Amendment 02 FA441821R00020002 SF 30.pdf

PDF 504 KB Posted

Attached to
Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston -Weapons Station, Goose Creek, South Carolina
Solicitation number
FA441820R0016
Issued by

About this file

This document includes an amendment to a solicitation for repair work on HVAC systems at dormitory buildings 2405 and 2406 at Joint Base Charleston in South Carolina. The amendment extends the proposal due date from November 5, 2020 to November 19, 2020 at 3:00 PM EST. It adds several attachments providing additional details on the work sites, submitted questions and answers, and sign-in sheets from a pre-bid site visit. The repair work involves exterior wall repairs and sealant replacements, metal roof repairs and equipment replacements, and replacing air handling and HVAC equipment in the attic spaces of each building wing. The Department of the Air Force Air Mobility Command is the issuing agency for this solicitation.

View the file

Other files

File Type Posted
Attachment 17 - Questions and Answers 20R0010_21R0002 Amendment 6 Fire Protection 20201203.pdf PDF
Amendment 06 - FA441821R00020006.pdf PDF
Attachment 16 - W401-W404 Elevations FA441820R0010_21R0002 20201203.pdf PDF
Amendment 05 FA441821R00020005 SF 30.pdf PDF
Attachment 15 - BEQ SITE VISIT SIGN IN SHEET 18.Nov.20.pdf PDF
Amendment 04 - FA441821R00020004 SF 30 111920.pdf PDF
Attachment 14 - B2405_2406 DoD SAFE Memo.pdf PDF
Attachment 11 - New JBC Section 28 31 76 FINAL 2405 2406 Oct 2020.pdf PDF
Attachment 12 - Joint Base Charleston - Barracks Building 2408 - Rev-02 - 10-28-2020.pdf PDF
Attachment 10 - Addendum 1 2020-11-10.pdf PDF
Amendment 03 to FA441821R00020003 20201110.pdf PDF
Attachment 13 - New Section 09 29 00 gypsum board.pdf PDF
Attachment 5 - AF 66-Revised Submittal Register.xlsx XLSX spreadsheet
Amendment 02 FA441821R00020002 SF 30.pdf PDF
Attachment 3 - Green Procurement Form.pdf PDF
Attachment 4 - HVAC Plans duct dimensions.pdf PDF
Attachment 7 - Attic Sprinkler Iso Vlv Loc.pdf PDF
Attachment 8 - SIGN-IN SHEET for 20200924 (filled in).pdf PDF
Attachment 9 - Pre-Bid Questions for B2405 B2406 - November 3 2020 11022020.pdf PDF
Amendment 01 - FA441821R00020001 SF 30.pdf PDF
Attachment 5 - Submittal Register.pdf PDF
Attachment 3 - Performance Time-B2405-2406.pdf PDF
FA441820R0016 20200914 Solicitation.pdf PDF
Attachment 4 - Green Procurement Form.pdf PDF
Attachment 6 - WD Berkeley County 14 Aug 2020.pdf PDF
Attachment 1 - Drawings for B2405 and B2406.pdf PDF
Attachment 2 - SPECS Final 2020 06 15.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section J - List of Attachments

The following attachments were added:

Combined Questions - B2405 B2406 - November 3 2020 11022020 Attachment 7 - Attic Sprinkler Iso Vlv Loc SIGN-IN SHEET for 20200924 (filled in)

Miscellaneous text in this section has been modified to:

Attachment 1- Drawings // Date: 17 June 20 // Pages:

Attachment 2 - Specifications // Date: 17 June 20 // Pages 411 Attachment 3 - Performance Time Tabulation Form // Date: 21 May 20 // Pages: 1 Attachment 4 - Green Procurement // Date: 17 June 20 // Pages: 3 Attachment 5 - AF Form 66 ( Schedule of Material Submittals) // Date: 17 June 20 // Pages: 19 Attachment 6 - Wage Determination SC20190023 // Date: 3 Jan 20 // Pages: 5 Attachment 7 - Attic Sprinkler Iso Vlv Loc PDF // Date: 3 Nov 20 // Pages: 16 Attachment 8 - Sign-In Sheet from 24 Sep 2020 Site Visit // Date: 3 Nov 20 // Page: 1 Attachment 9 - Pre-Bid Questions for B.2405 and 2406 // Date: 3 Nov 20 // Pages: 10

(End Of Section J)

FA441821R00020002

IDCode:
Page: 1
Pages: 2
AmendNo: 0002
EffDate: 11/3/2020
ReqNo: A007719
ProjNo: DKGV 1073189
IssCode: FA4418
AdmCode:
IssuedBy: FA4418 628 CONS LGC

101 E HILL BLVD

CP 843 963 5155

CHARLESTON AFB, SC 29404-5021

United States Byron Faison, Telephone: (843) 963-5167 Email: byron.faison@us.af.mil

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA441821R0002
SolDate: 10/16/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: Off
Require: 1
Copies: 1
Descript: The purpose of this Amendment is to:

1. Add attachment 7 - Attic Sprinkler Iso Vlv Loc.pdf

2. Add attachment 8 - Sign-In sheet from 24 Sep 2020 Site Visit.

3. Add attachment 9 - Answers to submitted questions

4. Extend the proposal due date from 5 November 2020 at 3:00 PM EST to 19 November 2020 at 3:00 PM EST.

ContNameTitle:
CoNameTitle: Robert Melton

Email: robert.melton.6@us.af.mil Telephone: 673-5173

ContDate:
CODate:

File details come from the government source that posted it. Updated .