Attachment 5 - Submittal Register.pdf

PDF 187 KB Posted

Attached to
Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston -Weapons Station, Goose Creek, South Carolina
Solicitation number
FA441820R0016
Issued by

About this file

This submittal register outlines the required submissions for a project to repair HVAC systems at dormitory buildings 2405 and 2406 at Joint Base Charleston in South Carolina. The project includes removing and replacing exterior wall sealants, metal roof repairs, replacing louvers, replacing air handling and HVAC equipment, replacing ductwork and piping, and testing fire dampers. Submissions are grouped by specification section and paragraph, and include items such as demolition plans, material lists, shop drawings, product data, test reports, certificates of compliance, operation and maintenance manuals, as-built drawings, warranties, and training documentation. The register identifies the approving authority and outlines the submission classification, review periods, action codes, delivery methods and remarks for each required item.

View the file

Other files

File Type Posted
Attachment 17 - Questions and Answers 20R0010_21R0002 Amendment 6 Fire Protection 20201203.pdf PDF
Amendment 06 - FA441821R00020006.pdf PDF
Attachment 16 - W401-W404 Elevations FA441820R0010_21R0002 20201203.pdf PDF
Amendment 05 FA441821R00020005 SF 30.pdf PDF
Attachment 15 - BEQ SITE VISIT SIGN IN SHEET 18.Nov.20.pdf PDF
Amendment 04 - FA441821R00020004 SF 30 111920.pdf PDF
Attachment 14 - B2405_2406 DoD SAFE Memo.pdf PDF
Attachment 11 - New JBC Section 28 31 76 FINAL 2405 2406 Oct 2020.pdf PDF
Attachment 12 - Joint Base Charleston - Barracks Building 2408 - Rev-02 - 10-28-2020.pdf PDF
Attachment 10 - Addendum 1 2020-11-10.pdf PDF
Amendment 03 to FA441821R00020003 20201110.pdf PDF
Attachment 13 - New Section 09 29 00 gypsum board.pdf PDF
Attachment 5 - AF 66-Revised Submittal Register.xlsx XLSX spreadsheet
Amendment 02 FA441821R00020002 SF 30.pdf PDF
Attachment 3 - Green Procurement Form.pdf PDF
Attachment 4 - HVAC Plans duct dimensions.pdf PDF
Amendment 02 FA441821R00020002 SF 30.pdf PDF
Attachment 7 - Attic Sprinkler Iso Vlv Loc.pdf PDF
Attachment 8 - SIGN-IN SHEET for 20200924 (filled in).pdf PDF
Attachment 9 - Pre-Bid Questions for B2405 B2406 - November 3 2020 11022020.pdf PDF
Amendment 01 - FA441821R00020001 SF 30.pdf PDF
Attachment 3 - Performance Time-B2405-2406.pdf PDF
FA441820R0016 20200914 Solicitation.pdf PDF
Attachment 4 - Green Procurement Form.pdf PDF
Attachment 6 - WD Berkeley County 14 Aug 2020.pdf PDF
Attachment 1 - Drawings for B2405 and B2406.pdf PDF
Attachment 2 - SPECS Final 2020 06 15.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 19 PAGES

Repair HVAC Dorms, Bldg 2403-2406

01 11 00 SD-01 Preconstruction Submittals

1.6.2 GOutage Requests

1.6.2 GRoad Closure Requests

1.6 GWork Clearance

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1 GList of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.4.2 GResume for the proposed

Superintendent 01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GQualifications

1.3 G CENMProject Schedule

1.4.1 G CENMInitial Contract Progress Report

(AF IMT 3065)

1.4.2 G CENMInitial Contract Progress

Schedule (AF IMT 3064) SD-07 Certificates

1.3.3 G CENMProject Schedule Updates

1.4.1 GMonthly Contract Progress

Reports (AF IMT 3065)

1.4.2 GMonthly Contract Progress

Schedules (AF IMT 3064) 01 33 00 SD-01 Preconstruction Submittals

1.6 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 19 PAGES

01 35 26 1.7 GActivity Hazard Analysis (AHA)

1.6.1.1 GCritical Lift Plan

1.5.1.3 GCrane Operators

SD-06 Test Reports 1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3Crane Reports

