2020.12.18-AMD-0002-88658_Technical_Summary_of_Changes.pdf
PDF 5 MB Posted
- Attached to
- PN 88658 SOF Operations Facility Federal contract opportunity
- Solicitation number
- W912PM20R0009
About this file
This document summarizes changes to an amendment of a solicitation for construction of a Special Operations Forces Operations Facility at Fort Bragg, North Carolina. The scope of work includes construction of administrative, mission planning, and storage areas, vehicle bays, a climate controlled pallet storage facility with lift, petroleum and lubricants storage, arms vaults, individual unit storage, engineering workshops, latrines with lockers, and laundry. Supporting facilities include site development, utilities, lighting, walks, fencing and other site improvements. The project also provides various security, communication, and audiovisual systems. Sustainability measures are required. The solicitation number is W912PM20R0009 and is issued by the Department of the Army Corps of Engineers Engineering District Wilmington. Revised sheets to the site utilities plan drawing are provided with the amendment.
View the file
Other files for this federal contract opportunity
Show all 50
PN 88658 SOF Operations Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #W912-PM-20-R-009 SOF Operations Facility - Fort Bragg, North Carolina Amendment No. 0002 Date: 18 DEC 2020
SUMMARY OF CHANGES
1. CHANGES TO SPECIFICATIONS. Attached hereto are [new, revised and deleted] sections to the specifications. Revised sections replace like numbered sections. Revised pages replace like numbered pages. Revision mark “****Amendment 0002****” is shown on each revised page.
A. REVISED SECTIONS. The following revised sections replace like numbered sections.
Changes to text are indicated by underline and/or strike-through.
SECTION 01 33 00.00 37 SUBMITTAL PROCEDURES (Volume 1)
B. NEW SECTIONS. The following are added to the sections. None.
C. DELETED SECTION: The following sections are deleted: None.
2. CHANGES TO DRAWINGS. Attached hereto are [new and revised] drawing sheets. Revised sheets replace like-numbered sheets. The revision tracker in the Title Block of each sheet is populated to reflect the current Amendment Number and issue date. Attached hereto are As-Built drawings included for reference.
A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:
Sheet ID Volume Mark Revision Date
CU201 1 1 12/17/2020
B. NEW DRAWINGS (ISSUED). The following new drawings are added to the drawing set and are issued herewith:
Sheet ID Volume Mark Date
N/A N/A N/A N/A
C. AS-BUILT DRAWINGS (ISSUED). The following as-built drawings for 0190U, SF- 0007-4 are provided in addition to the drawing set and are issued herewith:
Sheet ID
• A-1
• A-2
• A-3
• A-4
• A-5
• A-6
• A-7
• A-8
• A-9
• A-10
• A-11
• A-12
• A-13
• E-1
• E-2
…end of summary…
FUEL POLISHING UNIT -
REFER TO PLUMBING PLANS
EX-SSMH
EX-SSMH
CO
6" SS
2" FM
1 1/2" FM
EX 4'Ø MH
RIM= 275.0'
INV- 269.9'
EX 4'Ø MH
RIM= 265.2'
INV= 257.5'
EX 375 LF 6" SS
8"
SS
EX
4 L F
8"
SS
FH
EX 15
1 L
F 8"
SS
EX 168 LF 8" SS
EX
L
F
" S S
EXIST. UG TELECOM DUCTBANK FH
2" G
AS
L
IN
E
TO
M
AI
N
GA
TE
co
EX-SSMH
EX
W
AT
ER
M
AI
N
EXIST. UG ELEC. DUCTBANK
EX.
EX. POLE
CAMERA
EX. POLE
CAMERA
EX. POLE
CAMERA
GM
PROPOSED GAS
METER
PROPOSED
AIR-COOLED
CHILLERS
TRANSFORMER
MECHANICAL ROOM (SEE MECH.
DRAWINGS FOR CONNECTIONS)ELECTRICAL ROOM (SEE ELEC.
