Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston -Weapons Station, Goose Creek, South Carolina

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA441820R0016
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Goose Creek SC 29445 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals to repair HVAC systems at dormitory buildings 2405 and 2406 at Joint Base Charleston-Weapons Station in Goose Creek, South Carolina. The work includes exterior wall repairs and replacement of all exterior sealants, metal roof repairs, removing and replacing mechanical equipment, ductwork and piping. Testing and replacing fire dampers and temporarily supporting structural elements are also required. Proposals are due by December 10, 2020 and the contract will be awarded using a tradeoff process evaluating price and past performance. The period of performance is 550 calendar days from the notice to proceed.

This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 238210 and PSC code R499. The place of performance is Joint Base Charleston-Weapons Station in Goose Creek, South Carolina. The estimated value is between $1-5 million. Key details include replacing variable air volume air handling units, exhaust fans, energy recovery modules, and testing and replacing any faulty fire dampers found in the dormitory buildings.

Notice text

8 versions

Update #8 · Latest ·

**ATTENTION TO ALL**

Proposals are due Today, 10 Dec 2020 at 3:00pm.  I will be located at The Pass & Registration/Visitor Control Center (VCC) at Joint Base Charleston - Air Base off Dorchester Road at 02:30 PM to start collecting proposals.  Here is the Address just incase you are not sure exactly where the VCC is at:  

W. Hill Blvd, bldg 1953, Joint Base Charleston, SC 29404.  

- If you have any questions, please do no hesitate to reach out to me.  (843) 963-5167 or byron.faison@us.af.mil.

**Please see Amendment 6 for current changes.  See Attachment 16 and 17

1.  Add Attachment 16 - W401-W404 Elevations FA441820R0010/21R0002 20201203
2.  Add Attachment 17 - Questions and Answers 20R0010/21R0002 Amendment 6 Fire Protection 20201203

**Please see Amendment 5 for current changes. 

The proposal due date has been extended from 1 December 2020 at 3:00 PM EST to 10 December 2020 at 3:00 PM EST.****

**Please see Amendment 4 for current changes.  Attachment 14 and 15 have been attached.

1. Add Attachment 14 -As-Built Drawings for Buildings 2405 and 2406 Memorandum. The memorandum states, potential offerors will need to email byron.faison@us.af.mil for the DoD SAFE link to the
drawings, because of the file size. Once an email is received, the DoDSAFE link for the As-Built
drawings will be sent to the offereor.
a. Building 2405 is labeled number 7 and building 2406 is labeled number 6 in the As-Built
Drawings.
2. Update CLIN 0003. It is now CLIN 0003 - Bid Option #1: Fire Alarm System Replacement for BEQ
2405.
3. Add CLIN 0004 - Bid Option #2: Fire Alarm System Replacement for BEQ 2406.
4. Post Sign-In sheet from the site visit on 18 November 2020 at the Weapons Station.
5. Add deadline for offeror questions from the second site visit. Questions are due 20 November
2020 at 3:00 PM.

**Please see Amendment 3 for current changes.  Attachment 10, 11, 12, and 13 have been attached.  Proposal Due date is now 1 December 2020 at 03:00 PM EST.** 

**Please see Amendment 2 for current changes.  Attachment 7,8, and 9 have been attached.  

**THE SOLICITATION NUMBER HAS CHANGED FROM FA4418-20-R-0016 TO FA4418-21-R-0002 due to the fiscal year changing from FY20 to FY21**

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 

Update #7 ·

**Please see Amendment 6 for current changes.  See Attachment 16 and 17

1.  Add Attachment 16 - W401-W404 Elevations FA441820R0010/21R0002 20201203
2.  Add Attachment 17 - Questions and Answers 20R0010/21R0002 Amendment 6 Fire Protection 20201203

**Please see Amendment 5 for current changes. 

The proposal due date has been extended from 1 December 2020 at 3:00 PM EST to 10 December 2020 at 3:00 PM EST.****

**Please see Amendment 4 for current changes.  Attachment 14 and 15 have been attached.

1. Add Attachment 14 -As-Built Drawings for Buildings 2405 and 2406 Memorandum. The memorandum states, potential offerors will need to email byron.faison@us.af.mil for the DoD SAFE link to the
drawings, because of the file size. Once an email is received, the DoDSAFE link for the As-Built
drawings will be sent to the offereor.
a. Building 2405 is labeled number 7 and building 2406 is labeled number 6 in the As-Built
Drawings.
2. Update CLIN 0003. It is now CLIN 0003 - Bid Option #1: Fire Alarm System Replacement for BEQ
2405.
3. Add CLIN 0004 - Bid Option #2: Fire Alarm System Replacement for BEQ 2406.
4. Post Sign-In sheet from the site visit on 18 November 2020 at the Weapons Station.
5. Add deadline for offeror questions from the second site visit. Questions are due 20 November
2020 at 3:00 PM.

**Please see Amendment 3 for current changes.  Attachment 10, 11, 12, and 13 have been attached.  Proposal Due date is now 1 December 2020 at 03:00 PM EST.** 

**Please see Amendment 2 for current changes.  Attachment 7,8, and 9 have been attached.  

**THE SOLICITATION NUMBER HAS CHANGED FROM FA4418-20-R-0016 TO FA4418-21-R-0002 due to the fiscal year changing from FY20 to FY21**

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 

Update #6 ·

**Please see Amendment 5 for current changes. 

The proposal due date has been extended from 1 December 2020 at 3:00 PM EST to 10 December 2020 at 3:00 PM EST.****

**Please see Amendment 4 for current changes.  Attachment 14 and 15 have been attached.

1. Add Attachment 14 -As-Built Drawings for Buildings 2405 and 2406 Memorandum. The memorandum states, potential offerors will need to email byron.faison@us.af.mil for the DoD SAFE link to the
drawings, because of the file size. Once an email is received, the DoDSAFE link for the As-Built
drawings will be sent to the offereor.
a. Building 2405 is labeled number 7 and building 2406 is labeled number 6 in the As-Built
Drawings.
2. Update CLIN 0003. It is now CLIN 0003 - Bid Option #1: Fire Alarm System Replacement for BEQ
2405.
3. Add CLIN 0004 - Bid Option #2: Fire Alarm System Replacement for BEQ 2406.
4. Post Sign-In sheet from the site visit on 18 November 2020 at the Weapons Station.
5. Add deadline for offeror questions from the second site visit. Questions are due 20 November
2020 at 3:00 PM.

**Please see Amendment 3 for current changes.  Attachment 10, 11, 12, and 13 have been attached.  Proposal Due date is now 1 December 2020 at 03:00 PM EST.** 

**Please see Amendment 2 for current changes.  Attachment 7,8, and 9 have been attached.  

**THE SOLICITATION NUMBER HAS CHANGED FROM FA4418-20-R-0016 TO FA4418-21-R-0002 due to the fiscal year changing from FY20 to FY21**

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 

Update #5 ·

**Please see Amendment 4 for current changes.  Attachment 14 and 15 have been attached.

1. Add Attachment 14 -As-Built Drawings for Buildings 2405 and 2406 Memorandum. The memorandum states, potential offerors will need to email byron.faison@us.af.mil for the DoD SAFE link to the
drawings, because of the file size. Once an email is received, the DoDSAFE link for the As-Built
drawings will be sent to the offereor.
a. Building 2405 is labeled number 7 and building 2406 is labeled number 6 in the As-Built
Drawings.
2. Update CLIN 0003. It is now CLIN 0003 - Bid Option #1: Fire Alarm System Replacement for BEQ
2405.
3. Add CLIN 0004 - Bid Option #2: Fire Alarm System Replacement for BEQ 2406.
4. Post Sign-In sheet from the site visit on 18 November 2020 at the Weapons Station.
5. Add deadline for offeror questions from the second site visit. Questions are due 20 November
2020 at 3:00 PM.