SD-07 Certificates 1.8.1Confined Space Entry Permit 1.8.1Hot Work Permit 1.13License Certificates

01 45 00 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

3.1.1Written Practices 3.1.1NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

3.1.1Daily Reports 3.1.3Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 19 PAGES

01 45 35 SD-07 Certificates 2.1Fabrication Plant 2.1Certificate of Compliance

3.1.1 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

SD-11 Closeout Submittals

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

SD-03 Product Data 1.4Backflow Preventers

SD-06 Test Reports 2.2.5Backflow Preventer Tests

SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers

01 54 00.00 31 SD-03 Product Data

1.5.2.1 GAffirmative Procurement

Reporting Form 01 57 19.00 31 SD-01 Preconstruction Submittals

1.7.1 GPreconstruction Survey

1.8.3 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 19 PAGES

01 57 19.00 31 1.6 GDirt and Dust Control Plan SD-06 Test Reports

3.9.2Disposal Requirements 1.8.4Erosion and Sediment Control

Inspection Reports 3.4Erosion and Sediment Control

Inspection Reports 3.4Storm Water Inspection Reports for General Permit

1.8.5 GSolid Waste Disposal Report

SD-07 Certificates

1.8.2 GContractor 40 CFR employee

training records SD-11 Closeout Submittals

3.4.2 GStorm Water Pollution Prevention

Plan compliance notebook

1.8Waste Determination Documentation

3.7.2Waste Determination Documentation

1.8.1Disposal Documentation for Hazardous and Regulated Waste

1.8.2Contractor 40 CFR Employee Training Records

1.7.2Solid Waste Disposal Permit 1.8.5Solid Waste Disposal Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 19 PAGES

01 57 19.00 31 3.7.2Hazardous Waste/Debris Management

1.8.3Regulatory Notifications 01 57 20.00 31 SD-01 Preconstruction Submittals

1.4.1Material Safety Data Sheets

(MSDS)

SD-06 Test Reports 1.8Green Procurement 1.8Green Procurement 1.3Recycling Report 1.3Recycling Report

01 74 19.00 31 SD-01 Preconstruction Submittals

1.3.3 GConstruction Waste Management

Plan 01 78 00 SD-03 Product Data

1.5.1Warranty Management Plan 1.5.4Warranty Tags 1.4Spare Parts Data

SD-08 Manufacturer’s Instructions 3.9Preventative Maintenance 3.9Condition Monitoring 3.9Inspection 1.5.1Instructions

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 19 PAGES

01 78 00 3.7 GOperation and Maintenance Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract

Specifications

3.10 GInterim DD FORM 1354

3.10 GChecklist for DD FORM 1354

02 05 09 SD-01 Preconstruction Submittals 1.4Demolition Plan

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.10 GExisting Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals 3.2.2Receipts

07 24 09 SD-03 Product Data 2.1Substrate 2.3Thermal Insulation 2.4Accessories 2.5Base Coat

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 19 PAGES

07 24 09 2.6Reinforcing Fabric 2.7Finish Coat 1.7Warranty

SD-04 Samples 2.8Sealant 3.4Sample Installation

SD-07 Certificates 1.4Qualification of Installer

SD-08 Manufacturer’s Instructions 2.1Substrate

SD-10 Operation and Maintenance Data

2.7finish 07 41 09 SD-02 Shop Drawings

3.2Metal 07 60 09 SD-02 Shop Drawings

2.1.2 GKynar Finish

2.2.3 GStainless Steel

3.1.4 GCleats

SD-04 Samples

2.1.2 GKynar Finish

2.1.3 GKynar 500 (Hylar 5000) finish

2.3.1 GFasteners

2.3.2 GWaterproof Underlayment

2.3.3 GButyl Tape

07 84 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 19 PAGES

07 84 00 2.1 GFirestopping System SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 09 SD-03 Product Data 2.1.1.4Color Chart 3.3Sealants

SD-04 Samples 2.1.1Exterior Sealant

SD-07 Certificates 3.3Sealants 2.1.2.1Silicone Tape 2.1.2.1Silicone Tape 2.2Primer 2.3Bond Breakers 2.4Backstops

SD-08 Manufacturer’s Instructions 3.3Sealants 2.1.2.1Silicone Tape 2.1.2.1Silicone Tape 2.2Primer 2.4Backstops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 19 PAGES

08 91 00 SD-02 Shop Drawings

1.4 GWall louvers

1.5 GWall louvers

SD-03 Product Data

2.2 GMetal Wall Louvers

SD-04 Samples

1.4 GWall louvers

1.5 GWall louvers

21 13 13.00 20 SD-02 Shop Drawings

1.4.2 GShop Drawings

SD-03 Product Data

2.1.1 GPipe

2.1.1 GFittings

2.1.4 GSprinklers

2.1.5 GPipe hangers and supports

2.1.1 GMechanical couplings

2.1.5 GSeismic Bracing

SD-06 Test Reports

3.4 Grequest to schedule Preliminary

Tests

3.4 GPreliminary Test Report

3.5 Grequest to schedule Final

Acceptance Test

3.5 GFinal Acceptance Test Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 19 PAGES

21 13 13.00 20 3.1 GInspection by Fire Protection Engineer

1.4.1 GFire Protection Engineer

1.4.2 GSprinkler System Installer

SD-11 Closeout Submittals 3.5As-built drawings

23 00 00 SD-02 Shop Drawings

1.4.3 GDetail Drawings

SD-03 Product Data

2.8.4 GRegisters And Grilles

2.9.1.1 GIn-Line Centrifugal Fans

2.10 GAir Handling Units

2.11.1.1 GVariable Volume, Single Duct, Fan-Powered Terminal Units

2.12 GEnergy Recovery Modules

2.9.3 GAir Filters & Filter Modules

1.4.4 GTest Procedures

2.8.3 GSmoke Dampers

2.8.2Fire Dampers

2.9.3.1 GAir Filters

SD-06 Test Reports

3.9 GPerformance Tests

3.7 GDamper Acceptance Test

SD-08 Manufacturer’s Instructions

3.2 GManufacturer's Installation

Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 19 PAGES

23 00 00 3.11.2Operation and Maintenance Training

SD-10 Operation and Maintenance Data

3.11.1 GOperation and Maintenance

Manuals

2.9.1.1 GIn-Line Centrifugal Fans

2.10 GAir Handling Units

2.11.1.1 GVariable Volume, Single Duct, Fan-Powered Terminal Units 23 05 48.00 40 SD-02 Shop Drawings

1.2 GInstallation Drawings

1.2 GOutline Drawings

SD-03 Product Data

1.2 GEquipment and Performance

Data SD-06 Test Reports

2.4 GAllowable Deflection

2.4 GMeasured Deflection

23 05 93 SD-01 Preconstruction Submittals

1.3 GRecord Of Existing Conditions

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 19 PAGES

23 05 93 1.3 GEquipment and Performance Data

SD-06 Test Reports

3.3.4 GCertified Final DALT Report

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

3.4.2 GTAB Pre-Field Engineering

Report 23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 19 PAGES

23 07 00 3.4 GEquipment Insulation Systems 23 09 23.13 20 SD-02 Shop Drawings

1.4.1.1 GControl system drawings title

sheet

1.4.1.2 GList of I/O Points

1.4.1.3 GControl System Components List

1.4.1.4 GControl system schematics

1.4.1.5 GHVAC Equipment Electrical

Ladder diagrams

1.4.1.6 GComponent wiring diagrams

1.4.1.7 GTerminal strip diagrams

1.4.1.8 GBACnet communication

architecture schematic SD-03 Product Data

2.1.1 GDirect Digital Controllers

2.1.1.13 GBACnet Gateways

2.1.4 GBACnet Protocol Analyzer

2.1.2 GDDC Software

2.1.3 GBACnet Operator Workstation

2.1.3.1 GBACnet Operator Workstation

DDC Software

2.2 GSensors and Input Hardware

2.2.6 GAir Flow Monitoring Station

2.3 GOutput Hardware

2.4.2 GSurge and transient protection

2.6 GIndicators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 19 PAGES

23 09 23.13 20 2.5.1 GDuct smoke detectors

2.7 GVariable frequency (motor) drives

SD-05 Design Data

3.4.2 GPerformance Verification Testing

Plan

3.4.4 GPre-Performance Verification

Testing Checklist SD-06 Test Reports

