Amendment 0003 - Summary.pdf
PDF 78 KB Posted
- Attached to
- Sacramento River East Levee (SREL) Contract 2
- Solicitation number
- W9123821B0001
About this file
This document provides details on Amendment 0003 to the solicitation for the Sacramento River East Levee Contract 2 project. The amendment revises several specification sections and drawings related to requirements for approximately 1.8 miles of seepage cutoff walls, relocation of utilities, modification of relief wells, replacement of a sump, and disposal of contaminated soils. Cutoff wall construction methods include open trench soil-bentonite and slag cement-cement-bentonite cutoff walls, deep mix method cutoff walls, and jet grout cutoff walls. Night work is permitted for jet grout cutoff walls. The estimated contract value is between $25-100 million. The solicitation is scheduled to be issued on October 30, 2020 with bids due November 30, 2020. The awarded firm-fixed price construction contract must be completed by December 2021 with levee reconstruction finished by September 30, 2021.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. W91238-21-B-0001 Spec No. 2342
1 of 1 AMD-03
AMERICAN RIVER COMMON FEATURES 2016
SACRAMENTO RIVER EAST LEVEE CONTRACT 2
SACRAMENTO, CALIFORNIA
AMENDMENT 03 - SUMMARY:
A) SPECIFICATION 2342
1) Revised Specification Sections 01 00 00, 01 11 00, 01 22 00, 02 41 00, 31 00 00, 31 56 13.32, 31 83 13, and 35 41 17.
2) Revised Specification Attachment:
a. Environmental Field Exploration Summary Report, Rev. 1.
B) DRAWINGS
1) Revised Drawings: G-030, G-080, G-081, G-104, G-105, G-106, G-120, C-003, C-004, C-104, and C-503.
File details come from the government source that posted it. Updated .