DRAWINGS FOR CONNECTIONS)
DIESEL
GENERATOR
DIESEL
FUEL TANK
PROPOSED 4" SANITARY SEWER
SERVICE CONNECTION TO
EXISTING SANITARY SEWER
EXISTING
WATER CHILLER
MH
MH
MH
MHMH
M H
REFER TO PLUMBING PLANS
FOR FUEL OIL DETAIL
MH
MH
POL SHED
FFE: 282.00
R 1-
R
1-
R1-1
R1-1
R1-1
R1-1
PROPOSED
SOF OPERATIONS FACILITY
± 55,000 S.F.
(SEE ARCHITECTURAL PLANS)
FFE = 281.75
EXISTING COMM - SEE SHEET
T-100 FROM ELECTRICAL PLANS
FOR COMM COMMUNICATION
LINE ENTRANCE INTO BUILDING
NOT SHOWN HERE
S
S
S
S
S
LP LP LP
C
CONCRETE
BUILDING O190S
ASPHALT
H Y
D
CONNECT TO EXISTING MAIN
WITH D.I. TEE FITTING WITH
SADDLE AND VALVE
INSTALL 8"x8"x8"
TEE FITTING
INSTALL POST
INDICATOR VALVE
3" DOM DIP WATER
(SEE NOTE 6)
POTABLE WATER & FIRE MAIN
CONNECTIONS (REFER TO MECH.
PLUMBING DRAWINGS)INSTALL 8"x8"x3"
TEE FITTING AND
GATE VALVE
RISER TO BE INSTALLED IN
MECH. ROOM 1' ABOVE FFE
GAS MAIN AND GAS SERVICE LINES SHALL BE
INSTALLED BY THE CONTRACTOR. BEYOND 5
FEET OF THE BUILDING, CONTRACTOR SHALL
COordinate�7���:�,�7�+���3�,�(�'�0�2�1�7���1�$�7�8�5�$�/���*�$�6
(PNG) FOR DESIGN AND INSTALLATION.
2-1/2" DIP
FIRE WATER
3" POTABLE WATER METER
INSTALLED BY ASUS
3" RPZ W/ BFP
INSTALLED BY ASUS
INSTALL 8"x8"x6"
TEE FITTING, GATE
VALVE AND FIRE
HYDRANT
8" FIRE VAULT
INSTALLED BY ASUS
8" DIP FIRE
WATER
8" DIP FIRE
WATER
CONNECT TO EXISTING MAIN
WITH D.I. TEE FITTING WITH
SADDLE AND VALVE
8" DIP FIRE
WATER
(2) 3/4" PVC CONDUITS FOR PIV -
CONDUITS SHALL BE EQUIPPED WITH
PULL STRINGS - SEE ELECTRICAL
SITE PLAN FOR MORE INFORMATION
SSMH RIM ELEVATION TO
MATCH PROPOSED GRADE
BIORETENTION TOP OF BANK
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
FO
R
T
BR
AG
G
, N O
R
TH
C
AR
O
LI
N A
SO
F
O
PE
R
AT
IO
N
S
FA
C
IL
IT
Y
FY
0, P
N
SHEET ID
W
2P M
R
W
2H N
-1 4-
D -0
AN
SI
-D
9/
/2
U
S
AR
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
AE
C
O M
S
ER
VI
C
ES
, I
N C
S J
EF
FE
R
SO
N S
T
ST
E
R
O
AN
O
KE
V A
1-
US Army Corps of Engineers ®
UNCLASSIFIED//FOR OFFICIAL USE ONLY
UNCLASSIFIED//FOR OFFICIAL USE ONLY
READY TO ADVERTISE (RTA) SUBMISSION
Wilmington District
C
AT
EG
O
R Y
C O
D E:
FI
LE
N
AM
E:
SK
W
SK
W
G
FO
G
FO
FH
EMH
EM
LP
FFE
PVC
GV
WV
ROADWAY SIGN
PP
CB
DI
JB
PIV
FINISHED FLOOR ELEVATION
EXISTING GAS LINE
EXISTING WATER LINE
POST INDICATOR VALVE
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
GAS VALVE
POLYVINYL CHLORIDE PIPE
JUNCTION BOX
CATCH BASIN
DROP INLET
ELECTRIC MANHOLE
ELECTRIC METER
PROPOSED UG TELECOM
POWER POLE
LIGHT POLE
CO SANITARY CLEAN-OUT
FH PROPOSED FIRE HYDRANT
WV PROPOSED WATER VALVE
PROPOSED WATER LINE
RCP REINFORCED CONCRETE PIPE
BL BOLLARD
WM WATER METER
EXISTING UG TELECOM
PROPOSED SS PIPING6-IN SS
EXISTING SS PIPING
PROPOSED SS MANHOLE
-0
PL
AN
S.
D
W G
SK
W
SK
W
LEGEND
EXISTING DRAINAGE PIPING
EXISTING DROP INLET
GM GAS METER
PROPOSED DRAINAGE PIPING
PROPOSED DROP INLET
FFE
281 EXISTING CONTOUR
PROPOSED CONTOUR
SPOT ELEVATION
FINISHED FLOOR ELEVATION RCP REINFORCED CONCRETE PIPE
BL BOLLARD
SEE SHEET CU202
LIMITS OF CONSTRUCTION
SS SANITARY SEWER
UTILITIES NOTES
1. UTILITY CONTRACTOR TO COORDINATE WITH BLDG CONTRACTOR. REFER TO ARCHITECTURAL AND PLUMBING PLANS FOR UTILITY CONNECTIONS.
2. WATER SUPPLY WILL BE PROVIDED BY AMERICAN STATES UTILITY SERVICE (ASUS). ASUS IS RESPONSIBLE FOR PERMITTING, DEMOLITION, DESIGN, AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION WITH ASUS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STUB OUT FROM THE BUILDING TO THE 5 FT LINE. CONTRACTOR ALSO RESPONSBILE FOR VERIFYING EXISITNG WATER LINE SIZIES PRIOR TO ORDERING MATERIALS.
3. ALL OVERHEAD ELECTRICAL LINES AND EQUIPMENT ARE OWNED AND OPERATED BY SANDHILL UTILITIES (SUS). SUS IS RESPONSIBLE FOR DEMOLITION, DESIGN, AND CONSTRUCTION OF EXTERIOR ELECTRICAL LINES FROM FORT BRAGG SUBSTATIONS TO PRIMARY SIDE OF THE BUILDING TRANSFORMER (POINT OF DEMARCATION).
4. SANITARY SEWER WILL BE PROVIDED BY AMERICAN STATES UTILITY SERVICE (ASUS). ASUS IS RESPONSIBLE FOR PERMITTING, DEMOLITION, DESIGN, AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION WITH ASUS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STUB
OUT FROM THE BUILDING TO THE 5 FT LINE.
5. BLDG CONTRACTOR AND SITE UTILITY CONTRACTOR TO COORDINATE ALL UTILITY CONNECTIONS AT 5' ENVELOPE.
6. SITE UTILITY CONTRACTOR SHALL INSTALL FIRE MAIN 1' ABOVE FINISHED FLOOR INSIDE MECH. ROOM (SEE MECH. DRAWINGS).
7. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES / DEPTHS PRIOR TO CONSTRUCTION.
8. ELECTRIC GROUNDING LOOP IS NOT SHOWN ON CIVIL PLANS. SEE ELECTRICAL PLANS FOR MORE INFORMATION. THIS GROUNDING LOOP SHALL BE LOCATED OUTSIDE THE BUILDING ENVELOPE. CONTRACTOR TO FIELD COORDINATE ELECTRIC LOOP LOCATION AND DEPTH(S) WITH ALL OTHER EXISTING AND PROPOSED
UTILITIES. DEPTHS MAY VARY DUE TO OTHER UTILITY WORK SHOWN ON THE UTILITY PLAN.
9. REFER TO PLUMBING PLANS FOR GENERATOR FUEL TANK AND ACCESSORIES.
10. CONCRETE PADS - CONTRACTOR SHALL VERIFY THE SIZE NEEDED AS SHOWN ON THESE DRAWINGS PER THE MANUFACTURER'S RECOMMENDED SIZE AND
THICKNESS. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
11. CONTRACTOR SHALL COORDINATE WITH ALL PRIVATE UTILITIES FOR THE LOCATION OF EXISTING UTILITIES IN THE FIELD PRIOR TO BEGINNING CONSTRUCTION.
12. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER REGARDING ALL FT. BRAGG COMMUNICATION AND TELEPHONE UTILITIES PRIOR TO BEGINNING
CONSTRUCTION.
PROPOSED UG ELEC. POWER
EXISTING UG ELEC. POWER
PROPOSED GAS LINE
EXISTING CHAIN-LINK FENCE
PROPOSED STORMWATER
DETENTION
SITE UTILITIES PLAN 1
SCALE: 1" = 30'
SI
TE
U
TI
LI
TI
ES
P
LA
N
CU201
MATCHLINE
PLAN
NORTH
UTILITY POINTS OF CONTACT:
AMERICAN STATES UTILITY SERVICES (ASUS)
(WATER/WASTEWATER)
MR. NATHAN HURST
ENGINEERING TECHNICIAN
COR WATER AND WASTEWATER CONTRACT
DPW OMD ENERGY AND UTILITIES BRANCH
FORT BRAGG, NC 28310
WORK: 910-908-4447
CELL: 910-476-5176
ALLEN FORRESTER, PE
CAPITAL PROJECTS SUPERVISOR
2941 LOGISTICS STREET - BUILDING N-6307
FORT BRAGG, NC 28310-0001
OFFICE: 910-495-1311
CELL: 803-457-3556
FAX: 910-495-1310
ALLEN.FORRESTER@ASUSINC.COM
SANDHILLS (SUS)
(ELECTRIC)
DPW:
AUDREY OXENDINE
AUDREY.D.OXENDINE.CIV@MAIL.MIL
BILL CANON
PROJECT MANAGER
SANDHILLS UTILITY SERVICES
BUILDING 2-6503 BUTNER RD
FT. BRAGG, N.C. 28307
OFFICE 910-496-2209
CELL 940-818-3204
FAX 910-496-2296
BCANNON@SANDHILLSUTILITY.COM
PNG
(NATURAL GAS)
JAMES R. COOK
NATURAL GAS UP COR,
DPW/OMD ENERGY/UTILITIES TEAM
BLDG 251, BOXCAR ST.
POPE ARMY AIRFIELD
910.396.6368 DESK
910.309.7837 CELL
MR. JOE HECKMAN
JOE HECKMAN
PROJECT MANAGER
4740 CORPORATION DR.
FAYETTEVILLE, NC 28306
JOE.HECKMAN@DUKE-ENERGY.COM
CELL: 252-646-5438 OFFICE: 910-321-2941 1
12-17-2020
D
EC
N
AT
U R
AL
G
AS
S
ER
VI
C E
R
EV
IS
IO
N S
PE
R
A M
EN
D
M
EN
T
ISSUED FOR AMENDMENT 0002
COORDINATE WITH PIEDMONT NATURAL GAS
| SUMMARY OF CHANGES |
| 2020.12.17 - AMD-0002 - Sheet CU201.pdf |
| Sheets and Views |
| CU201 Site Utilities Plan 1 |
| AMDT0002_88658_03-17_O190U_Repair_1994_Combined_Asblts.pdf |
| 03-CQCR_SF7-1_A1 |
| 04-CQCR_SF7-4_A2 |
| 05-CQCR_SF7-4_A3 |
| 06-CQCR_SF7-4_A4 |
| 07-CQCR_SF7-4_A5 |
| 08-CQCR_SF7-4_A6 |
| 09-CQCR_SF7-4_A7 |
| 10-CQCR_SF7-4_A8 |
| 11-CQCR_SF7-4_A9 |
| 12-CQCR_SF7-4_A10 |
| 13-CQCR_SF7-4_A11 |
| 14-CQCR_SF7-4_A12 |
| 15-CQCR_SF7-4_A13 |
| 16-CQCR_SF7-4_E1 |
| 17-CQCR_SF7-4_E2 |
File details come from the government source that posted it. Updated .