**Please see Amendment 3 for current changes.  Attachment 10, 11, 12, and 13 have been attached.  Proposal Due date is now 1 December 2020 at 03:00 PM EST.** 

**Please see Amendment 2 for current changes.  Attachment 7,8, and 9 have been attached.  

**THE SOLICITATION NUMBER HAS CHANGED FROM FA4418-20-R-0016 TO FA4418-21-R-0002 due to the fiscal year changing from FY20 to FY21**

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 

Update #4 ·

**Please see Amendment 3 for current changes.  Attachment 10, 11, 12, and 13 have been attached.  Proposal Due date is now 1 December 2020 at 03:00 PM EST.** 

**Please see Amendment 2 for current changes.  Attachment 7,8, and 9 have been attached.  

**THE SOLICITATION NUMBER HAS CHANGED FROM FA4418-20-R-0016 TO FA4418-21-R-0002 due to the fiscal year changing from FY20 to FY21**

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 

Update #3 ·

**Please see Amendment 2 for current changes.  Attachment 7,8, and 9 have been attached.  Proposal Due date is now 19 November 2020 at 03:00 PM EST.** 

**THE SOLICITATION NUMBER HAS CHANGED FROM FA4418-20-R-0016 TO FA4418-21-R-0002 due to the fiscal year changing from FY20 to FY21**

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 

Update #2 ·

**THE SOLICITATION NUMBER HAS CHANGED FROM FA4418-20-R-0016 TO FA4418-21-R-0002 due to the fiscal year changing from FY20 to FY21**

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 

Update #1 ·

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 

Files

File Type Posted
Amendment 06 - FA441821R00020006.pdf PDF
Attachment 17 - Questions and Answers 20R0010_21R0002 Amendment 6 Fire Protection 20201203.pdf PDF
Attachment 16 - W401-W404 Elevations FA441820R0010_21R0002 20201203.pdf PDF
Amendment 05 FA441821R00020005 SF 30.pdf PDF
Amendment 04 - FA441821R00020004 SF 30 111920.pdf PDF
Attachment 15 - BEQ SITE VISIT SIGN IN SHEET 18.Nov.20.pdf PDF
Attachment 14 - B2405_2406 DoD SAFE Memo.pdf PDF
Attachment 11 - New JBC Section 28 31 76 FINAL 2405 2406 Oct 2020.pdf PDF
Attachment 12 - Joint Base Charleston - Barracks Building 2408 - Rev-02 - 10-28-2020.pdf PDF
Attachment 5 - AF 66-Revised Submittal Register.xlsx XLSX spreadsheet
Attachment 10 - Addendum 1 2020-11-10.pdf PDF
Attachment 13 - New Section 09 29 00 gypsum board.pdf PDF
Amendment 03 to FA441821R00020003 20201110.pdf PDF
Amendment 02 FA441821R00020002 SF 30.pdf PDF
Attachment 3 - Green Procurement Form.pdf PDF
Attachment 4 - HVAC Plans duct dimensions.pdf PDF
Amendment 02 FA441821R00020002 SF 30.pdf PDF
Attachment 9 - Pre-Bid Questions for B2405 B2406 - November 3 2020 11022020.pdf PDF
Attachment 8 - SIGN-IN SHEET for 20200924 (filled in).pdf PDF
Attachment 7 - Attic Sprinkler Iso Vlv Loc.pdf PDF
Amendment 01 - FA441821R00020001 SF 30.pdf PDF
FA441820R0016 20200914 Solicitation.pdf PDF
Attachment 4 - Green Procurement Form.pdf PDF
Attachment 6 - WD Berkeley County 14 Aug 2020.pdf PDF
Attachment 5 - Submittal Register.pdf PDF
Attachment 3 - Performance Time-B2405-2406.pdf PDF
Attachment 2 - SPECS Final 2020 06 15.pdf PDF
Attachment 1 - Drawings for B2405 and B2406.pdf PDF
Show all 28

Notice history

Notice Type Posted
Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston -Weapons Station, Goose Creek, South Carolina Award Award Notice
This notice Latest solicitation Solicitation
Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston, South Carolina Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Repair Naval Reserve Training Facility B3370 Charleston AFB, South Carolina 29404, United States · NAICS 236220 Air Mobility Command Total Small Business
J041--White City B249 SE HVAC Repair Department of Veterans Affairs Va Sorcc White City, Oregon 97503, United States · NAICS 238220 Veterans Integrated Service Network 20 Service-Disabled Veteran-Owned Small Business
CON | Z2DA | replace chiller 1 B104 | 580-24-111 | solicitation Houston, Texas 77030, United States · NAICS 238220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business
HVAC Replacement - MI NAICS 238220 — Total Small Business
Y1DZ--replace chilled water pump at the boiler plant Department of Veterans Affairs Network Contracting Office 2 Bronx, New York 10468, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors