This Request for Proposal solicits construction services for a Special Operations Facility project. The scope of work includes construction of administrative areas, mission planning areas, vehicle bays, climate controlled pallet storage with lift, Petroleum Oil and Lubricants storage, arms vaults, individual unit caged storage, engineering workshops, latrines with lockers and laundry. It also includes space for a Secure Compartmentalized Information Facility with administrative area, 50-person classroom, operations center and Special Access Programs. Supporting facilities include site development, utilities, lighting, fencing and other site improvements. Sustainability and energy measures will be incorporated. The facility is designed for a minimum 40-year life in accordance with applicable criteria. Interior design, electronic security, audio visual and cybersecurity services are included. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Wilmington.
View the file
Other files for this federal contract opportunity
Show all 50
PN 88658 SOF Operations Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912PM20R0009
SOTF Special Operations Facility
PN 88658
Fort Bragg, North Carolina
Amendment 0005
Specifications - Volume 1 of 3
January 2021________________________
SOLICITATIONUNCLASSIFIED//FOR OFFICIAL USE ONLY
SOLICITATIONUNCLASSIFIED//FOR OFFICIAL USE ONLY
SOF Operations Facility Fort Bragg, NC
PN88658, FY 21
Specifications Volume 1 of 2 Ready to Advertise (RTA) Submission
Solicitation No: W912PM20R0009
Prepared for:
U.S. Army Corps of Engineers, Wilmington District
Prepared by:
AECOM Project No.: 60600110 AECOM Contract No.: W912-HN-14-D-0019 AECOM Delivery Order No.:
W912PM19F0025
Date: 11 November 2020
THIS PAGE INTENTIONALLY LEFT BLANK
SOF OPERATIONS FACILITY PN 88658
FORT BRAGG, NORTH CAROLINA
SEALS PAGE 1
CIVIL STRUCTURAL
ARCHITECTURAL INTERIORS
FIRE PROTECTION PLUMBING
SEALS PAGE 2
MECHANICAL ELECTRICAL
TELECOM/SECURITY/AV TELECOM/SECURITY/AV
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 60 SECURITY PROCEDURES GUIDE
01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 37 PROJECT SCHEDULE
01 33 00.00 37 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19.00 37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00.00 37 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.00 37 COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
PROJECT TABLE OF CONTENTS Page 1
Revised by Amendment No. 0005
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 13 METAL WALL PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 44 00 CURTAIN WALL, GLAZED ASSEMBLIES AND SUN CONTROL
08 51 23 STEEL WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 83 16 SPRAY-APPLIED ACOUSTICAL INSULATION
09 84 53 SOUND BARRIER MULLION TRIM CAP
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 56 13 STEEL SHELVING
PROJECT TABLE OF CONTENTS Page 2
****Amendment 0005*** Delete Section 10 26 00 WALL AND DOOR PROTECTION in its entirety.
****Amendment 0005****
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 18.00 10 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION
21 22 00.00 40 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 00.00 20 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.01 CYBERSECURITY FOR HEATING, VENTILATION AND AIR
CONDITIONING (HVAC)
25 05 11.02 CYBERSECURITY FOR INTERIOR DISTRIBUTION SYSTEM
25 05 11.03 CYBERSECURITY FOR POWER SYSTEMS AND METERING
25 05 11.04 CYBERSECURITY FOR LONWORKS DIRECT DIGITAL CONTROL SYSTEM
FOR HVAC
25 05 11.05 CYBERSECURITY FOR FACILITY-RELATED LIGHTING SYSTEMS
25 05 11.06 CYBERSECURITY FOR FIRE AND LIFE SAFETY SYSTEMS
PROJECT TABLE OF CONTENTS Page 3
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH
AUXILIARIES
26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA
CAPACITY
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 24 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 32 23.13 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 01 50.31 LEAK DETECTION FOR FUELING SYSTEMS
33 08 55 FUEL DISTRIBUTION SYSTEM START-UP (NON-HYDRANT)
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 52 40 FUEL SYSTEMS PIPING (NON-HYDRANT)
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
PROJECT TABLE OF CONTENTS Page 4
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as indicated on the attachment.
