This solicitation seeks proposals to repair HVAC systems at two dormitory buildings at Joint Base Charleston-Weapons Station in Goose Creek, South Carolina. The work includes exterior wall repairs and modifications, replacement of all exterior sealants, metal roof repairs, removal and replacement of roof louvers, replacement of variable air volume air handling units and dedicated outdoor air handling units with new equipment, replacement of energy recovery modules, exhaust fans and filters, replacement of portions of chilled water piping and ductwork, testing and replacement of fire dampers, and structural reinforcement of hip and ridge beams and removal and reinstallation of HSS columns. The solicitation is issued by the Department of the Air Force Air Mobility Command.

View the file

Other files

File Type Posted
Attachment 17 - Questions and Answers 20R0010_21R0002 Amendment 6 Fire Protection 20201203.pdf PDF
Amendment 06 - FA441821R00020006.pdf PDF
Attachment 16 - W401-W404 Elevations FA441820R0010_21R0002 20201203.pdf PDF
Amendment 05 FA441821R00020005 SF 30.pdf PDF
Attachment 15 - BEQ SITE VISIT SIGN IN SHEET 18.Nov.20.pdf PDF
Amendment 04 - FA441821R00020004 SF 30 111920.pdf PDF
Attachment 14 - B2405_2406 DoD SAFE Memo.pdf PDF
Attachment 11 - New JBC Section 28 31 76 FINAL 2405 2406 Oct 2020.pdf PDF
Attachment 12 - Joint Base Charleston - Barracks Building 2408 - Rev-02 - 10-28-2020.pdf PDF
Attachment 10 - Addendum 1 2020-11-10.pdf PDF
Amendment 03 to FA441821R00020003 20201110.pdf PDF
Attachment 13 - New Section 09 29 00 gypsum board.pdf PDF
Attachment 5 - AF 66-Revised Submittal Register.xlsx XLSX spreadsheet
Amendment 02 FA441821R00020002 SF 30.pdf PDF
Attachment 3 - Green Procurement Form.pdf PDF
Attachment 4 - HVAC Plans duct dimensions.pdf PDF
Amendment 02 FA441821R00020002 SF 30.pdf PDF
Attachment 7 - Attic Sprinkler Iso Vlv Loc.pdf PDF
Attachment 8 - SIGN-IN SHEET for 20200924 (filled in).pdf PDF
Attachment 9 - Pre-Bid Questions for B2405 B2406 - November 3 2020 11022020.pdf PDF
Amendment 01 - FA441821R00020001 SF 30.pdf PDF
Attachment 5 - Submittal Register.pdf PDF
Attachment 3 - Performance Time-B2405-2406.pdf PDF
FA441820R0016 20200914 Solicitation.pdf PDF
Attachment 4 - Green Procurement Form.pdf PDF
Attachment 6 - WD Berkeley County 14 Aug 2020.pdf PDF
Attachment 2 - SPECS Final 2020 06 15.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

JBC-WS

PROJECT

LOCATION

T001

A I R

M

O B

L

T

Y

C

N D

E

P

F

H e v i s d n a l g

J

S

AutoCAD SHX Text

LIST OF DRAWINGS

NAVAL WEAPONS STATION

JBC-NWS PROJECT NO. DKGV 1073189

REPAIR HVAC, DORMITORY,

GOOSE CREEK, SOUTH CAROLINA

G

W

CHARLESTON

GEORGETOWN

o

ATLANTIC OCEAN

p

GEORGIA

SAVANNAH

ORANGEBURG

COLUMBIA

AUGUSTA

GREENVILLE

SPARTANBURG

FLORENCE

CHARLOTTE

WILMINGTON

BEAUFORT

SUMTER

NORTH

MYRTLE BEACH

NORTH CAROLINA

SCALE: 1"=30 MILES

%%UVICINITY MAP - CHARLESTON, SC

%%ULOCATION MAP - CHARLESTON

%%UJOINT BASE CHARLESTON-NAVAL WEAPONS STATION

JAMES ISLAND

NORTH

FOLLY RD

CHARLESTON HARBOR

CAINHOY RD

BEES FERRY RD

ASHLEY RIVER RD

SAVANNAH HWY

STONO

RIVER

COOPER

ASHLEY

MONTAGUE AVE

REMOUNT RD

RIVERS AVE

MARK CLARK EXPY

DORCHESTER RD

AVIATION AVE

ASHLEY PHOSPHATE RD

JOINT BASE CHARLESTON- AIR BASE

RED BANK RD

BUSHY PARK RD

FOSTER CREEK RD

N RHETT AVE

DORM BUILDINGS 2403-2406

RED BANK RD

TITLE SHEET

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

A/E SEAL

ANSI D (22"x34")

FOR JOINT BASE CHARLESTON

IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.

DRAWING REVISIONS

REV.

DESCRIPTION

PREP BY

DATE

APPR'D

DSGN BY:

DATE:

DRWN BY:

CHK BY:

APPROVED BY:

JOINT BASE CHARLESTON

BLDG 2405, TRIDENT HALL

DKGV 1073189

DKGV 1073189, REPAIR HVAC DORM

COA SEAL

U

Z

No. 00253

INC.

ENGINEERING

ADC

SHEET OF 49

BUILDING 2405, TRIDENT HALL

C001

CIVIL NOTES & ABBREVIATIONS

GENERAL NOTES 1. THE EROSION CONTROL PLANS CONTAINED HERE-IN ARE PART OF A LARGER COMPREHENSIVE THE EROSION CONTROL PLANS CONTAINED HERE-IN ARE PART OF A LARGER COMPREHENSIVE STORMWATER POLLUTION PREVENTION PLAN (SWPPP). ALL CONTRACTORS/SUBCONTRACTORS/PERSONS THAT WILL BE ENGAGED IN LAND DISTURBING ACTIVITIES SHALL BECOME FAMILIAR WITH AND COMPLY WITH ALL EROSION AND SEDIMENT CONTROL AND STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE SWPPP, DRAWINGS, SPECIFICATIONS AND PERMITS. 2. THE CONTRACTOR SHALL INSTALL TREE PROTECTION BARRICADES PRIOR TO BEGINNING THE CONTRACTOR SHALL INSTALL TREE PROTECTION BARRICADES PRIOR TO BEGINNING EARTHWORK OPERATIONS. 3. THE CONTRACTOR SHALL PROVIDE TEMPORARY AND PERMANENT SEEDING IN ALL AREAS THE CONTRACTOR SHALL PROVIDE TEMPORARY AND PERMANENT SEEDING IN ALL AREAS INSIDE OR OUTSIDE THE LIMITS OF CONSTRUCTION THAT ARE DISTURBED BY THE CONTRACTOR'S OPERATIONS. 4. CONTRACTOR SHALL GRADE ALL AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL CONTRACTOR SHALL GRADE ALL AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL APPROVAL. 5. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND TEMPORARY SUPPORTS, THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 6. THE GENERAL CONTRACTOR SHALL REVIEW AND STAMP APPROVED ANY AND ALL SHOP THE GENERAL CONTRACTOR SHALL REVIEW AND STAMP APPROVED ANY AND ALL SHOP DRAWINGS AND SUBMITTALS PRIOR TO SUBMITTING TO THE ENGINEER FOR REVIEW. 7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN THE SERVICES OF A QUALIFIED IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN THE SERVICES OF A QUALIFIED GEOTECHNICAL ENGINEER WHO SHALL PERFORM INVESTIGATIONS TO VERIFY THAT ALL WORK IS ACCOMPLISHED IN ACCORDANCE WITH THE SPECIFICATIONS AND/OR GEOTECHNICAL REPORT. 8. IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB SITE, THE ENGINEER SHALL IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB SITE, THE ENGINEER SHALL HAVE NO CONTROL OVER NOR RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK. 9. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY ANY REGULATORY AGENCY. 10. NUMEROUS WETLANDS ARE PRESENT ADJACENT TO THE NNPTC. EXTRA PRECAUTIONS ARE NUMEROUS WETLANDS ARE PRESENT ADJACENT TO THE NNPTC. EXTRA PRECAUTIONS ARE REQUIRED TO PREVENT UNINTENDED DIRECT IMPACTS OR INDIRECT IMPACTS VIA THE STORM DRAINAGE SYSTEM DISCHARGES.

