2020.12.18-AMD-0002-88658_Technical_Summary_of_Changes.pdf

PDF 5 MB Posted

Attached to
PN 88658 SOF Operations Facility Federal contract opportunity
Solicitation number
W912PM20R0009
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This document summarizes changes to an amendment of a solicitation for construction of a Special Operations Forces Operations Facility at Fort Bragg, North Carolina. The scope of work includes construction of administrative, mission planning, and storage areas, vehicle bays, a climate controlled pallet storage facility with lift, petroleum and lubricants storage, arms vaults, individual unit storage, engineering workshops, latrines with lockers, and laundry. Supporting facilities include site development, utilities, lighting, walks, fencing and other site improvements. The project also provides various security, communication, and audiovisual systems. Sustainability measures are required. The solicitation number is W912PM20R0009 and is issued by the Department of the Army Corps of Engineers Engineering District Wilmington. Revised sheets to the site utilities plan drawing are provided with the amendment.

View the file

Other files for this federal contract opportunity

Other files attached to PN 88658 SOF Operations Facility, newest first.
File Type Posted
W912PM20R0009-00005 Amendment.pdf PDF
AMDT0005_88658_Technical_Summary_Changes_Final_1.20.21.pdf PDF
AMDT0005_PN88658-Specs VOL 2.pdf PDF
AMDT0005_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
Site Visit sign in Sheet 2 of 2 12092020.jpg JPG image
AMDT0004_PN88658-Specs VOL 2.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
W912PM20R00090004_Conformed.docx.pdf PDF
AMDT0004_PN88658-Specs VOL 2.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
W912PM20R00090004_Modification 4.docx.pdf PDF
88658_ADMT004_Summary-of-Changes_Final.pdf PDF
AMDT0004_PN88658-Specs VOL 1.pdf PDF
W912PM20R00090003_Conformed.docx.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
88658_AMD-0004-Conformed_Dwgs.pdf PDF
AMDT0004_PN88658-Specs VOL 2.pdf PDF
AMDT0003_PN88658-Specs VOL 1.pdf PDF
AMDT0003_PN88658_2020.12.22_Spec Sec 09 29 00 Gypsum Board.pdf PDF
AMDT0003_PN88658 - RTA Specs VOL 2 Cover Sheet - 9.21.2020 - Corrected Solicitation No.pdf PDF
W912PM20R00090003_Conformed.pdf PDF
W912PM20R00090003.pdf PDF
AMDT0003_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
AMDT0003_PN88658-Specs VOL 2.pdf PDF
AMDT0003_PN88658 - RTA Specs VOL 1 Cover Sheet - 9.21.2020 - Corrected Solicitation No.pdf PDF
AMDT0002_PN88658-Specs VOL 2.pdf PDF
W912PM20R00090002_Conformed.pdf PDF
W912PM20R00090002.pdf PDF
AMDT0002_88658_03-17_O190U_Repair_1994_Combined_Asblts.pdf PDF
AMDT0002_PN88658-Specs VOL 1.pdf PDF
2020.12.17 - AMD-0002 - Sheet CU201.pdf PDF
AMDT0002_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
20R0009 Amendment 1 Clauses CCopy.docx.pdf PDF
20R0009 Amendment 1 Clauses.docx.pdf PDF
PN 88658 Site Visit Map.pdf PDF
PN_88658_JA Siemon_2ndversion_20201110 v1.2.pdf PDF
PN88658 RTA SOTF Drawings Vol 2 (LOCKED).pdf PDF
PN88658 - RTA Specs VOL 1 2nd Version 23Nov2020.pdf PDF
PN88658 RTA SOTF Drawings Vol 1 (LOCKED).pdf PDF
PN88658 - RTA Specs VOL 1.pdf PDF
PN_88658_JA_Security_Solutions_20201110 v1.2.pdf PDF
PN_88658_JA_Corning_20201117 v1.2.pdf PDF
PN88658 - RTA Specs VOL 3 - FFE-SID.pdf PDF
PN88658 RTA SOTF Drawings Vol 1.pdf PDF
PN88658 RTA SOTF Drawings Vol 2.pdf PDF
PN_88658_JA Siemon_20201110 v1.2.pdf PDF
PN_88658_JA Honeywell_20201110 v1.2 (1).pdf PDF
W912PM20R0009 PN88658 Solicitation.pdf PDF
PN88658 - RTA Specs VOL 2.pdf PDF
NAVFAC-USACE PPQ (fillable).pdf PDF
Show all 50

PN 88658 SOF Operations Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #W912-PM-20-R-009 SOF Operations Facility - Fort Bragg, North Carolina Amendment No. 0002 Date: 18 DEC 2020

SUMMARY OF CHANGES

1. CHANGES TO SPECIFICATIONS. Attached hereto are [new, revised and deleted] sections to the specifications. Revised sections replace like numbered sections. Revised pages replace like numbered pages. Revision mark “****Amendment 0002****” is shown on each revised page.

A. REVISED SECTIONS. The following revised sections replace like numbered sections.

Changes to text are indicated by underline and/or strike-through.

SECTION 01 33 00.00 37 SUBMITTAL PROCEDURES (Volume 1)

B. NEW SECTIONS. The following are added to the sections. None.

C. DELETED SECTION: The following sections are deleted: None.

2. CHANGES TO DRAWINGS. Attached hereto are [new and revised] drawing sheets. Revised sheets replace like-numbered sheets. The revision tracker in the Title Block of each sheet is populated to reflect the current Amendment Number and issue date. Attached hereto are As-Built drawings included for reference.

A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:

Sheet ID Volume Mark Revision Date

CU201 1 1 12/17/2020

B. NEW DRAWINGS (ISSUED). The following new drawings are added to the drawing set and are issued herewith:

Sheet ID Volume Mark Date

N/A N/A N/A N/A

C. AS-BUILT DRAWINGS (ISSUED). The following as-built drawings for 0190U, SF- 0007-4 are provided in addition to the drawing set and are issued herewith:

Sheet ID

• A-1

• A-2

• A-3

• A-4

• A-5

• A-6

• A-7

• A-8

• A-9

• A-10

• A-11

• A-12

• A-13

• E-1

• E-2

…end of summary…

FUEL POLISHING UNIT -

REFER TO PLUMBING PLANS

EX-SSMH

EX-SSMH

CO

6" SS

2" FM

1 1/2" FM

EX 4'Ø MH

RIM= 275.0'

INV- 269.9'

EX 4'Ø MH

RIM= 265.2'

INV= 257.5'

EX 375 LF 6" SS

8"

SS

EX

4 L F

8"

SS

FH

EX 15

1 L

F 8"

SS

EX 168 LF 8" SS

EX

L

F

" S S

EXIST. UG TELECOM DUCTBANK FH

2" G

AS

L

IN

E

TO

M

AI

N

GA

TE

co

EX-SSMH

EX

W

AT

ER

M

AI

N

EXIST. UG ELEC. DUCTBANK

EX.

EX. POLE

CAMERA

EX. POLE

CAMERA

EX. POLE

CAMERA

GM

PROPOSED GAS

METER

PROPOSED

AIR-COOLED

CHILLERS

TRANSFORMER

MECHANICAL ROOM (SEE MECH.

DRAWINGS FOR CONNECTIONS)ELECTRICAL ROOM (SEE ELEC.

DRAWINGS FOR CONNECTIONS)

DIESEL

GENERATOR

DIESEL

FUEL TANK

PROPOSED 4" SANITARY SEWER

SERVICE CONNECTION TO

EXISTING SANITARY SEWER

EXISTING

WATER CHILLER

MH

MH

MH

MHMH

M H

REFER TO PLUMBING PLANS

FOR FUEL OIL DETAIL

MH

MH

POL SHED

FFE: 282.00

R 1-

R

1-

R1-1

R1-1

R1-1

R1-1

PROPOSED

SOF OPERATIONS FACILITY

± 55,000 S.F.

