Amendment 0004.pdf

PDF 368 KB Posted

Attached to
Sacramento River East Levee (SREL) Contract 2
Solicitation number
W9123821B0001
Issued by

About this file

This document consists of an amendment to a solicitation and the related federal contract opportunity. The amendment clarifies clause 52.211-10, posts a revised drawing and pricing schedule, and notes revised specification sections. It also notes that while bids are due at 10:00 AM, the WebEx bid opening will not begin until 10:30 AM. The related federal contract opportunity is a firm-fixed price construction contract with an estimated value between $25-100 million to perform work on approximately 1.8 miles of seepage cutoff walls along the Sacramento River East Levee. The cutoff wall types include open trench soil-bentonite, slag cement-cement-bentonite, deep mix method, and jet grout walls. Additional scope includes utility relocations, work near a railroad, relief well modifications, removal and replacement of a sump, and contaminated soil handling. All work must be completed by December 2021 with levee reconstruction finished by September 2021. Bids are due by November 30, 2020 with award planned for around October 30, 2020.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0004 - Pricing Schedule.pdf PDF
Amendment 0004 - Summary of Changes.pdf PDF
Amendment 0004 - Specification Revision.pdf PDF
Amendment 0004 - Revised Drawing.pdf PDF
Amendment 0003 - Specification ATTACHMENTS.pdf PDF
Amendment 0003 - Specifications.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Summary.pdf PDF
Amendment 0003 - Drawings.pdf PDF
Amendment 0002 - Revised Drawings.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 - Specifications ATTACHMENTS.pdf PDF
Amendment 0002 - Revised 2342 Specifications.pdf PDF
Amendment 0002 - Revised Pricing_Schedule.pdf PDF
Amendment 0002 - Summary.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
ARCF SREL C2 Site Visit 10NOV20.pdf PDF
Solicitation W9123821B0001.pdf PDF
Amendment 1.pdf PDF
Site Visit Map.pdf PDF
Attachment 3 - Drawings.10.29.2020.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 5 of 5.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 1 of 5.pdf PDF
Attachment 1 - Specifications_10.23.2020.pdf PDF
Attachment 7 - Pre-Award Survey.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 2 of 5.pdf PDF
Attachment 6 - Past Performance Questionnaire.pdf PDF
Attachment 5 - Pricing Schedule.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 4 of 5.pdf PDF
Attachment 4 - Wage Determination.CA20200007.10.9.2020.pdf PDF
Solicitation W9123821B0001.pdf PDF
Attachment 2 - Specifications_ATTACHMENTS_Part 3 of 5.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is to:

1) Clarify clause 52.211-10

2) Post a revised draw ing

3) Post a revised pricing schedule

4) Post revised specif ication sections

5) Note that w hile bids are due at 10am, the WebEx bid opening w ill not begin until 10:30 No other changes are made or implied.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123821B0001

X 9B. DATED (SEE ITEM 11)

30-Oct-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Dec-2020

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123821B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 2 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the work ready for use not later than the schedule set forth below:

CLIN 0001 – NTP date through September 30, 2021 CLIN 0002 – NTP date through September 30, 2021

CLIN 0003 – NTP date through April 30, 2021 CLIN 1001 – Option exercised date through September 30, 2021 CLIN 1002 – Option exercised date through December 15, 2021 CLIN 1003 – Option exercised date through December 15, 2021 CLIN 1004 – Option exercised date through September 30, 2021

Contractor’s completion of work required by CLINs with a completion date of September 30, 2021 (all CLINs except CLINs 1002 and 1003) shall be memorialized by a certificate of completion executed by the Government and provided to the Contractor, showing the date the Government formally accepts said work as complete and in conformance with the applicable plans and specifications contained in this contract.

The time stated for completion for each CLIN shall include final cleanup of the premises.

Contractor’s completion of work required by CLINs with a completion date of September 30, 2021 (CLINs 0001, 0002, and, if exercised, CLINs 1001 and 1004) shall be memorialized by a Certificate of Completion executed by the Government and provided to the Contractor, showing the date the Government formally accepts said work as substantially complete and in conformance with the applicable plans and specifications contained in this contract.

Substantial completion of CLINs 0001, 0002, and, if exercised, CLINs 1001 and 1004, is defined as completion of all structural elements of levee improvement work required by applicable plans and specifications, such that the levee reaches under reconstruction in performance of these CLINs shall provide the full level of flood protection for which they have been re-designed as of the close of business on September 30, 2021. Cosmetic or superficial tasks not affecting the integrity of the levee structures, such as final grading, seeding, or paving of the levee crown, may remain as “punch list items” for prompt completion after September 30, 2021 without placing the contractor in breach of its duty hereunder.

On the date the Government reasonably determines that the Contractor has achieved substantial completion of the work required by CLINs 0001, 0002, and, if exercised, CLINs 1001 and 1004, the Government shall issue to the contractor Certificate(s) of Completion, as stated above.

W9123821B0001

Final completion of all work required in performance of the contract must be achieved by December 15, 2021.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .