This addendum provides additional scope and specifications for a federal contract solicitation to repair HVAC systems at dormitory buildings 2405 and 2406 at Joint Base Charleston in South Carolina. The work includes a complete fire alarm and mass notification system replacement, with new equipment, materials, installation, inspection and testing. Plans and specifications are provided for the fire alarm design, HVAC plans, attic sprinkler isolation valves, and gypsum board. The revised submittal register is also included.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
CONTRACT NUMBER FA4418-21-R-0002
PROJECT DKGV 18-1073189
REPAIR HVAC, DORMITORY, B2405 & B2406 (NNPTC)
JOINT BASE CHARLESTON, SC
10 November 2020
1. Add: Complete Fire Alarm Replacement to Project
Scope of Work:
This work includes designing and providing a new, complete, fire alarm and mass notification (MNS) system with radio transceiver as described herein and on the contract drawings for buildings 2405 and 2406 on Joint Base Charleston Naval Weapons Station Goose Creek, South Carolina. The system shall provide “point reporting” to the Monaco D-21 Central Receiving station. Include system programming, wiring, raceways, pull boxes, terminal cabinets, outlet and mounting boxes, control equipment, initiating devices, notification appliances, supervising station, fire alarm transmitters/mass notification transceiver, and other accessories and miscellaneous items required for a complete operational system even though each item is not specifically mentioned or described. Provide systems complete and ready for operation. The new system shall be compatible with the existing Monaco D-21 Central Receiving Station without the use of interfacing relays and shall provide “point reporting”. There are gas-fired dryers as noted in room E102 in the as-built drawings in each building. Design and installation must comply with UFGS 25 05 11, UFC 4-010-06 and AFGM 2019-320-02. This work shall be coordinated with the HVAC work on each wing. Only one wing of one building will be worked on at any one time.
a. Provide equipment, materials, installation, workmanship, inspection, and testing in strict accordance with NFPA 72, except as modified herein. System design, layout, and coordination are the responsibility of the Contractor.
b. Each remote fire alarm control unit must be powered from a wiring riser specifically for that use or from a local power panel located on the same floor as the remote fire alarm control unit. Where remote fire control units are provided, equipment for notification appliances may be located in the remote fire alarm control units.
c. The fire alarm and mass notification system must be independent of the building security, building management, and energy/utility monitoring systems other than for control functions.
d. Provide demolition and disposal of any existing devices and all wiring for each wing under construction. Provide demolition and disposal of any exposed conduit system that are not re-utilized. The contractor shall be responsible for patching, priming and spot painting of any areas affected by demolition. The Government shall have first right of refusal of any salvage materials or components.
e. The Government shall provide a sample design from an adjacent building, 2408. The sample design may be referenced for the designs of buildings 2405 and 2406. The final designs of building 2405 and 2406 shall be unique to each building. The final designs of 2405 and 2406 shall be stamped by the QFPE as being applicable to this project.
2. Add: Specification Section 28 31 76, INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE (electronic file)
3. Add: Plans; Fire Alarm Design for Barracks Building 2408 (electronic file, 38 sheets)
4. Add: Plans; HVAC floor plans revisions to add existing duct dimensions (electronic file, 8 sheets)
5. Add: Plans; Attic Sprinkler Isolation Valve Locations (from As-builts) (electronic file, 16 sheets)
6. Add: Specification Section 09 29 00, GYPSUM BOARD (electronic file)
7. Add: Revised Submittal Register (electronic file)
- End -