PN 88658 SOF Operations Facility

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912PM20R0009
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Fayetteville Nc Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation requests proposals for the construction of a Special Operations Forces Operations Facility to be located at Fort Bragg, North Carolina. The Department of the Army Corps of Engineers Engineering District Wilmington seeks to award a firm-fixed-price contract for construction services including administrative areas, vehicle bays, storage facilities, workshops, and a Secure Compartmentalized Information Facility. Proposals will be evaluated based on experience, past performance, price, and small business participation, with the award determined by best value. Proposals are due by January 26, 2021.

There is no set-aside designation specified. The project involves construction valued around $43 million over a 540-day period of performance. Key requirements include building spaces for mission planning, climate controlled storage, fuel storage, arms vaults, individual unit storage, and supporting facilities such as utilities and site development. Interior design, security systems, audiovisual capabilities, and sustainable features must also be provided. Evaluation criteria cover the offeror's experience with similar facility construction exceeding $25.8 million within the past six years.

Notice text

6 versions

Update #6 · Latest ·

This Request for Proposal (RFP) solicits construction of SOF Operations Facility. The scope of work includes: construction of administrative, mission planning areas, vehicle bays, climate controlled pallet storage with lift, Petroleum, Oil and Lubricants storage, arms vaults, individual unit caged storage, engineering workshops, latrines with lockers, and laundry. Also includes space for a Secure Compartmentalized Information Facility with administrative area, 50-person classroom, operations center, and Special Access Programs. Project will also provide fire alarm/mass notification, fire suppression system, telephone and advanced unclassified and classified communications networks, intercom system, closed circuit surveillance and electronic access control systems, integrated commercial intrusion detection system, cable TV, a protected distribution system, and connection to the energy management control system. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction as appropriate.

Supporting facilities include site development, utilities and connections, lighting, lightning protection system, walks, curbs and gutters, vehicle parking, access road, bus access area, storm drainage, landscaping, fencing and other site improvements. Utility connections require long runs to the remote project site. Heating and air conditioning will be provided by self-contained systems. Measures in accordance with the DoD Minimum Antiterrorism for Buildings standards will be provided. Facilities will be designed to a minimum life of 40 years in accordance with applicable Unified Facilities Code criteria including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Electronic security systems and audio visual services are included. Cybersecurity measures will be incorporated into this project. Sustainability/Energy measures will be provided. Access for persons with disabilities will be provided.

Amendment 1: The purpose of this amendment is to incorporate clause by Full Text vice by reference.

Amendment 2: The purpose of this amendment is to provide a technical summary of changes and revised specifications.

Amendment 3: The purpose of this amendment is to provide revised the technical summary of changes and the revised specifications.

Amendment 4: The pupose of this amendment is to provide the revised technical summary of changes and the revised specification. Also, to extended the proposal due date.

Amendment 5: The pupose of this amendment is to provide the revised technical summary of changes and the revised specification.

Update #5 ·

This Request for Proposal (RFP) solicits construction of SOF Operations Facility. The scope of work includes: construction of administrative, mission planning areas, vehicle bays, climate controlled pallet storage with lift, Petroleum, Oil and Lubricants storage, arms vaults, individual unit caged storage, engineering workshops, latrines with lockers, and laundry. Also includes space for a Secure Compartmentalized Information Facility with administrative area, 50-person classroom, operations center, and Special Access Programs. Project will also provide fire alarm/mass notification, fire suppression system, telephone and advanced unclassified and classified communications networks, intercom system, closed circuit surveillance and electronic access control systems, integrated commercial intrusion detection system, cable TV, a protected distribution system, and connection to the energy management control system. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction as appropriate.

Supporting facilities include site development, utilities and connections, lighting, lightning protection system, walks, curbs and gutters, vehicle parking, access road, bus access area, storm drainage, landscaping, fencing and other site improvements. Utility connections require long runs to the remote project site. Heating and air conditioning will be provided by self-contained systems. Measures in accordance with the DoD Minimum Antiterrorism for Buildings standards will be provided. Facilities will be designed to a minimum life of 40 years in accordance with applicable Unified Facilities Code criteria including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Electronic security systems and audio visual services are included. Cybersecurity measures will be incorporated into this project. Sustainability/Energy measures will be provided. Access for persons with disabilities will be provided.

Amendment 1: The purpose of this amendment is to incorporate clause by Full Text vice by reference.

Amendment 2: The purpose of this amendment is to provide a technical summary of changes and revised specifications.

Amendment 3: The purpose of this amendment is to provide revised the technical summary of changes and the revised specifications.

Amendment 4: The pupose of this amendment is to provide the revised technical summary of changes and the revised specification. Also, to extended the proposal due date.

Update #4 ·

This Request for Proposal (RFP) solicits construction of SOF Operations Facility. The scope of work includes: construction of administrative, mission planning areas, vehicle bays, climate controlled pallet storage with lift, Petroleum, Oil and Lubricants storage, arms vaults, individual unit caged storage, engineering workshops, latrines with lockers, and laundry. Also includes space for a Secure Compartmentalized Information Facility with administrative area, 50-person classroom, operations center, and Special Access Programs. Project will also provide fire alarm/mass notification, fire suppression system, telephone and advanced unclassified and classified communications networks, intercom system, closed circuit surveillance and electronic access control systems, integrated commercial intrusion detection system, cable TV, a protected distribution system, and connection to the energy management control system. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction as appropriate.