BM BMP BTTM BW CB CGP CI CI CIP CL CMP CO CONC CSPP CY DCVA DI DIA DIP DS EL EW EXST FFE FG FH FIN FM GI HDPE IAW IE JB JBC LF LP MATL MAX MH MIN NIC NOI NOT NPDES NTS OC ODSA PC PCC PP PT PVC PVMT RAD RCP RCRA RD REQD RPBP R/W SABC SB SCDHEC SCDOT SD SF SS STA SWMU SWPPP TBM TC TG TP TYP VC W W/ WS WV

BENCHMARK EROSION CONTROL BEST MANAGEMENT PRACTICES BOTTOM BOTH WAYS CATCH BASIN NPDES CONSTRUCTION GENERAL PERMIT SCR 100000 CURB INLET CAST IRON CAST IRON PIPE CENTERLINE CORRUGATED METAL PIPE CLEANOUT CONCRETE CONSTRUCTION SAFETY AND PHASING PLAN CUBIC YARDS DOUBLE CHECK VALVE ASSEMBLY DROP INLET DIAMETER DUCTILE IRON PIPE DOWNSPOUT ELEVATION EACH WAY EXISTING FINISHED FLOOR ELEVATION FINISHED GRADE FIRE HYDRANT FINISHED FORCE MAIN GRATE INLET HIGH DENSITY POLYETHYLENE IN ACCORDANCE WITH INVERT ELEVATION JUNCTION BOX JOINT BASE CHARLESTON LINEAR FEET LIGHT POLE MATERIAL MAXIMUM MANHOLE MINIMUM NOT IN CONTRACT NOTICE OF INTENT NOTICE OF TERMINATION NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NOT TO SCALE ON CENTER OPERATOR OF DAY TO DAY SITE ACTIVITIES POINT OF CURVATURE PORTLAND CEMENT CONCRETE POWER POLE POINT OF TANGENT POLYVINYL CHLORIDE PAVEMENT RADIUS REINFORCED CONCRETE PIPE RESOURCE CONSERVATION AND RECOVERY ACT ROOF DRAIN REQUIRED REDUCED PRESSURE BACKFLOW PREVENTER RIGHT OF WAY STABILIZED AGGREGATE BASE COURSE SILT BARRIER SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STORM DRAINAGE SQUARE FEET SANITARY SEWER SERVICE STATION SOLID WASTE MANAGEMENT UNIT STORM WATER POLLUTION PREVENTION PLAN TEMPORARY BENCH MARK TOP OF CURB TOP OF GUTTER TOP OF PAVEMENT TYPICAL VITRIFIED CLAY WATER WITH WATER SERVICE WATER VALVE

%%UCIVIL ABBREVIATIONS

EXISTING UTILITIES & WORK REQUESTS: 1. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION. THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A PRIVATE UTILITY LOCATE COMPANY TO FIELD LOCATE AND MARK ALL UTILITIES LOCATED BY JBC OR PUPS PRIOR TO BEGINNING WORK. 2. SHOULD UTILITIES OTHER THAN THOSE SHOWN HEREON BE ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY AND TAKE APPROPRIATE MEASURES TO PROTECT THE LINE(S) AND ENSURE CONTINUED SERVICE. DAMAGE CAUSED TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. THE CONTRACTOR SHALL VERIFY THE CONNECTION POINTS OF NEW UTILITIES TO EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 3. CONTRACTOR SHALL CONTACT PALMETTO UTILITY LOCATION SERVICE AT 1-888-721-7877 PRIOR TO ANY WORK. 4. CONTRACTOR SHALL SUBMIT FOR AN APPROVED BCE (BASE CIVIL ENGINEERING) WORK CLEARANCE REQUEST, AF FORM 103 (DIG PERMIT), A MINIMUM OF 21 DAYS PRIOR TO THE START OF EXCAVATION, DIGGING WORK, OR WORK THAT DISRUPTS AIRCRAFT OR VEHICULAR TRAFFIC FLOW, BASE UTILITIES SERVICES, OR ROUTINE ACTIVITIES ON THE AIRFIELD OR AIR FORCE PROPERTY. THE CONTRACTOR SHALL COORDINATE WITH APPLICABLE SHOPS LISTED ON THE AIR FORCE FORM 103 (DIG PERMIT).

BID ITEM #1:FIRE DAMPER REPLACEMENT 1. CONTRACTOR SHALL PROVIDE WITH THEIR PROPOSAL A PER UNIT PRICE LINE ITEM AND TOTAL COST FOR THE REMOVAL AND REPLACEMENT OF # FIRE DAMPERS. THIS QUANTITY INCLUDES ALL FIRE DAMPERS TO BE REPLACED ON MECHANICAL SHEETS.

HAUL ROUTES: 1. EXISTING ROADS: HAUL ROUTES UTILIZING EXISTING BASE ROADWAYS WILL REMAIN OPEN EXISTING ROADS: HAUL ROUTES UTILIZING EXISTING BASE ROADWAYS WILL REMAIN OPEN : HAUL ROUTES UTILIZING EXISTING BASE ROADWAYS WILL REMAIN OPEN TO PATRON TRAFFIC AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL EXERCISE ALL NECESSARY PROTOCOLS TO INSURE SAFETY TO THE GENERAL PUBLIC ON ALL HAUL ROUTES. 2. DAMAGE: CONTRACTOR SHALL PREPARE A PHOTOGRAPHIC RECORD OF EXISTING DAMAGE: CONTRACTOR SHALL PREPARE A PHOTOGRAPHIC RECORD OF EXISTING : CONTRACTOR SHALL PREPARE A PHOTOGRAPHIC RECORD OF EXISTING ROADWAYS AND SIDEWALKS PRIOR TO CONSTRUCTION. DAMAGE TO EXISTING ROADWAYS AND SIDEWALKS, CAUSED BY CONSTRUCTION TRAFFIC, SHALL BE REPAIRED TO THE GOVERNMENT'S SATISFACTION AT NO ADDITIONAL COST. 3. TRAFFIC CONTROL: IF DEEMED NECESSARY BY EITHER THE CONTRACTOR OR GOVERNMENT, TRAFFIC CONTROL: IF DEEMED NECESSARY BY EITHER THE CONTRACTOR OR GOVERNMENT, : IF DEEMED NECESSARY BY EITHER THE CONTRACTOR OR GOVERNMENT, THE CONTRACTOR SHALL, AT NO ADDITIONAL COST TO THE GOVERNMENT, PREPARE AND SUBMIT A TRAFFIC CONTROL PLAN IN KEEPING WITH THE LATEST MUTCD MANUAL FOR APPROVAL. 4. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES IN A GOOD STATE OF APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES IN A GOOD STATE OF : THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES IN A GOOD STATE OF APPEARANCE.

PROJECT DURATION: 1. COMPLETION OF THE PROJECT SHALL BE IN COMPLIANCE WITH THE PROJECT DURATION COMPLETION OF THE PROJECT SHALL BE IN COMPLIANCE WITH THE PROJECT DURATION CHART SHOWN BELOW. 2. PROJECT & TASK DURATIONS ARE BASED ON CONTIGUOUS CALENDAR DAYS. PROJECT & TASK DURATIONS ARE BASED ON CONTIGUOUS CALENDAR DAYS. 3. THE ORDER OF TASKS ARE SUBJECT TO CHANGE BY THE GOVERNMENT. THE CONTRACTOR THE ORDER OF TASKS ARE SUBJECT TO CHANGE BY THE GOVERNMENT. THE CONTRACTOR SHALL ACCOMMODATE CHANGES IN TASK ORDER BY THE GOVERNMENT AT NO ADDITIONAL COST TO THE GOVERNMENT.

APPROXIMATE AREA

FOR CRANE SETUP, TYP.

SKIPJACK HALL

BLDG. 2406

TRIDENT HALL

BLDG. 2405

SEAWOLF HALL

BLDG. 2404

BLDG.

FIRE HYDRANT

STORMWATER

INLET

X

ORANGE SAFETY FENCE

SI

TREE CANOPY

TREE

CANOPY

CONTRACTOR SHALL CONTACT 811 FOR LOCATIONS OF ALL UTILITIES

AT LEAST 72 HOURS PRIOR TO BEGINNING CONSTRUCTION.

Know what's below.

Call befo er you dig.

C700

1 inch = ft.

( IN FEET )

HORIZONTAL SCALE

MAGNETIC

TS

PS

TEMPORARY SEEDING - INSTALL IAW DETAIL A/C720.

SODDING - INSTALL IAW DETAIL A/C720.

SILT FENCE - INSTALL IAW DETAIL B/C720.

CIVIL LEGEND - EROSION CONTROL

INLET PROTECTION - INSTALL IAW DETAIL A/C721.

GENERAL NOTES: : 1. CONTRACTOR IS RESPONSIBLE FOR ALL WORK SHOWN, UNLESS SPECIFICALLY INDICATED OTHERWISE. 2. CONTRACTOR SHALL CONTACT PALMETTO UTILITY LOCATION SERVICE AT 1-888-721-7877 AND RECEIVE JB-CHS DIG PERMIT PRIOR TO ANY WORK. CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND PROTECTING ALL UTILITIES. CONTACT THE ENGINEER IN THE EVENT THAT UTILITIES CONFLICT WITH NEW FACILITIES. 3. ALL PROJECT STAKEOUT SHALL BE PERFORMED BY A REGISTERED LAND SURVEYOR TO BE PAID FOR BY THE CONTRACTOR. FOR STAKEOUT, DO NOT RELY SOLELY ON THE PHYSICAL SCALE AS SHOWN IN DRAWINGS. REFER TO THE GIVEN DIMENSIONS, SYMBOL LEGEND, KEYNOTES, AND REFERENCED DETAILS FOR CORRECT STAKEOUT. 4. ALL CONTRACTORS/SUBCONTRACTORS/PERSON THAT WILL BE ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION CONTROL AND STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS AND PERMITS. 5. NUMEROUS WETLANDS ARE PRESENT ADJACENT TO THE NNPTC. EXTRA PRECAUTIONS ARE REQUIRED TO PREVENT UNINTENDED DIRECT IMPACTS OF INDIRECT IMPACTS VIA THE STORM DRAINAGE SYSTEM DISCHARGES.

KEYNOTES: : 1. REMOVE ALL TEMPORARY REMOVE ALL TEMPORARY EROSION CONTROL BMPS AFTER FINAL STABILIZATION HAS BEEN ACHIEVED.

LAND DISTURBANCE/SWPPP SEQUENCE OF CONSTRUCTION NOTES: 1. CONTRACTOR SHALL MAINTAIN THE LAYOUT AREA IN A GOOD STATE OR CONTRACTOR SHALL MAINTAIN THE LAYOUT AREA IN A GOOD STATE OR APPEARANCE DURING CONSTRUCTION. CONTRACTOR SHALL RESTORE THE LAYOUT AREA TO EXISTING OR BETTER CONDITIONS AFTER COMPLETION OF THE PROJECT. 2. IF LAYOUT AREA IS LOCATED OUTSIDE THE DESIGNATED TRAILER AND LAYOUT IF LAYOUT AREA IS LOCATED OUTSIDE THE DESIGNATED TRAILER AND LAYOUT AREA, AS SHOWN ON C700 SERIES, THE CONTRACTOR SHALL OBTAIN A SEPARATE LAND DISTURBANCE/STORMWATER PERMIT FOR AN OFFSITE LAYOUT AREA.

EROSION CONTROL PLAN

SO

TYP.

v i s e a i

C720

EROSION CONTROL DETAIL

FILTER FABRIC BURIAL DETAIL

FILTER FABRIC INSTALLATION DETAIL

POST INSTALLATION DETAIL

NOT TO SCALE

%%U SCDHEC TYPE A FILTER FABIC INLET PROTECTION

FILTER FABRIC REQUIREMENTS: 1. SILT FENCE MUST BE COMPOSED OF WOVEN GEOTEXTILE FILTER FABRIC THAT SILT FENCE MUST BE COMPOSED OF WOVEN GEOTEXTILE FILTER FABRIC THAT CONSISTS OF THE FOLLOWING REQUIREMENTS: - COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS OF AT LEAST 85% COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS OF AT LEAST 85% BY WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES THAT ARE FORMED INTO A NETWORK SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER; - FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES AFTER INSTALLATION; - FREE OF ANY DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FREE OF ANY DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING PROPERTIES; AND, - HAVE A MINIMUM WIDTH OF 36-INCHES. HAVE A MINIMUM WIDTH OF 36-INCHES. 2. USE ONLY FABRIC APPEARING ON SC DOT'S QUALIFIED PRODUCTS LISTING (QPL) APPROVAL USE ONLY FABRIC APPEARING ON SC DOT'S QUALIFIED PRODUCTS LISTING (QPL) APPROVAL SHEET #34, MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE SC DOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. 3. 12-INCHES OF THE FABRIC SHOULD BE PLACED WITHIN EXCAVATED TRENCH AND TOED IN 12-INCHES OF THE FABRIC SHOULD BE PLACED WITHIN EXCAVATED TRENCH AND TOED IN WHEN THE TRENCH IS BACKFILLED. 4. FILTER FABRIC SHALL BE PURCHASED IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF FILTER FABRIC SHALL BE PURCHASED IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. 5. FILTER FABRIC SHALL BE INSTALLED AT A MINIMUM OF 24-INCHES ABOVE THE GROUND.FILTER FABRIC SHALL BE INSTALLED AT A MINIMUM OF 24-INCHES ABOVE THE GROUND.

POST REQUIREMENTS: 1. SILT FENCE POSTS MUST BE 48-INCH LONG STEEL POSTS THAT MEET, AT A MINIMUM, THE SILT FENCE POSTS MUST BE 48-INCH LONG STEEL POSTS THAT MEET, AT A MINIMUM, THE FOLLOWING PHYSICAL CHARACTERISTICS. - COMPOSED OF A HIGH STRENGTH STEEL WITH A MINIMUM YIELD STRENGTH OF 50,000 PSI. COMPOSED OF A HIGH STRENGTH STEEL WITH A MINIMUM YIELD STRENGTH OF 50,000 PSI. 50,000 PSI. - INCLUDE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND A INCLUDE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND A NOMINAL "T" LENGTH OF 1.48-INCHES. - WEIGH 1.25 POUNDS PER FOOT (± 8%) WEIGH 1.25 POUNDS PER FOOT (± 8%) 2. POSTS SHALL BE EQUIPPED WITH PROJECTIONS TO AID IN FASTENING OF FILTER FABRIC. POSTS SHALL BE EQUIPPED WITH PROJECTIONS TO AID IN FASTENING OF FILTER FABRIC. 3. INSTALL POSTS TO A MINIMUM OF 24-INCHES. A MINIMUM HEIGHT OF 1- TO 2-INCHES INSTALL POSTS TO A MINIMUM OF 24-INCHES. A MINIMUM HEIGHT OF 1- TO 2-INCHES ABOVE THE FABRIC SHALL BE MAINTAINED, AND A MAXIMUM HEIGHT OF 3 FEET SHALL BE MAINTAINED ABOVE THE GROUND. 4. POST SPACING SHALL BE AT A MAXIMUM OF 3-FEET ON CENTER.POST SPACING SHALL BE AT A MAXIMUM OF 3-FEET ON CENTER.

INSPECTION AND MAINTENANCE: 1. THE KEY TO FUNCTIONAL INLET PROTECTION IS WEEKLY INSPECTIONS, ROUTINE THE KEY TO FUNCTIONAL INLET PROTECTION IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. 2. REGULAR INSPECTIONS OF INLET PROTECTION SHALL BE CONDUCTED ONCE EVERY REGULAR INSPECTIONS OF INLET PROTECTION SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVEN THAT PRODUCES 1/2-INCH OR MORE OF PRECIPITATION. 3. ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE FILTER FABRIC IS ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE FILTER FABRIC IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY. 4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE FILTER FABRIC. WHEN A SUMP IS INSTALLED IN FRONT OF THE FABRIC, SEDIMENT SHOULD BE REMOVED WHEN IT FILLS APPROXIMATELY 1/3 THE DEPTH OF THE SUMP. 5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 6. CHECK FOR AREAS WHERE STORMWATER RUNOFF HAS ERODED A CHANNEL CHECK FOR AREAS WHERE STORMWATER RUNOFF HAS ERODED A CHANNEL BENEATH THE FILTER FABRIC, OR WHERE THE FABRIC HAS SAGGED OR COLLAPSED DUE TO RUNOFF OVERTOPPING THE INLET PROTECTION. 7. CHECK FOR TEARS WITHIN THE FILTER FABRIC, AREAS WHERE FABRIC HAS BEGUN CHECK FOR TEARS WITHIN THE FILTER FABRIC, AREAS WHERE FABRIC HAS BEGUN TO DECOMPOSE, AND FOR ANY OTHER CIRCUMSTANCE THAT MAY RENDER THE INLET PROTECTION INEFFECTIVE. REMOVED DAMAGED FABRIC AND REINSTALL NEW FILTER FABRIC IMMEDIATELY. 8. INLET PROTECTION STRUCTURES SHOULD BE REMOVED AFTER ALL THE DISTURBED INLET PROTECTION STRUCTURES SHOULD BE REMOVED AFTER ALL THE DISTURBED AREAS ARE PERMANENTLY STABILIZED. REMOVE ALL CONSTRUCTION MATERIAL AND SEDIMENT, AND DISPOSE OF THEM PROPERLY. GRADE THE DISTURBED AREA TO THE ELEVATION OF THE DROP INLET STRUCTURE CREST. STABILIZE ALL BARE AREAS IMMEDIATELY.

1.25 LB PER LINEAR FOOT STEEL POSTS

ATTACH FILTER FABRIC TO POSTS WITH HEAVY DUTY PLASTIC TIES ALONG TOP 8-INCHES OF FABRIC.

FOLD FABRIC TO OVERLAP 1 FOOT AND SECURE TO POSTS WITH HEAVY DUTY PLASTIC TIES

BURY FABRIC (SEE DETAIL)

BURY AND TRENCH MINIMUM OF 12 INCHES OF FILTER FABRIC

%%U SEEDING SPECIFICATIONS

PLANTING SEASONS & SEED RATES

PLANTING SEASON

VARIETY

PERCENT (BY WEIGHT)

RATE

PERENNIAL RYE

35 LBS/ACRE

(TEMPORARY SEEDING)

YEAR ROUND

ANNUAL RYE

55 LBS/ACRE

%%uTEMPORARY SEEDING

SEEDING COMPOSITION

MIN %

MIN %

MAX. %

PURE SEED

GERMINATION &

WEED SEED

HARD SEED

COMMON BERMUDA

ANNUAL RYE

PERENNIAL RYE

ALL

PLANTING DATES

TIFWAY 419 SOD

SEED TYPE

%%uSODDING

%%uPLAN

%%uSECTION 1-1

LANDSCAPING SPIKES @ MAX. 6' O.C.E.W.

FENCE FABRIC

FENCE FABRIC

EDGE OF PAVEMENT

NEW RWY/TWY PAVEMENT, SEE SHEETS C620 & C621 FOR TYPICAL SECTIONS

%%UTEMPORARY SEED COMPOSITION TABLE

1.5" DROP AFTER SODDING

LANDSCAPING SPIKES @ MAX. 6' O.C.E.W.

SODDING NOTES: 1. CONTRACTOR SHALL STAKE ALL SOD LOCATED ADJACENT OT AIRFIELD PAVEMENT WITH FENCE FABRIC, 10-12" LANDSCAPE SPIKES AND WIRE. THE WIRE SHALL BE SECURED TO SPIKES AND THE SPIKES DRIVEN INTO THE GROUND. SPIKES SHALL BE SPACED A MAXIMUM OF 6' ON CENTER. SPIKES SHALL BE SPACED ALONG ALL EDGES OF FENCE FABRIC. 2. CONTRACTOR SHALL BE REQUIRED TO COME BACK AND REMOVE FENCE FABRIC, LANDSCAPE SPIKES, AND WIRES ONCE GRASS ROOTS ARE ESTABLISHED ENOUGH TO RESIST JET BLAST, AS DETERMINED BY THE CONTRACTING OFFICER.

GRASSING NOTES: 1. SEASON 2 AND TEMPORARY SEEDING SHALL BE REPLACED BY SEASON 1 PLANTINGS FOR A PERMANENT STAND OF TURF.

v i s e a i

C721

EROSION CONTROL DETAIL

%%u SCDHEC SILT FENCE DETAIL

SILT FENCE INSTALLATION

V-SHAPED TRENCH DETAIL

FLAT-BOTTOM TRENCH DETAIL

RUNOFF

GENERAL NOTES: 1. DO NOT PLACE SILT FENCE ACROSS CHANNELS OR IN DO NOT PLACE SILT FENCE ACROSS CHANNELS OR IN OTHER AREAS SUBJECT TO CONCENTRATED FLOWS. SILT FENCE SHOULD NOT BE USED AS A VELOCITY CONTROL BMP. CONCENTRATED FLOWS ARE ANY FLOWS GREATER THAN 0.5 CFS. 2. MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE SILT FENCE SHALL BE 100-FEET. 3. MAXIMUM SLOPE STEEPNESS (NORMAL MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO THE FENCE LINE) SHALL BE 2:1. 4. SILT FENCE JOINTS, WHEN NECESSARY, SHALL BE SILT FENCE JOINTS, WHEN NECESSARY, SHALL BE COMPLETED BY ONE OF THE FOLLOWING OPTIONS: - WRAP EACH FABRIC TOGETHER AT A SUPPORT POST WRAP EACH FABRIC TOGETHER AT A SUPPORT POST WITH BOTH ENDS FASTENED TO THE POST, WITH A 1-FOOT MINIMUM OVERLAP; - OVERLAP SILT FENCE BY INSTALLING 3-FEET PASSED OVERLAP SILT FENCE BY INSTALLING 3-FEET PASSED THE SUPPORT POST TO WHICH THE NEW SILT FENCE ROLL IS ATTACHED. ATTACH OLD ROLL TO NEW ROLL WITH HEAVY-DUTY PLASTIC TIES; OR, - OVERLAP ENTIRE WIDTH OF EACH SILT FENCE ROLL OVERLAP ENTIRE WIDTH OF EACH SILT FENCE ROLL FROM ONE SUPPORT POST TO THE NEXT SUPPORT POST. 5. ATTACH FILTER FABRIC TO THE STEEL POSTS USING ATTACH FILTER FABRIC TO THE STEEL POSTS USING HEAVY-DUTY PLASTIC TIES THAT ARE EVENLY SPACED WITHIN THE TOP 8-INCHES OF THE FABRIC. 6. INSTALL THE SILT FENCE PERPENDICULAR TO THE INSTALL THE SILT FENCE PERPENDICULAR TO THE DIRECTION OF THE STORMWATER FLOW AND PLACE THE SILT FENCE THE PROPER DISTANCE FROM THE TOE OF STEEP SLOPES TO PROVIDE SEDIMENT STORAGE AND ACCESS FOR MAINTENANCE AND CLEANOUT. 7. INSTALL SILT FENCE CHECKS (TIE-BACKS) EVERY INSTALL SILT FENCE CHECKS (TIE-BACKS) EVERY 50-100 FEET, DEPENDENT ON SLOPE, ALONG SILT FENCE THAT IS INSTALLED WITH SLOPE AND WHERE CONCENTRATED FLOWS ARE EXPECTED OR ARE DOCUMENTED ALONG THE PROPOSED/INSTALLED SILT FENCE.

POST REQUIREMENTS: 1. SILT FENCE POSTS MUST BE 48-INCH LONG STEEL SILT FENCE POSTS MUST BE 48-INCH LONG STEEL POSTS THAT MEET, AT A MINIMUM, THE FOLLOWING PHYSICAL CHARACTERISTICS. - COMPOSED OF A HIGH STRENGTH STEEL WITH A COMPOSED OF A HIGH STRENGTH STEEL WITH A MINIMUM YIELD STRENGTH OF 50,000 PSI. - INCLUDE A STANDARD "T" SECTION WITH A NOMINAL INCLUDE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND A NOMINAL "T" LENGTH OF 1.48-INCHES. - WEIGH 1.25 POUNDS PER FOOT ( 8%) WEIGH 1.25 POUNDS PER FOOT (± 8%)2. POSTS SHALL BE EQUIPPED WITH PROJECTIONS TO POSTS SHALL BE EQUIPPED WITH PROJECTIONS TO AID IN FASTENING OF FILTER FABRIC. 3. STEEL POSTS MAY NEED TO HAVE A METAL SOIL STEEL POSTS MAY NEED TO HAVE A METAL SOIL STABILIZATION PLATE WELDED NEAR THE BOTTOM WHEN INSTALLED ALONG STEEP SLOPES OR INSTALLED IN LOOSE SOILS. THE PLATE SHOULD HAVE A MINIMUM CROSS SECTION OF 17-SQUARE INCHES AND BE COMPOSED OF 15 GAUGE STEEL, AT A MINIMUM. THE METAL SOIL STABILIZATION PLATE SHOULD BE COMPLETELY BURIED. 4. INSTALL POSTS TO A MINIMUM OF 24-INCHES. A INSTALL POSTS TO A MINIMUM OF 24-INCHES. A MINIMUM HEIGHT OF 1- TO 2- INCHES ABOVE THE FABRIC SHALL BE MAINTAINED, AND A MAXIMUM HEIGHT OF 3 FEET SHALL BE MAINTAINED ABOVE THE GROUND. 5. POST SPACING SHALL BE AT A MAXIMUM OF 6-FEET POST SPACING SHALL BE AT A MAXIMUM OF 6-FEET ON CENTER.

FABRIC REQUIREMENTS: 1. SILT FENCE MUST BE COMPOSED OF WOVEN SILT FENCE MUST BE COMPOSED OF WOVEN GEOTEXTILE FILTER FABRIC THAT CONSISTS OF THE FOLLOWING REQUIREMENTS: - COMPOSED OF FIBERS CONSISTING OF LONG CHAIN COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS OF AT LEAST 85% BY WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES THAT ARE FORMED INTO A NETWORK SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER; - FREE OF ANY TREATMENT OR COATING WHICH MIGHT FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES AFTER INSTALLATION; - FREE OF ANY DEFECTS OR FLAWS THAT FREE OF ANY DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING PROPERTIES; AND, - HAVE A MINIMUM WIDTH OF 36-INCHES. HAVE A MINIMUM WIDTH OF 36-INCHES. 2. USE ONLY FABRIC APPEARING ON SC DOT'S QUALIFIED USE ONLY FABRIC APPEARING ON SC DOT'S QUALIFIED PRODUCTS LISTING (QPL), APPROVAL SHEET #34, MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE SC DOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. 3. 12-INCHES OF THE FABRIC SHOULD BE PLACED 12-INCHES OF THE FABRIC SHOULD BE PLACED WITHIN EXCAVATED TRENCH AND TOED IN WHEN THE TRENCH IS BACKFILLED. 4. FILTER FABRIC SHALL BE PURCHASED IN CONTINUOUS FILTER FABRIC SHALL BE PURCHASED IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. 5. FILTER FABRIC SHALL BE INSTALLED AT A MINIMUM FILTER FABRIC SHALL BE INSTALLED AT A MINIMUM OF 24-INCHES ABOVE THE GROUND.

INSPECTION AND MAINTENANCE: THE KEY TO FUNCTIONAL SILT FENCE IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. REGULAR INSPECTIONS OF SILT FENCE SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVEN THAT PRODUCES 1/2-INCH OR MORE OF PRECIPITATION. ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE SILT FENCE IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE SILT FENCE. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. CHECK FOR AREAS WHERE STORMWATER RUNOFF HAS ERODED A CHANNEL BENEATH THE SILT FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED DUE TO RUNOFF OVERTOPPING THE SILT FENCE. INSTALL CHECKS/TIE-BACKS AND/OR REINSTALL SILT FENCE, AS NECESSARY. CHECK FOR TEARS WITHIN THE SILT FENCE, AREAS WHERE SILT FENCE HAS BEGUN TO DECOMPOSE, AND FOR ANY OTHER CIRCUMSTANCE THAT MAY RENDER THE SILT FENCE INEFFECTIVE. REMOVED DAMAGED SILT FENCE AND REINSTALL NEW SILT FENCE IMMEDIATELY. SILT FENCE SHOULD BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED AND ONCE IT IS REMOVED, THE RESULTING DISTURBED AREA SHALL BE PERMANENTLY STABILIZED.

HEAVY DUTY PLASTIC TIE FOR STEEL POSTS (RESTRICT TO TOP 8" OF FABRIC)

BURY FABRIC

USE EITHER FLAT-BOTTOM OR V-BOTTOM TRENCH SHOWN BELOW

BACKFILL TRENCH WITH COMPACTED EARTH

FILTER FABRIC

1.25 LBS. PRE LINEAR FOOT STEEL POSTS

HEAVY DUTY PLASTIC TIES

COMPACTED EARTH

HEAVY DUTY PLASTIC TIES

COMPACTED EARTH

BURY FABRIC AT LEAST 12"

v i s e a i

C722

EROSION CONTROL NOTES

DEWATERING NOTES: 1. THE DESIGN, ADEQUACY AND OPERATION OF ANY AND ALL DEWATERING ACTIVITIES IS THE SOLE THE DESIGN, ADEQUACY AND OPERATION OF ANY AND ALL DEWATERING ACTIVITIES IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 2. THE CONTRACTOR SHALL PROTECT ALL ADJACENT PROPERTIES, RIGHTS OF WAYS, NATURAL THE CONTRACTOR SHALL PROTECT ALL ADJACENT PROPERTIES, RIGHTS OF WAYS, NATURAL AREAS AND EXISTING UTILITY SYSTEMS FROM EROSION AND SEDIMENTATION ASSOCIATED WITH DEWATERING ACTIVITIES. 3. DEWATERING OF EXISTING PONDS OR LARGE PONDING AREAS SHALL ALWAYS UTILIZE A FLOATING DEWATERING OF EXISTING PONDS OR LARGE PONDING AREAS SHALL ALWAYS UTILIZE A FLOATING INTAKE. 4. DEWATERING DISCHARGES SHALL ALWAYS BE DIRECTED THROUGH SUITABLE BEST MANAGEMENT DEWATERING DISCHARGES SHALL ALWAYS BE DIRECTED THROUGH SUITABLE BEST MANAGEMENT PRACTICE (BMP) SUCH AS A TEMPORARY SEDIMENT POND/TRAP OR SEDIMENT TRAPPING DEWATERING BAG. 5. ALL DEWATERING ACTIVITIES SHOULD BE IN ACCORDANCE WITH THE SCDHEC CGP.ALL DEWATERING ACTIVITIES SHOULD BE IN ACCORDANCE WITH THE SCDHEC CGP.

SCDHEC STANDARD NOTES: 1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. - WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. - WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. 4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG. 72-300 ET SEQ. AND SCR100000. 8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN’T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 11. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 13. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: - WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; - WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; - FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND - SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. 18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. 19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE.

SCDHEC POST-CONSTRUCTION MAINTENANCE REQUIREMENTS

SYSTEM

MAINTENANCE REQUIREMENTS

MAINTENANCE FREQUENCY

A. VEGETATED AREAS

1. MOW GRASS MOW GRASS 2. REMOVE ALL LITTER AND DEBRIS REMOVE ALL LITTER AND DEBRIS 3. REMOVE AND REPLACE DEAD OR REMOVE AND REPLACE DEAD OR DISEASED VEGETATION 4. REPLACE / REPLENISH MULCH REPLACE / REPLENISH MULCH 5. REMOVE WEEDS REMOVE WEEDS 6. PRUNE VEGETATION TO MAINTAIN PRUNE VEGETATION TO MAINTAIN APPEARANCE

1. MONTHLY MONTHLY 2. MONTHLY MONTHLY 3. SEMI-ANNUALLY SEMI-ANNUALLY 4. SEMI-ANNUALLY SEMI-ANNUALLY 5. SEMI-ANNUALLY SEMI-ANNUALLY 6. SEMI-ANNUALLYSEMI-ANNUALLY

B. STORM DRAINAGE SYSTEM

1. REMOVE ALL LITTER AND DEBRIS REMOVE ALL LITTER AND DEBRIS FROM PIPES 2. REMOVE SEDIMENT FROM DRAINAGE REMOVE SEDIMENT FROM DRAINAGE STRUCTURE SUMPS

1. ANNUALLY ANNUALLY 2. ANNUALLY, OR WHEN ANNUALLY, OR WHEN SUMP VOLUME HAS BEEN REDUCED BY 50%

D. DRY DETENTION PONDS

1. REMOVE ALL LITTER AND DEBRIS THAT REMOVE ALL LITTER AND DEBRIS THAT MAY POLLUTE POND 2. INSPECT POND CONTROL, INLET AND INSPECT POND CONTROL, INLET AND OUTLET STRUCTURES 3. MOW SIDE SLOPES AND BOTTOM MOW SIDE SLOPES AND BOTTOM 4. REMOVE INVASIVE VEGETATION REMOVE INVASIVE VEGETATION 5. REPAIR EMBANKMENT AND SIDE SLOPESREPAIR EMBANKMENT AND SIDE SLOPES

1. MONTHLY MONTHLY 2. ANNUALLY ANNUALLY 3. MONTHLY MONTHLY 4. SEMI-ANNUALLY SEMI-ANNUALLY 5. ANNUALLYANNUALLY

C. WET DETENTION PONDS

1. REMOVE ALL LITTER AND DEBRIS FROM REMOVE ALL LITTER AND DEBRIS FROM POND 2. MOW STEEP SLOPES MOW STEEP SLOPES 3. REMOVE INVASIVE VEGETATION REMOVE INVASIVE VEGETATION 4. INSPECT POND CONTROL, INLET AND INSPECT POND CONTROL, INLET AND OUTLET STRUCTURES 5. REPAIR EMBANKMENT AND SIDE SLOPES REPAIR EMBANKMENT AND SIDE SLOPES 6. REMOVE SEDIMENT FROM FOREBAY REMOVE SEDIMENT FROM FOREBAY 7. REMOVE SEDIMENT FROM PERMANENT REMOVE SEDIMENT FROM PERMANENT POOL

1. MONTHLY MONTHLY 2. MONTHLY MONTHLY 3. SEMI-ANNUALY SEMI-ANNUALY 4. ANNUALLY ANNUALLY 5. ANNUALLY ANNUALLY 6. ANNUALLY, OR AFTER 50% OF ANNUALLY, OR AFTER 50% OF FOREBAY CAPACITY IS FILLED 7. EVERY 5 TO 10 YEARS OR EVERY 5 TO 10 YEARS OR AFTER 25% OF THE PERMANENT POOL VOLUME IS FILLED

E. UNDERGROUND DETENTION

1. REMOVE LITTER/DEBRIS AND SEDIMENT REMOVE LITTER/DEBRIS AND SEDIMENT BUILDUP IN SYSTEM BY PUMPING THEM OUT

1. ANNUALLYANNUALLY

F. INFILTRATION BASIN

1. REPLACE TOP FILTER MEDIA (SAND OR REPLACE TOP FILTER MEDIA (SAND OR ROCK) 2. REMOVE ALL LITTER AND DEBRIS THAT REMOVE ALL LITTER AND DEBRIS THAT MAY POLLUTE EXFILTRATION TRENCH 3. INSPECT BASIN CONTROL, INLET AND INSPECT BASIN CONTROL, INLET AND OUTLET STRUCTURES 4. MOW SIDE SLOPES MOW SIDE SLOPES 5. REMOVE INVASIVE VEGETATION REMOVE INVASIVE VEGETATION 6. REPAIR EMBANKMENT AND SIDE SLOPESREPAIR EMBANKMENT AND SIDE SLOPES

1. EVERY 5 YEARS, OR WHEN EVERY 5 YEARS, OR WHEN WATER IS STANDING FOR MORE THAN 5 DAYS AFTER A STORM EVENT 2. ANNUALLY ANNUALLY 3. ANNUALLY ANNUALLY 4. MONTHLY MONTHLY 5. SEMI-ANNUALLY SEMI-ANNUALLY 6. ANNUALLYANNUALLY

G. EXFILTRATION TRENCHES

1. REMOVE LITTER/DEBRIS FROM SYSTEM REMOVE LITTER/DEBRIS FROM SYSTEM 2. CHECK SYSTEM AFTER THREE CHECK SYSTEM AFTER THREE CONSECUTIVE DAYS OF DRY WEATHER AFTER A RAINFALL EVENT TO ENSURE FULL DEWATERING. PUMP OUT ACCUMULATED DEBRIS AND SEDIMENT, AS NEEDED, TO ENSURE PROPER DRAINAGE

1. MONTHLY MONTHLY 2. SEMI-ANNUALLYSEMI-ANNUALLY

H. BIO-RETENTION AREA

1. PRUNE VEGETATION TO MAINTAIN PRUNE VEGETATION TO MAINTAIN APPEARANCE 2. REMOVE WEEDS REMOVE WEEDS 3. REPLACE/REPLENISH MULCH REPLACE/REPLENISH MULCH 4. REMOVE LITTER AND DEBRIS THAT MAY REMOVE LITTER AND DEBRIS THAT MAY POLLUTE BIO-RETENTION AREA 5. REPAIR ERODED AREAS REPAIR ERODED AREAS 6. REMOVE AND REPLACE DEAD OR REMOVE AND REPLACE DEAD OR DISEASED VEGETATION

1. SEMI-ANNUALLY SEMI-ANNUALLY 2. SEMI-ANNUALLY SEMI-ANNUALLY 3. ANNUALLY ANNUALLY 4. SEMI-ANNUALLY SEMI-ANNUALLY 5. SEMI-ANNUALLY SEMI-ANNUALLY 6. SEMI-ANNUALLYSEMI-ANNUALLY

I. SAND FILTERS

1. REMOVE ALL LITTER AND DEBRIS REMOVE ALL LITTER AND DEBRIS 2. REPLACE SAND FILTER MEDIAREPLACE SAND FILTER MEDIA

1. MONTHLY MONTHLY 2. EVERY 10 YEARS, OR WHEN EVERY 10 YEARS, OR WHEN WATER IS STANDING FOR MORE THAN 24 HOURS AFTER A STORM EVENT

J. GRASS LINED DITCHES AND SWALES

1. MOW SWALE SLOPES MOW SWALE SLOPES 2. REMOVE ALL LITTER AND DEBRIS REMOVE ALL LITTER AND DEBRIS 3. REPAIR SIDE SLOPES REPAIR SIDE SLOPES 4. REMOVE SEDIMENT BUILDUP WITHIN REMOVE SEDIMENT BUILDUP WITHIN BOTTOM OF SWALE

1. MONTHLY MONTHLY 2. MONTHLY MONTHLY 3. ANNUALLY ANNUALLY 4. ANNUALLY, OR WHEN ANNUALLY, OR WHEN SWALE VOLUME HAS BEEN REDUCED BY 25%

K. PRE-FABRICATED WATER QUALITY DEVICES

1. REMOVE ALL LITTER AND DEBRIS REMOVE ALL LITTER AND DEBRIS 2. PERFORM MAINTENANCE SPECIFIED BY PERFORM MAINTENANCE SPECIFIED BY THE MANUFACTURER

1. MONTHLY MONTHLY 2. ANNUALLY, OR SOONER IF ANNUALLY, OR SOONER IF RECOMMENDED BY THE MANUFACTURER

L. ENERGY DISSIPATERS

1. REMOVE ALL LITTER AND REMOVE ALL LITTER AND DEBRIS 2. REPAIR EROSION OR DAMAGED REPAIR EROSION OR DAMAGED DISSIPATERS

1. MONTHLY MONTHLY 2. ANNUALLYANNUALLY

M. VEGETATED FILTER STRIPS

1. MOW GRASS MOW GRASS 2. REMOVE ALL LITTER AND DEBRIS REMOVE ALL LITTER AND DEBRIS 3. REPAIR EROSION AND RILLS REPAIR EROSION AND RILLS 4. REPAIR SPARSE VEGETATIONREPAIR SPARSE VEGETATION

1. MONTHLY MONTHLY 2. MONTHLY MONTHLY 3. ANNUALLY ANNUALLY 4. ANNUALLYANNUALLY

N. PERVIOUS PAVEMENT

1. REMOVE ALL LITTER AND DEBRIS REMOVE ALL LITTER AND DEBRIS 2. VERIFY PAVEMENT IS DRAINING PROPERLY VERIFY PAVEMENT IS DRAINING PROPERLY 3. VACUUM AND PERFORM HIGH PRESSURE VACUUM AND PERFORM HIGH PRESSURE HOSING TO FREE PORES FROM CLOGGING

1. MONTHLY MONTHLY 2. ANNUALLY ANNUALLY 3. ANNUALLYANNUALLY

A200

APPROXIMATE AREA

FOR CRANE SETUP, TYP.

SKIPJACK HALL

BLDG. 2406

TRIDENT HALL

BLDG. 2405

SEAWOLF HALL

BLDG. 2404

NIMITZ HALL

BLDG. 2403

ENTERPRISE HALL

BLDG. 2407

BLDG. 2408

BLDG. 16

5 PARKING SPACES WITH

ORANGE SAFETY FENCE

SI SI

CONCRETE SLAB WITH

PICINIC TABLES

CONCRETE SLAB WITH

PICINIC TABLES

SITE LEGEND

STORMWATER INLET

APPROXIMATE CRANE SETUP AREA

PROJECT TRAILER AND LAYOUT AREA

A/E SEALCOA SEAL

v i s e a i

G N

B

T

W N

B

T

K

B

T

P R O V

T

E W

BAIR AS

I N62 8T H

I N T

B A S E

C H A R L E S T

OFSHEET

ANSI D (22"x34")DRAWING SIZE:

R

J O I N T

B A S E

C H A R L E S T

A W I N G

R E V I S I O

V

S C R I P T I

E P

P R

K G V

R E P A I R

H V A C

D O

D G

T R I D E N T

H A

DKGV 13-2156

C H I T E C T U R A L

S I T E

P L

AS100

PROJ. TRUE

0 120 180 24060

GRAPHIC SCALE

GENERAL SITE NOTES

1 CONTRACTOR SHALL COORDINATE CRANE ACCESS AND

LOCATION WITH GOVT. FOR INSTALLATION OF MECH.

EQUIPMENT TO ATTIC SPACE.

2 CONTRACTOR SHALL PHOTOGRAPHICALLY DOCUMENT SITE

CONDITIONS PRIOR TO START OF CONSTRUCTION. SEE SPEC.

SECTION 01 57 50.

3 CRANE MATTING SHALL BE UTILIZED FOR CRANE ACCESS AND

SET UP ON ALL NON-PAVED SURFACES.

4 CONTRACTOR SHALL MAKE REPAIRS TO SITE DAMAGED BY

THE WORK OF THE PROJECT. THIS INCLUDES SODDING

DAMAGED GRASS AREA, REPLACING DAMAGED PLANTS,

SHRUBS & TREES, REPLACING DAMAGED WALKWAYS AND

CONCRETE SIDEWALKS, ETC.

5 COORDINATE WITH GOVT. FOR ANY ROAD AND PATH

CLOSURES REQUIRED FOR CRANE ACCESS.

SCALE: 1" = 60'-0"

A200 AS100

1 ARCHITECTURAL SITE PLAN

SIM

A200A200

SIM

A200A200

5'-8"

4'-3"

FIRST FLOOR

0"

ROOF

30'-0"

SECOND FLOOR

10'-0"

THIRD FLOOR

20'-0"

8"

12"

FIRST FLOOR

0"

ROOF

30'-0"

SECOND FLOOR

10'-0"

QRS

THIRD FLOOR

20'-0"

8"

12" v i s e a i

G N

B

T

W N

B

T

K

B

T

P R O V

T

I N T

B A S E

C H A R L E S T

R

J O I N T

B A S E

C H A R L E S T

A W I N G

R E V I S I O

S C R I P T I

E P

P R

G V

R E P A I R

H V A C

D O

D G

T R I D E N T

H A

E V A T I O N S

A N D

D E T A I

SCALE: 3" = 1'-0"

A200 A200

4 DETAIL SECTION @ LOUVER SILL

SCALE: 3" = 1'-0"

5 DETAIL SECTION @ LOUVER HEAD

SCALE: 1/4" = 1'-0"

3 ENLARGED ELEVATION @ END / SIDE LOUVER

E E EE

EXIST. MTL. ROOFING

EXIST. PT 2X FASCIA

EXIST. MTL. GABLE FLASHING

EXIST. METAL FLASHING

EXIST. PT 2X FRAME

NEW LOUVER TO MATCH

EXISTING

NEW BACKER ROD AND

SEALANT AROUND ENTIRE

PERIMETER

EXIST.

NEW BACKER ROD AND

SEALANT AROUND

ENTIRE PERIMETER

NEW LOUVER TO

MATCH EXISTING

P.T. 2X WOOD BLOCKING

NEW METAL PAN FLASHING

SET IN BED OF SEALANT

W/ END DAMS AT JAMBS AND

BACK DAM

NEW METAL INSULATED

BLOCK OFF PANEL ON

BACKSIDE OF ENTIRE

LOUVER

NEW METAL INSULATED BLOCK

OFF PANEL ON BACKSIDE OF

ENTIRE LOUVER

REMOVE EXIST. LOUVER AND SEALANT FOR

INSTALLATION OF NEW MECH. EQUIP. TEMP.

WEATHER PROOF AT END OF DAY. INSTALL

NEW LOUVER TO MATCH EXIST. IMMEDIATELY

AFTER MECH. EQUIP. IS IN THE BLDG.

DASHED LINES SHOW MAX MECHANICAL

EQUIPMENT SIZES.

NEW SEALANT AT

TOP OF BACK DAM

NEW SEALANT AROUND

ENTIRE PERIMETER

EXIST METAL CLOSURE

SCALE: 1/8" = 1'-0"

AS100 A200

1 SIDE DORMER ELEVATION

SCALE: 1/8" = 1'-0"

AS100 A200

2 END DORMER ELEVATION

ELEVATION & DETAIL NOTES

1 ALL DIMENSIONS ARE (+/-); CONTRACTOR SHALL VERIFY ALL

DIMENSIONS IN THE FIELD

2 EQUIPMENT SIZE 65" W x 55" H OR 82" W x 48" H; REFER TO

MECHANICAL DRAWINGS

3 COORDINATE LOUVER HEAD / SILL DETAILS WITH DETAILS 1 &

2 ON SHEET W301

NOTE: REFER TO 1 & 2 / A201 FOR PHOTOS

NOTE: REFER TO 3 & 4 / A201 FOR PHOTOS

SEE 2/A200 FOR ELEVATION

REMOVE EXIST. LOUVER FOR INSTALLATION OF NEW

MECH. EQUIP. TEMP. WEATHER PROOF AT END OF

DAY. INSTALL NEW LOUVER TO MATCH EXIST.

IMMEDIATELY AFTER MECH. EQUIP. IS IN THE BLDG.

SEE 3/A200 FOR ELEVATION

SEE 1/A200 FOR ELEVATION

REMOVE EXIST. LOUVER FOR INSTALLATION OF NEW

MECH. EQUIP. TEMP. WEATHER PROOF AT END OF

DAY. INSTALL NEW LOUVER TO MATCH EXIST.

IMMEDIATELY AFTER MECH. EQUIP. IS IN THE BLDG.

SEE 3/A200 FOR ELEVATION

G N

B

T

W N

B

T

K

B

T

P R O V

T

I N T

B A S E

C H A R L E S T

R

J O I N T

B A S E

C H A R L E S T

A W I N G

R E V I S I O

S C R I P T I

E P

P R

G V

R E P A I R

H V A C

D O

D G

T R I D E N T

H A

T E R I O R

E L E V A T I O N

P H O T

A201

SCALE: 1/16" = 1'-0"

1 END DORMER ELEVATION PHOTO

SCALE: 1" = 20'-0"

2 END DORMER LOUVER ELEVATION PHOTO

ELEVATION & DETAIL NOTES

1 ALL DIMENSIONS ARE (+/-); CONTRACTOR SHALL VERIFY ALL

DIMENSIONS IN THE FIELD

2 EQUIPMENT SIZE 65" W x 55" H OR 82" W x 48" H; REFER TO

MECHANICAL DRAWINGS

3 COORDINATE LOUVER HEAD / SILL DETAILS WITH DETAILS 1 &

2 ON SHEET W301

3 SIDE DORMER ELEVATION PHOTO

4 SIDE DORMER LOUVER ELEVATION PHOTO

GENERAL ELECTRICAL NOTES

1. BRANCH CIRCUIT WIRING FOR 20A CIRCUITS SHALL BE SIZED PER WIRE SIZING CHART. WHERE CONDUCTOR AND RACEWAY SIZE ARE

SHOWN AT HOMERUN, SUCH SIZE SHALL BE USED FOR THE ENTIRE CIRCUIT. EXCEPTION: FINAL CONNECTION TO DEVICES IN OUTLET

BOXES IS NOT REQUIRED TO BE LARGER THAN #12.

2. OUTLET BOXES FOR SWITCHES, RECEPTACLES, ETC. MOUNTED ON OPPOSITE SIDES OF PARTITIONS SHALL NOT BE MOUNTED IN THE

SAME WALL CAVITY. SEPARATE WALL PENETRATIONS BY MOUNTING ON OPPOSITE SIDES OF WALL STUDS OR OTHER VERTICAL

STRUCTURAL MEMBERS IN THE WALL.

3. RACEWAYS SHALL BE INSTALLED CONCEALED IN NEW WALL CONSTRUCTION, ABOVE CEILINGS, BELOW FLOOR AND IN OTHER CAVITIES

TO THE GREATEST EXTENT POSSIBLE. EXPOSED RACEWAYS MAY BE USED IN UNFINISHED SPACES, WHERE EXPLICITLY NOTED ON PLANS

AND WHERE APPROVED BY THE GOVERNMENT. LAY OUT EXPOSED RACEWAYS TO MINIMIZE THE NUMBER OF VERTICAL RUNS.

4. ATTIC WALLS AND FLOOR ARE EXISTING FIRE RATED PARTITIONS. A FIRESTOP SYSTEM SHALL BE USED TO SEAL ANY NEW PENETRATIONS

OF ELECTRICAL CONDUITS AND CABLES THROUGH FIRE-RATED PARTITIONS. THE FIRESTOP SYSTEM SHALL CONSIST OF A FIRE-RATED

CAULK TYPE SUBSTANCE AND HIGH TEMPERATURE FIBER INSULATION BY STI OR APPROVED EQUAL. ONLY METAL CONDUIT SHALL BE

USED TO PENETRATE FIRE-RATED PARTITIONS.

5. THE USE OF MC CABLE IS NOT ALLOWED.

6. WHEREVER THE WORD "PROVIDE" IS USED ON THE ELECTRICAL DRAWINGS, IT SHALL BE INFERRED TO MEAN "FURNISH AND INSTALL", UNLESS NOTED OTHERWISE.

7. OUTLET BOXES FOR FIRE ALARM AND GFCI DEVICES SHALL BE DEEP BOXES (2-1/8" MINIMUM). ALL OTHER OUTLET BOXES SHALL BE

STANDARD DEPTH (1-1/2" MINIMUM), UNLESS NOTED OTHERWISE.

8. THE ARRANGEMENT, GROUPING, AND ROUTING OF BRANCH CIRCUITS SHALL BE PROVIDED AT THE CONTRACTOR'S DISCRETION IN

ACCORDANCE WITH GENERALLY ACCEPTED PRACTICE FOR ELECTRICAL WORK, THE NATIONAL ELECTRICAL CODE REQUIREMENTS, LOCAL ORDINANCES, AND THE FOLLOWING: 1 - A COMMON NEUTRAL MAY BE INSTALLED IN A HOMERUN FOR 2 OR 3 BRANCH CIRCUITS

ONLY IF A MEANS TO SIMULTANEOUSLY DISCONNECT ALL UNGROUNDED CONDUCTORS AT THE POINT OF ORIGIN IS PROVIDED PER NEC

210.4.B. 2 - MULTIPLE SINGLE-POLE BRANCH CIRCUITS (UP TO 3 HOTS, 3 NEUTRALS AND 1 GROUND) RATED FOR 30A OR LESS MAY BE

PULLED INTO A SINGLE RACEWAY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SIZING THE RACEWAYS AND DE-RATING

CONDUCTORS PER NEC 310.15. 3 - A GROUND CONDUCTOR SHALL BE PROVIDED IN ALL RACEWAYS UNLESS NOTED OTHERWISE.

1. THE GOVERNMENT MAY CHOOSE TO RETAIN ANY ELECTRICAL EQUIPMENT TO BE REMOVED. MATERIALS THAT THE GOVERNMENT

CHOOSES TO RETAIN SHALL BE DELIVERED BY THE CONTRACTOR TO A LOCATION DESIGNATED BY THE GOVERNMENT. ALL OTHER

MATERIALS SHALL BE PROPERLY DISPOSED OF BY THE CONTRACTOR.

GENERAL DEMOLITION NOTES

1. AREAS OF WORK EXIST FOR THIS PROJECT WHICH WERE NOT ACCESSIBLE OR HAD LIMITED ACCESS DURING DESIGN. AS SUCH, CONTRACTOR SHALL VERIFY ALL UTILITIES IN AREA OF WORK BEFORE DEMOLITION OF ANY SERVICE. ANY ELECTRICAL COMPONENTS NOT

SHOWN SHALL BE IDENTIFIED AND THE GOVERNMENT SHALL BE NOTIFIED AS SOON AS POSSIBLE. NO ELECTRICAL REWORK SHALL BE

COMMENCED WITHOUT COORDINATION WITH THE GOVERNMENT. WHERE INFORMATION SHOWN ON THESE DRAWINGS CONFLICTS WITH

VERIFIED FIELD CONDITIONS, IT SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING A FIRESTOP SYSTEM IN ALL PENETRATIONS OF FIRE-RATED FLOORS AND

WALLS CREATED BY THE REMOVAL OF EXISTING ELECTRICAL CONDUIT OR CABLES, AS WELL AS THOSE CREATED BY NEWLY INSTALLED

CONDUITS AND SLEEVES.

3. WHERE INSTALLATION REQUIRES CUTTING OR DRILLING OF THE EXISTING FLOOR SLAB, THE CONTRACTOR SHALL X-RAY THE EXISTING

SLAB PRIOR TO WORK TO ENSURE THAT NO EXISTING UTILITIES OR STRUCTURAL ELEMENTS IN THE SLAB WILL BE COMPROMISED BY THE

WORK. NOTIFY THE GOVERNMENT OF ANY CONFLICTS THAT WILL REQUIRE RELOCATING THE PROPOSED SLAB WORK. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGED UTILITIES OR STRUCTURAL ELEMENTS CAUSED BY THE SLAB DEMOLITION.

GENERAL EXISTING CONDITION NOTES

COMPONENT IMPORTANCE FACTOR (Ip)

COMPONENT

IDENTIFICATION

SEISMIC RESTRAINT

REQUIREMENT

NOTES SEISMIC RESTRAINT REQUIREMENT

ROOF MOUNTED

RESTRAIN ALL

FLOOR MOUNTED

WALL MOUNTED

COMPONENT SUPPORTS

SINGLE CONDUIT

RESTRAIN IF > 2.5"

CABLE TRAY/BUS DUCT

TRAPEZED CONDUIT

COMPONENT CERTIFICATION

NOT REQUIRED

REQUIRED

1.0 1.5

NOTES

NOTES:

1. EQUIPMENT 20 LBS. OR LESS IS EXEMPT IF THE COMPONENT IS POSITIVELY ATTACHED TO THE STRUCTURE AND FLEXIBLE CONNECTIONS

ARE PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING AND CONDUIT.

RESTRAINTS ARE NOT REQUIRED IF THE COMPONENT WEIGHS 400 LBS. OR LESS, IS MOUNTED WITH THE CENTER MASS AT 4' OR LESS

ABOVE A FLOOR, IS POSITIVELY ATTACHED TO THE STRUCTURE, AND HAS FLEXIBLE CONNECTIONS BETWEEN THE COMPONENT AND

ASSOCIATED DUCTWORK, PIPING AND CONDUIT.

RESTRAINT IS NOT REQUIRED IF THE CONDUIT IS SUPPORTED BY HANGERS AND EACH HANGER IN THE RUN IS 12" IN. OR LESS IN LENGTH

FROM THE TOP OF THE PIPE TO THE SUPPORTING STRUCTURE. WHERE PIPES ARE SUPPORTED ON A TRAPEZE, THE TRAPEZE SHALL BE

SUPPORTED BY HANGERS HAVING A LENGTH OF 12" IN. OR LESS. WHERE ROD HANGERS ARE USED, THEY SHALL BE EQUIPPED WITH

SWIVELS, EYE NUTS OR OTHER DEVICES TO PREVENT BENDING IN THE ROD.

THE RESTRAINT OF PENDANT, LAY-IN AND CAN LIGHTS IS ADDRESSED IN ASTM C636 AND E580.

COMPONENT CERTIFICATION MUST BE SUPPLIED BY THE EQUIPMENT MANUFACTURER AT TIME OF SUBMITTAL FOR REVIEW BY ENGINEER

OF RECORD.

2.

3.

4.

5.

SUSPENDED EQUIPMENT

PENDANT, LAY-IN AND

CAN LIGHTS

REQUIRED REQUIRED

PER IBC-2015/ASCE 7-10

ELECTRICAL SYSTEMS

SEISMIC REQUIREMENTS

ALL ASSOCIATED ELECTRICAL WORK UNLESS NOTED OTHERWISE

A.

B.

C.

D.

E.

F.

DO NOT DELETE ON TRAPEZE

> 2.5". RESTRAIN IF TOTAL

WEIGHT OF SUSPENDED

COMPONENT > 10 LBS/FT

1,2

1,2

ELECTRICAL COMPONENT IMPORTANCE FACTOR (Ip) DESIGNATION

Ip = 1.0 Ip = 1.5

SEISMIC DESIGN…