(SEE ARCHITECTURAL PLANS)

FFE = 281.75

EXISTING COMM - SEE SHEET

T-100 FROM ELECTRICAL PLANS

FOR COMM COMMUNICATION

LINE ENTRANCE INTO BUILDING

NOT SHOWN HERE

S

S

S

S

S

LP LP LP

C

CONCRETE

BUILDING O190S

ASPHALT

H Y

D

CONNECT TO EXISTING MAIN

WITH D.I. TEE FITTING WITH

SADDLE AND VALVE

INSTALL 8"x8"x8"

TEE FITTING

INSTALL POST

INDICATOR VALVE

3" DOM DIP WATER

(SEE NOTE 6)

POTABLE WATER & FIRE MAIN

CONNECTIONS (REFER TO MECH.

PLUMBING DRAWINGS)INSTALL 8"x8"x3"

TEE FITTING AND

GATE VALVE

RISER TO BE INSTALLED IN

MECH. ROOM 1' ABOVE FFE

GAS MAIN AND GAS SERVICE LINES SHALL BE

INSTALLED BY THE CONTRACTOR. BEYOND 5

FEET OF THE BUILDING, CONTRACTOR SHALL

COordinate�7���:�,�7�+���3�,�(�'�0�2�1�7���1�$�7�8�5�$�/���*�$�6

(PNG) FOR DESIGN AND INSTALLATION.

2-1/2" DIP

FIRE WATER

3" POTABLE WATER METER

INSTALLED BY ASUS

3" RPZ W/ BFP

INSTALLED BY ASUS

INSTALL 8"x8"x6"

TEE FITTING, GATE

VALVE AND FIRE

HYDRANT

8" FIRE VAULT

INSTALLED BY ASUS

8" DIP FIRE

WATER

8" DIP FIRE

WATER

CONNECT TO EXISTING MAIN

WITH D.I. TEE FITTING WITH

SADDLE AND VALVE

8" DIP FIRE

WATER

(2) 3/4" PVC CONDUITS FOR PIV -

CONDUITS SHALL BE EQUIPPED WITH

PULL STRINGS - SEE ELECTRICAL

SITE PLAN FOR MORE INFORMATION

SSMH RIM ELEVATION TO

MATCH PROPOSED GRADE

BIORETENTION TOP OF BANK

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

FO

R

T

BR

AG

G

, N O

R

TH

C

AR

O

LI

N A

SO

F

O

PE

R

AT

IO

N

S

FA

C

IL

IT

Y

FY

0, P

N

SHEET ID

W

2P M

R

W

2H N

-1 4-

D -0

AN

SI

-D

9/

/2

U

S

AR

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

W

IL

M

IN

G

TO

N , N

O R

TH

C

AR

O

LI

N

A

AE

C

O M

S

ER

VI

C

ES

, I

N C

S J

EF

FE

R

SO

N S

T

ST

E

R

O

AN

O

KE

V A

1-

US Army Corps of Engineers ®

UNCLASSIFIED//FOR OFFICIAL USE ONLY

UNCLASSIFIED//FOR OFFICIAL USE ONLY

READY TO ADVERTISE (RTA) SUBMISSION

Wilmington District

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

SK

W

SK

W

G

FO

G

FO

FH

EMH

EM

LP

FFE

PVC

GV

WV

ROADWAY SIGN

PP

CB

DI

JB

PIV

FINISHED FLOOR ELEVATION

EXISTING GAS LINE

EXISTING WATER LINE

POST INDICATOR VALVE

EXISTING FIRE HYDRANT

EXISTING WATER VALVE

GAS VALVE

POLYVINYL CHLORIDE PIPE

JUNCTION BOX

CATCH BASIN

DROP INLET

ELECTRIC MANHOLE

ELECTRIC METER

PROPOSED UG TELECOM

POWER POLE

LIGHT POLE

CO SANITARY CLEAN-OUT

FH PROPOSED FIRE HYDRANT

WV PROPOSED WATER VALVE

PROPOSED WATER LINE

RCP REINFORCED CONCRETE PIPE

BL BOLLARD

WM WATER METER

EXISTING UG TELECOM

PROPOSED SS PIPING6-IN SS

EXISTING SS PIPING

PROPOSED SS MANHOLE

-0

PL

AN

S.

D

W G

SK

W

SK

W

LEGEND

EXISTING DRAINAGE PIPING

EXISTING DROP INLET

GM GAS METER

PROPOSED DRAINAGE PIPING

PROPOSED DROP INLET

FFE

281 EXISTING CONTOUR

PROPOSED CONTOUR

SPOT ELEVATION

FINISHED FLOOR ELEVATION RCP REINFORCED CONCRETE PIPE

BL BOLLARD

SEE SHEET CU202

LIMITS OF CONSTRUCTION

SS SANITARY SEWER

UTILITIES NOTES

1. UTILITY CONTRACTOR TO COORDINATE WITH BLDG CONTRACTOR. REFER TO ARCHITECTURAL AND PLUMBING PLANS FOR UTILITY CONNECTIONS.

2. WATER SUPPLY WILL BE PROVIDED BY AMERICAN STATES UTILITY SERVICE (ASUS). ASUS IS RESPONSIBLE FOR PERMITTING, DEMOLITION, DESIGN, AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION WITH ASUS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STUB OUT FROM THE BUILDING TO THE 5 FT LINE. CONTRACTOR ALSO RESPONSBILE FOR VERIFYING EXISITNG WATER LINE SIZIES PRIOR TO ORDERING MATERIALS.

3. ALL OVERHEAD ELECTRICAL LINES AND EQUIPMENT ARE OWNED AND OPERATED BY SANDHILL UTILITIES (SUS). SUS IS RESPONSIBLE FOR DEMOLITION, DESIGN, AND CONSTRUCTION OF EXTERIOR ELECTRICAL LINES FROM FORT BRAGG SUBSTATIONS TO PRIMARY SIDE OF THE BUILDING TRANSFORMER (POINT OF DEMARCATION).

4. SANITARY SEWER WILL BE PROVIDED BY AMERICAN STATES UTILITY SERVICE (ASUS). ASUS IS RESPONSIBLE FOR PERMITTING, DEMOLITION, DESIGN, AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION WITH ASUS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STUB

OUT FROM THE BUILDING TO THE 5 FT LINE.

5. BLDG CONTRACTOR AND SITE UTILITY CONTRACTOR TO COORDINATE ALL UTILITY CONNECTIONS AT 5' ENVELOPE.

6. SITE UTILITY CONTRACTOR SHALL INSTALL FIRE MAIN 1' ABOVE FINISHED FLOOR INSIDE MECH. ROOM (SEE MECH. DRAWINGS).

7. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES / DEPTHS PRIOR TO CONSTRUCTION.

8. ELECTRIC GROUNDING LOOP IS NOT SHOWN ON CIVIL PLANS. SEE ELECTRICAL PLANS FOR MORE INFORMATION. THIS GROUNDING LOOP SHALL BE LOCATED OUTSIDE THE BUILDING ENVELOPE. CONTRACTOR TO FIELD COORDINATE ELECTRIC LOOP LOCATION AND DEPTH(S) WITH ALL OTHER EXISTING AND PROPOSED

UTILITIES. DEPTHS MAY VARY DUE TO OTHER UTILITY WORK SHOWN ON THE UTILITY PLAN.

9. REFER TO PLUMBING PLANS FOR GENERATOR FUEL TANK AND ACCESSORIES.

10. CONCRETE PADS - CONTRACTOR SHALL VERIFY THE SIZE NEEDED AS SHOWN ON THESE DRAWINGS PER THE MANUFACTURER'S RECOMMENDED SIZE AND

THICKNESS. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.

11. CONTRACTOR SHALL COORDINATE WITH ALL PRIVATE UTILITIES FOR THE LOCATION OF EXISTING UTILITIES IN THE FIELD PRIOR TO BEGINNING CONSTRUCTION.

12. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER REGARDING ALL FT. BRAGG COMMUNICATION AND TELEPHONE UTILITIES PRIOR TO BEGINNING

CONSTRUCTION.

PROPOSED UG ELEC. POWER

EXISTING UG ELEC. POWER

PROPOSED GAS LINE

EXISTING CHAIN-LINK FENCE

PROPOSED STORMWATER

DETENTION

SITE UTILITIES PLAN 1

SCALE: 1" = 30'

SI

TE

U

TI

LI

TI

ES

P

LA

N

CU201

MATCHLINE

PLAN

NORTH

UTILITY POINTS OF CONTACT:

AMERICAN STATES UTILITY SERVICES (ASUS)

(WATER/WASTEWATER)

MR. NATHAN HURST

ENGINEERING TECHNICIAN

COR WATER AND WASTEWATER CONTRACT

DPW OMD ENERGY AND UTILITIES BRANCH

FORT BRAGG, NC 28310

WORK: 910-908-4447

CELL: 910-476-5176

ALLEN FORRESTER, PE

CAPITAL PROJECTS SUPERVISOR

2941 LOGISTICS STREET - BUILDING N-6307

FORT BRAGG, NC 28310-0001

OFFICE: 910-495-1311

CELL: 803-457-3556

FAX: 910-495-1310

ALLEN.FORRESTER@ASUSINC.COM

SANDHILLS (SUS)

(ELECTRIC)

DPW:

AUDREY OXENDINE

AUDREY.D.OXENDINE.CIV@MAIL.MIL

BILL CANON

PROJECT MANAGER

SANDHILLS UTILITY SERVICES

BUILDING 2-6503 BUTNER RD

FT. BRAGG, N.C. 28307

OFFICE 910-496-2209

CELL 940-818-3204

FAX 910-496-2296

BCANNON@SANDHILLSUTILITY.COM

PNG

(NATURAL GAS)

JAMES R. COOK

NATURAL GAS UP COR,

DPW/OMD ENERGY/UTILITIES TEAM

BLDG 251, BOXCAR ST.

POPE ARMY AIRFIELD

910.396.6368 DESK

910.309.7837 CELL

MR. JOE HECKMAN

JOE HECKMAN

PROJECT MANAGER

4740 CORPORATION DR.

FAYETTEVILLE, NC 28306

JOE.HECKMAN@DUKE-ENERGY.COM

CELL: 252-646-5438 OFFICE: 910-321-2941 1

12-17-2020

D

EC

N

AT

U R

AL

G

AS

S

ER

VI

C E

R

EV

IS

IO

N S

PE

R

A M

EN

D

M

EN

T

ISSUED FOR AMENDMENT 0002

COORDINATE WITH PIEDMONT NATURAL GAS

SUMMARY OF CHANGES
2020.12.17 - AMD-0002 - Sheet CU201.pdf
Sheets and Views
CU201 Site Utilities Plan 1
AMDT0002_88658_03-17_O190U_Repair_1994_Combined_Asblts.pdf
03-CQCR_SF7-1_A1
04-CQCR_SF7-4_A2
05-CQCR_SF7-4_A3
06-CQCR_SF7-4_A4
07-CQCR_SF7-4_A5
08-CQCR_SF7-4_A6
09-CQCR_SF7-4_A7
10-CQCR_SF7-4_A8
11-CQCR_SF7-4_A9
12-CQCR_SF7-4_A10
13-CQCR_SF7-4_A11
14-CQCR_SF7-4_A12
15-CQCR_SF7-4_A13
16-CQCR_SF7-4_E1
17-CQCR_SF7-4_E2

File details come from the government source that posted it. Updated .