Supporting facilities include site development, utilities and connections, lighting, lightning protection system, walks, curbs and gutters, vehicle parking, access road, bus access area, storm drainage, landscaping, fencing and other site improvements. Utility connections require long runs to the remote project site. Heating and air conditioning will be provided by self-contained systems. Measures in accordance with the DoD Minimum Antiterrorism for Buildings standards will be provided. Facilities will be designed to a minimum life of 40 years in accordance with applicable Unified Facilities Code criteria including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Electronic security systems and audio visual services are included. Cybersecurity measures will be incorporated into this project. Sustainability/Energy measures will be provided. Access for persons with disabilities will be provided.

Amendment 1: The purpose of this amendment is to incorporate clause by Full Text vice by reference.

Amendment 2: The purpose of this amendment is to provide a technical summary of changes and revised specifications.

Amendment 3: The purpose of this amendment is to provide revised the technical summary of changes and the revised specifications.

Update #3 ·

This Request for Proposal (RFP) solicits construction of SOF Operations Facility. The scope of work includes: construction of administrative, mission planning areas, vehicle bays, climate controlled pallet storage with lift, Petroleum, Oil and Lubricants storage, arms vaults, individual unit caged storage, engineering workshops, latrines with lockers, and laundry. Also includes space for a Secure Compartmentalized Information Facility with administrative area, 50-person classroom, operations center, and Special Access Programs. Project will also provide fire alarm/mass notification, fire suppression system, telephone and advanced unclassified and classified communications networks, intercom system, closed circuit surveillance and electronic access control systems, integrated commercial intrusion detection system, cable TV, a protected distribution system, and connection to the energy management control system. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction as appropriate.

Supporting facilities include site development, utilities and connections, lighting, lightning protection system, walks, curbs and gutters, vehicle parking, access road, bus access area, storm drainage, landscaping, fencing and other site improvements. Utility connections require long runs to the remote project site. Heating and air conditioning will be provided by self-contained systems. Measures in accordance with the DoD Minimum Antiterrorism for Buildings standards will be provided. Facilities will be designed to a minimum life of 40 years in accordance with applicable Unified Facilities Code criteria including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Electronic security systems and audio visual services are included. Cybersecurity measures will be incorporated into this project. Sustainability/Energy measures will be provided. Access for persons with disabilities will be provided.

Amendment 1: The purpose of this amendment is to incorporate clause by Full Text vice by reference.

Amendment 2: The purpose of this amendment is to provide a technical summary of changes and revised specifications.

Update #2 ·

This Request for Proposal (RFP) solicits construction of SOF Operations Facility. The scope of work includes: construction of administrative, mission planning areas, vehicle bays, climate controlled pallet storage with lift, Petroleum, Oil and Lubricants storage, arms vaults, individual unit caged storage, engineering workshops, latrines with lockers, and laundry. Also includes space for a Secure Compartmentalized Information Facility with administrative area, 50-person classroom, operations center, and Special Access Programs. Project will also provide fire alarm/mass notification, fire suppression system, telephone and advanced unclassified and classified communications networks, intercom system, closed circuit surveillance and electronic access control systems, integrated commercial intrusion detection system, cable TV, a protected distribution system, and connection to the energy management control system. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction as appropriate.

Supporting facilities include site development, utilities and connections, lighting, lightning protection system, walks, curbs and gutters, vehicle parking, access road, bus access area, storm drainage, landscaping, fencing and other site improvements. Utility connections require long runs to the remote project site. Heating and air conditioning will be provided by self-contained systems. Measures in accordance with the DoD Minimum Antiterrorism for Buildings standards will be provided. Facilities will be designed to a minimum life of 40 years in accordance with applicable Unified Facilities Code criteria including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Electronic security systems and audio visual services are included. Cybersecurity measures will be incorporated into this project. Sustainability/Energy measures will be provided. Access for persons with disabilities will be provided.

Amendment 1: The purpose of this amendment is to incorporate clause by Full Text vice by reference.

Update #1 ·

This Request for Proposal (RFP) solicits construction of SOF Operations Facility. The scope of work includes: construction of administrative, mission planning areas, vehicle bays, climate controlled pallet storage with lift, Petroleum, Oil and Lubricants storage, arms vaults, individual unit caged storage, engineering workshops, latrines with lockers, and laundry. Also includes space for a Secure Compartmentalized Information Facility with administrative area, 50-person classroom, operations center, and Special Access Programs. Project will also provide fire alarm/mass notification, fire suppression system, telephone and advanced unclassified and classified communications networks, intercom system, closed circuit surveillance and electronic access control systems, integrated commercial intrusion detection system, cable TV, a protected distribution system, and connection to the energy management control system. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction as appropriate.

Supporting facilities include site development, utilities and connections, lighting, lightning protection system, walks, curbs and gutters, vehicle parking, access road, bus access area, storm drainage, landscaping, fencing and other site improvements. Utility connections require long runs to the remote project site. Heating and air conditioning will be provided by self-contained systems. Measures in accordance with the DoD Minimum Antiterrorism for Buildings standards will be provided. Facilities will be designed to a minimum life of 40 years in accordance with applicable Unified Facilities Code criteria including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Electronic security systems and audio visual services are included. Cybersecurity measures will be incorporated into this project. Sustainability/Energy measures will be provided. Access for persons with disabilities will be provided.

Files

File Type Posted
W912PM20R0009-00005 Amendment.pdf PDF
AMDT0005_88658_Technical_Summary_Changes_Final_1.20.21.pdf PDF
W912PM20R0009-00005 Conformed Copy Amendment 5.pdf PDF
AMDT0005_PN88658-Specs VOL 2.pdf PDF
AMDT0005_PN88658-Specs VOL 1.pdf PDF
AMDT0005_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
Site Visit sign in Sheet 2 of 2 12092020.jpg JPG image
Site Visit sign in Sheet 1 of 212092020.jpg JPG image
AMDT0004_PN88658-Specs VOL 2.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
W912PM20R00090004_Conformed.docx.pdf PDF
W912PM20R00090004_Modification 4.docx.pdf PDF
AMDT0004_PN88658-Specs VOL 2.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
88658_AMD-0004-Conformed_Dwgs.pdf PDF
W912PM20R00090003_Modification 4.docx.pdf PDF
W912PM20R00090003_Conformed.docx.pdf PDF
AMDT0004_PN88658-Specs VOL 2.pdf PDF
88658_ADMT004_Summary-of-Changes_Final.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
AMDT0004_PN88658-Specs VOL 1.pdf PDF
AMDT0003_PN88658 - RTA Specs VOL 1 Cover Sheet - 9.21.2020 - Corrected Solicitation No.pdf PDF
AMDT0003_PN88658 - RTA Specs VOL 2 Cover Sheet - 9.21.2020 - Corrected Solicitation No.pdf PDF
AMDT0003_PN88658-Specs VOL 1.pdf PDF
AMDT0003_PN88658 SOF Ft Bragg RTA - Drawings Vol 1 Cover Sheet - Corrected Solicitation No.pdf PDF
W912PM20R00090003_Conformed.pdf PDF
AMDT0003_PN88658_2020.12.22_Spec Sec 09 29 00 Gypsum Board.pdf PDF
AMDT0003_PN88658_2020.12.22_Spec Sec 09 90 00 Paints And Coatings.pdf PDF
W912PM20R00090003.pdf PDF
AMDT0003_PN88658-Specs VOL 2.pdf PDF
AMDT0003_PN88658_2020.12.23_Summary_of_Technical_Changes[REVISED] FINAL.pdf PDF
AMDT0003_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
AMDT0002_PN88658-Specs VOL 2.pdf PDF
2020.12.17 - AMD-0002 - Sheet CU201.pdf PDF
2020.12.18-AMD-0002-88658_Technical_Summary_of_Changes.pdf PDF
W912PM20R00090002.pdf PDF
AMDT0002_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
W912PM20R00090002_Conformed.pdf PDF
AMDT0002_88658_03-17_O190U_Repair_1994_Combined_Asblts.pdf PDF
AMDT0002_PN88658-Specs VOL 1.pdf PDF
20R0009 Amendment 1 Clauses CCopy.docx.pdf PDF
20R0009 Amendment 1 Clauses.docx.pdf PDF
PN 88658 Site Visit Map.pdf PDF
PN_88658_JA Siemon_2ndversion_20201110 v1.2.pdf PDF
PN88658 RTA SOTF Drawings Vol 2 (LOCKED).pdf PDF
PN88658 - RTA Specs VOL 1 2nd Version 23Nov2020.pdf PDF
PN88658 RTA SOTF Drawings Vol 1 (LOCKED).pdf PDF
PN88658 - RTA Specs VOL 3 - FFE-SID.pdf PDF
PN_88658_JA_Security_Solutions_20201110 v1.2.pdf PDF
W912PM20R0009 PN88658 Solicitation.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
PN 88658 SOF Operations Facility Award Award Notice
This notice Latest solicitation Solicitation
PN 88658 SOF Operations Facility Pre-Solicitation
PN 88658 SOF Operations Facility Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina Fort Bragg, NC · NAICS 236220 ENDIST Savannah No set-aside
PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT Pope Army Airfield, Fort Bragg, Cumberland County, North Carolina · NAICS 236220 ENDIST Wilmington No set-aside
Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina Camp Lejeune, North Carolina 28547, United States · NAICS 236220 Naval Facilities Engineering Command No set-aside
FY26-FY31 JIOP Commercial Range Services BPA at Fort Bragg Fort Bragg, North Carolina 28310, United States · NAICS 561210 — Total Small Business
USAG Pressure Washing Fort Bragg, North Carolina 28310, United States · NAICS 561790 Mission and Installation Contracting Command HUBZone

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors