Past Performance Questionnaire.pdf PDF
Attachment 5 - Pricing Schedule.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 4 of 5.pdf PDF
Attachment 4 - Wage Determination.CA20200007.10.9.2020.pdf PDF
Solicitation W9123821B0001.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 3 of 5.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 $16,288,402.23 CLIN 0001 $10,998,440.00 CLIN 0001 $18,532,748.00

CLIN 0002 $22,853,008.58 CLIN 0002 $12,457,204.00 CLIN 0002 $39,802,462.00

CLIN 0003 $1,250,000.00 CLIN 0003 $412,500.00 CLIN 0003 $4,953,607.00

Option CLIN 1001 $7,141,541.50 Option CLIN 1001 $5,686,257.00 Option CLIN 1001 $16,651,538.00 Option CLIN 1002 $106,350.00 Option CLIN 1002 $197,010.00 Option CLIN 1002 $872,713.00 Option CLIN 1003 $79,610.00 Option CLIN 1003 $135,190.00 Option CLIN 1003 $749,825.00 Option CLIN 1004 $11,590.93 Option CLIN 1004 $13,198.00 Option CLIN 1004 $20,423.00

GRAND TOTAL $47,730,503.24 GRAND TOTAL $29,899,799.00 GRAND TOTAL $81,583,316.00

CLIN 0001 $13,584,365.00 CLIN 0001 $17,680,475.00

CLIN 0002 $15,659,346.50 CLIN 0002 $27,923,055.00

CLIN 0003 $150,000.00 CLIN 0003 $1,790,000.00

Option CLIN 1001 $6,620,019.00 Option CLIN 1001 $9,385,537.00 Option CLIN 1002 $158,500.00 Option CLIN 1002 $597,000.00 Option CLIN 1003 $105,500.00 Option CLIN 1003 $449,000.00 Option CLIN 1004 $8,351.00 Option CLIN 1004 $91,715.00

GRAND TOTAL $36,286,081.50 GRAND TOTAL $57,916,782.00

Malcolm Nordic

Odin Ahtna-Great Lakes JV

IGE

Abstract

File details come from the government source that posted it. Updated .