3.4.11 GPerformance Verification Testing

Report

SD-07 Certificates

1.6.6 GContractor's Qualifications

SD-09 Manufacturer’s Field Reports

3.4.1 GPre-PVT Checklist

SD-10 Operation and Maintenance Data

1.4 GBACnet Direct Digital Control

Systems

3.3 GControls System Operators

Manuals

2.7.2 GVFD Service Manuals

SD-11 Closeout Submittals

3.5.1 GTraining documentation

23 31 13.00 40 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 19 PAGES

23 31 13.00 40 Part 2 GMaterial, Equipment, and Fixture Lists

2.1.1 GRecords of Existing Conditions

SD-02 Shop Drawings

2.1 GConnection Diagrams

2.2.1 GOffset Fitting Configurations

SD-03 Product Data 2.1.1Equipment and Performance

Data

2.3.1 GGalvanized Steel Ductwork

Materials 2.3.2Brazing Materials 2.3.3Mill-Rolled Reinforcing and

Supporting Materials

2.2.1 GRound Sheet Metal Duct Fittings

2.2.4 GTurning Vanes

2.2.6 GFlexible Connectors

2.2.11 GPower Operated Dampers

2.2.10 GGravity Backdraft and Relief

Dampers

2.2.9 GManual Volume Dampers

SD-05 Design Data

2.1.1 GDesign Analysis and Calculations

SD-06 Test Reports

3.4.1 GDuctwork Leakage Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 19 PAGES

23 31 13.00 40 1.3Listing of Product Installations 2.3.1Galvanized Steel Ductwork

Materials 2.3.2Brazing Materials 2.3.3Mill-Rolled Reinforcing and

Supporting Materials 2.2.1Round Sheet Metal Duct Fittings 2.2.4Turning Vanes 2.2.5Dampers 2.2.6Flexible Connectors

SD-10 Operation and Maintenance Data

3.5.1 GOperation and Maintenance

Manuals

2.2.11 GPower Operated Dampers

SD-11 Closeout Submittals

3.5.2 GRecord Drawings

23 64 26 SD-03 Product Data

2.4.3 GCalibrated Balancing Valves

SD-06 Test Reports

3.1.1.3Piping Welds NDE Report

3.4.2 GPressure Tests Reports

SD-07 Certificates 3.1.1.2Welding Procedures and

Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 19 PAGES

23 64 26 3.1.1.1Employer's Record Documents (For Welding)

SD-10 Operation and Maintenance Data

2.4.3 GCalibrated Balancing Valves

26 05 48.00 10 SD-02 Shop Drawings

3.1Lighting Fixtures in Buildings 1.3Equipment Requirements

SD-03 Product Data

3.1 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 20 00 SD-02 Shop Drawings

2.9 GPanelboards

2.16 GWireways

3.1.6.1 GMarking Strips

SD-03 Product Data

2.9.1 GCircuit breakers

2.7 GSwitches

SD-06 Test Reports

3.4.2 G600-volt wiring test

3.4.3 GGrounding system test

SD-07 Certificates

2.8 GFuses

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 19 PAGES

26 20 00 1.5.1 GElectrical Systems 28 31 76 SD-02 Shop Drawings

GAmplifiers GDevice Operation GFinal As-Built Drawings GOperation And Maintenance

(O&M) Manual and Instructions GRiser Diagram GShop Drawing GWiring Diagram

SD-03 Product Data GBattery Charger, Wiring, and

Cable GElectromagnetic Door Holder, Transmitters and Housing GFAS and MNS firmware, FACP and MNS Panel GMonitor Module and Relay

Control and Mini-Module GNotification Appliance Circuits

(NACs) and NAC Extenders GSmoke Detectors or Sensors and

Heat Detectors or Sensors GWater Flow Detectors and

Tamper Switches SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 19 PAGES

28 31 76 GDesign Data SD-06 Test Reports

GTest Reports SD-07 Certificates

GCertificates SD-09 Manufacturer’s Field Reports

GManufacturer's Field Reports 32 92 23 SD-03 Product Data

2.4Fertilizer SD-06 Test Reports

2.2.1Topsoil composition tests SD-07 Certificates

2.1sods

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .