20R0009 Amendment 1 Clauses.docx.pdf

PDF 209 KB Posted

Attached to
PN 88658 SOF Operations Facility Federal contract opportunity
Solicitation number
W912PM20R0009
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This document contains an amendment to a solicitation and related federal contract opportunity. The amendment modifies clauses 52.211-10, 52.211-12, and 52.236-4 of the solicitation by including the full text of the clauses. The federal contract opportunity is for the construction of a Special Operations Forces Operations Facility at Fort Bragg, North Carolina. The scope of work includes construction of administrative, mission planning, and storage areas, vehicle bays, a climate controlled pallet storage facility with lift, petroleum storage, arms vaults, individual unit storage, workshops, latrines with lockers, laundry facilities, and a Secure Compartmentalized Information Facility. Supporting facilities such as utilities, lighting, parking, and site improvements are also required. The facility must meet DoD principles for high performance and sustainability and incorporate cybersecurity measures. The contract will be awarded by the Army Corps of Engineers Engineering District Wilmington.

View the file

Other files for this federal contract opportunity

Other files attached to PN 88658 SOF Operations Facility, newest first.
File Type Posted
W912PM20R0009-00005 Amendment.pdf PDF
AMDT0005_88658_Technical_Summary_Changes_Final_1.20.21.pdf PDF
AMDT0005_PN88658-Specs VOL 2.pdf PDF
AMDT0005_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
Site Visit sign in Sheet 2 of 2 12092020.jpg JPG image
AMDT0004_PN88658-Specs VOL 2.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
W912PM20R00090004_Conformed.docx.pdf PDF
AMDT0004_PN88658-Specs VOL 2.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
W912PM20R00090004_Modification 4.docx.pdf PDF
W912PM20R00090003_Conformed.docx.pdf PDF
AMDT0004_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
88658_ADMT004_Summary-of-Changes_Final.pdf PDF
AMDT0004_PN88658-Specs VOL 1.pdf PDF
88658_AMD-0004-Conformed_Dwgs.pdf PDF
AMDT0004_PN88658-Specs VOL 2.pdf PDF
AMDT0003_PN88658 - RTA Specs VOL 2 Cover Sheet - 9.21.2020 - Corrected Solicitation No.pdf PDF
W912PM20R00090003_Conformed.pdf PDF
W912PM20R00090003.pdf PDF
AMDT0003_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
AMDT0003_PN88658-Specs VOL 1.pdf PDF
AMDT0003_PN88658_2020.12.22_Spec Sec 09 29 00 Gypsum Board.pdf PDF
AMDT0003_PN88658-Specs VOL 2.pdf PDF
AMDT0003_PN88658 - RTA Specs VOL 1 Cover Sheet - 9.21.2020 - Corrected Solicitation No.pdf PDF
2020.12.18-AMD-0002-88658_Technical_Summary_of_Changes.pdf PDF
W912PM20R00090002_Conformed.pdf PDF
AMDT0002_PN88658-Specs VOL 2.pdf PDF
W912PM20R00090002.pdf PDF
AMDT0002_88658_03-17_O190U_Repair_1994_Combined_Asblts.pdf PDF
AMDT0002_PN88658-Specs VOL 1.pdf PDF
2020.12.17 - AMD-0002 - Sheet CU201.pdf PDF
AMDT0002_PN88658-Specs VOL 3 - FFE-SID.pdf PDF
20R0009 Amendment 1 Clauses CCopy.docx.pdf PDF
PN 88658 Site Visit Map.pdf PDF
PN_88658_JA Siemon_2ndversion_20201110 v1.2.pdf PDF
PN88658 RTA SOTF Drawings Vol 2 (LOCKED).pdf PDF
PN88658 - RTA Specs VOL 1 2nd Version 23Nov2020.pdf PDF
PN88658 RTA SOTF Drawings Vol 1 (LOCKED).pdf PDF
PN_88658_JA_Security_Solutions_20201110 v1.2.pdf PDF
PN_88658_JA_Corning_20201117 v1.2.pdf PDF
PN88658 - RTA Specs VOL 1.pdf PDF
PN88658 - RTA Specs VOL 3 - FFE-SID.pdf PDF
PN88658 RTA SOTF Drawings Vol 1.pdf PDF
PN88658 RTA SOTF Drawings Vol 2.pdf PDF
PN_88658_JA Siemon_20201110 v1.2.pdf PDF
PN_88658_JA Honeywell_20201110 v1.2 (1).pdf PDF
W912PM20R0009 PN88658 Solicitation.pdf PDF
PN88658 - RTA Specs VOL 2.pdf PDF
NAVFAC-USACE PPQ (fillable).pdf PDF
Show all 50

PN 88658 SOF Operations Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A) Incorporate Clauses 52.211-10 and 52.211-12 by Full Text vice by Reference.

All other terms and provisions are unchanged.

///////////////////////////////////////////////////LAST ITEM////////////////////////////////////////////////////////////////////////////////////////////

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM20R0009

X 9B. DATED (SEE ITEM 11)

20-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Dec-2020

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM20R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 540 calendar days.* The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,229.23 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by subsurface investigations and topographic surveys.

(b) Weather conditions are reported by the U.S. Department of Commerce, National Oceanic and Atmospheric

Administration (NOAA) Environmental Data Service, Asheville, North Carolina and information about weather conditions is available through the following internet site: http://www.nws.noaa.gov /

(c) Transportation facilities. Transportation facilities ‐‐ US Highways 74, 76, Owen Road, and All American

Highway, as well as North Carolina Highways 87 and 95 serve the general area where the work will be performed at

Fort Bragg, North Carolina. Yadkin and Reilly Roads in Ft. Bragg, North Carolina serve the general area where the work will be performed.

http://www.nws.noaa.gov/

W912PM20R0009

(End of Summary of Changes)

File details come from the government source that posted it. Updated .