-- End of Document --
DOCUMENT 00 01 15 Page 1
SHEET ID FILENAME SHEET TITLE
G-001.1 FY20PN88658G-001.1.dwg COVER SHEET - VOLUME I G-001.2 FY20PN88658G-001.2.dwg COVER SHEET - VOLUME II G-002 FY20PN88658G-002.dwg FT. BRAGG CANTONMENT G-003 FY20PN88658G-003.dwg INDEX OF DRAWINGS G-004 FY20PN88658G-003.dwg ABBREVIATIONS G-005 FY20PN88658G-004.dwg GENERAL SYMBOLOGY G-006 FY20PN88658G-005.dwg TYPICAL MOUNTING HEIGHTS
GI001 FY20PN88658GI001.dwg LIFE SAFETY CODE ANALYSIS GI002 FY20PN88658GI002.dwg EMERGENCY VEHICLE ACCESS GI101 FY20PN88658GI101.dwg FIRST FLOOR LIFE SAFETY PLAN GI102 FY20PN88658GI102.dwg SECOND FLOOR LIFE SAFETY PLAN
VF100 FY20PN88658VF100.dwg SURVEY & NOTES VF101 FY20PN88658VF101.dwg EXISTING TOPOGRAPHY 1 VF102 FY20PN88658VF102.dwg EXISTING TOPOGRAPHY 2 B-101 FY20PN88658B-101.dwg BORING LOCATION PLAN 1 B-102 FY20PN88658B-102.dwg BORING LOCATION PLAN 2 BB601 FY20PN88658BB601.dwg SOIL TEST BORING LOGS 1 BB602 FY20PN88658BB602.dwg SOIL TEST BORING LOGS 2 BB603 FY20PN88658BB603.dwg SOIL TEST BORING LOGS 3 BB604 FY20PN88658BB604.dwg SOIL TEST BORING LOGS 4 BB605 FY20PN88658BB605.dwg SOIL TEST BORING LOGS 5 BB606 FY20PN88658BB606.dwg SOIL TEST BORING LOGS 6 CD101 FY20PN88658CD101.dwg SITE DEMOLITION PLAN 1 CD102 FY20PN88658CD102.dwg SITE DEMOLITION PLAN 2 CS101 FY20PN88658CS101.dwg SITE UTILITIES PLAN 1 CS102 FY20PN88658CS102.dwg SITE UTILITIES PLAN 2 CS201 FY20PN88658CS201.dwg SIGNAGE & MARKINGS PLAN 1 CS202 FY20PN88658CS202.dwg SIGNAGE & MARKINGS PLAN 2 CS501 FY20PN88658CS502.dwg SITE DETAILS 1 CS502 FY20PN88658CS502.dwg SITE DETAILS 2 CG101 FY20PN88658CG101.dwg SITE GRADING PLAN 1 CG102 FY20PN88658CG102.dwg SITE GRADING PLAN 2 CG103 FY20PN88658CG103.dwg STORM DRAINAGE PLAN 1 CG104 FY20PN88658CG104.dwg STORM DRAINAGE PLAN 2 CG105 FY20PN88658CG105.dwg EROSION CONTROL PHASE I PLAN 1 CG106 FY20PN88658CG106.dwg EROSION CONTROL PHASE I PLAN 2 CG107 FY20PN88658CG107.dwg EROSION CONTROL PHASE II PLAN 1 CG108 FY20PN88658CG108.dwg EROSION CONTROL PHASE II PLAN 2 CG109 FY20PN88658CG109.dwg EROSION CONTROL PHASE III PLAN 1 CG110 FY20PN88658CG110.dwg EROSION CONTROL PHASE III PLAN 2 CG201 FY20PN88658CG201.dwg STORM DRAINAGE PROFILES 1 CG202 FY20PN88658CG202.dwg STORM DRAINAGE PROFILES 2 CG501 FY20PN88658CG501.dwg STORM DRAINAGE DETAILS
LIST OF DRAWINGS
GENERAL
LIFE SAFETY
CIVIL
00 01 15 ATTACHMENT 1 of 8
CG502 FY20PN88658CG502.dwg STORM DRAINAGE DETAILS 2 CG503 FY20PN88658CG503.dwg STORM DRAINAGE DETAILS 3 CG504 FY20PN88658CG504.dwg STORM DRAINAGE DETAILS 4 CG505 FY20PN88658CG505.dwg N.P.D.E.S. CHECKLIST 1 CG506 FY20PN88658CG506.dwg N.P.D.E.S CHECKLIST 2 CG507 FY20PN88658CG507.dwg EROSION CONTROL DETAILS & NOTES 1 CG508 FY20PN88658CG509.dwg EROSION CONTROL DETAILS & NOTES 2 CG509 FY20PN88658CG509.dwg EROSION CONTROL DETAILS & NOTES 3 CG510 FY20PN88658CG510.dwg EROSION CONTROL DETAILS & NOTES 4 CG511 FY20PN88658CG511.dwg EROSION CONTROL DETAILS & NOTES 5 CG512 FY20PN88658CG512.dwg EROSION CONTROL DETAILS & NOTES 6 CG513 FY20PN88658CG513.dwg EROSION CONTROL DETAILS & NOTES 7 CG514 FY20PN88658CG514.dwg EROSION CONTROL DETAILS & NOTES 8 CG515 FY20PN88658CG515.dwg EROSION CONTROL DETAILS & NOTES 9 CG516 FY20PN88658CG516.dwg EROSION CONTROL DETAILS & NOTES 10 CG517 FY20PN88658CG517.dwg EROSION CONTROL DETAILS & NOTES 11 CG518 FY20PN88658CG518.dwg EROSION CONTROL DETAILS & NOTES 12 CG519 FY20PN88658CG519.dwg ADDITIONAL NOTES CU201 FY20PN88658CU201.dwg SITE UTILITIES PLAN 1 CU202 FY20PN88658CU202.dwg SITE UTILITIES PLAN 2 CU203 FY20PN88658CU203.dwg SANITARY SEWER PROFILES CU501 FY20PN88658CU501.dwg SANITARY SEWER DETAILS 1 CU502 FY20PN88658CU502.dwg SANITARY SEWER DETAILS 2 CU503 FY20PN88658CU503.dwg WATER DETAILS L-101 FY20PN88658L-101.dwg LANDSCAPING PLAN 1 L-102 FY20PN88658L-102.dwg LANDSCAPING PLAN 2
S-001 FY20PN88658S-001 GENERAL NOTES
S-002 FY20PN88658S-002 WIND C&C DIAGRAM
S-101 FY20PN88658S-101 FOUNDATION PLAN - OVERALL
S-101A FY20PN88658S-101A FOUNDATION PLAN - AREA A
S-101B FY20PN88658S-101B FOUNDATION PLAN - AREA B
S-102 FY20PN88658S-102 SECOND FLOOR FRAMING PLAN - OVERALL
S-102A FY20PN88658S-102A SECOND FLOOR FRAMING PLAN - AREA A
S-102B FY20PN88658S-102B SECOND FLOOR FRAMING PLAN - AREA B
S-103 FY20PN88658S-103 ROOF FRAMING PLAN - OVERALL
S-103A FY20PN88658S-103A ROOF FRAMING PLAN - AREA A
S-103B FY20PN88658S-103B ROOF FRAMING PLAN - AREA B
S-201 FY20PN88658S-201 BRACED FRAME ELEVATIONS
S-202 FY20PN88658S-202 BRACED FRAME ELEVATIONS
S-203 FY20PN88658S-203 TRUSS ELEVATIONS
S-301 FY20PN88658S-301 SECTION & DETAILS
S-302 FY20PN88658S-302 SECTION & DETAILS
S-303 FY20PN88658S-303 SECTION & DETAILS
S-304 FY20PN88658S-304 SECTION & DETAILS
S-305 FY20PN88658S-305 SECTION & DETAILS
S-306 FY20PN88658S-306 SECTION & DETAILS
S-307 FY20PN88658S-307 SECTION & DETAILS
S-308 FY20PN88658S-308 SECTION & DETAILS
S-309 FY20PN88658S-309 SECTION & DETAILS
S-310 FY20PN88658S-310 SECTION & DETAILS
STRUCTURAL
00 01 15 ATTACHMENT 2 of 8
S-311 FY20PN88658S-311 SECTION & DETAILS
S-401 FY20PN88658S-401 ENLARGED PLANS
S-402 FY20PN88658S-402 ENLARGED PLANS
S-403 FY20PN88658S-403 ENLARGED PLANS - AREA C
S-404 FY20PN88658S-404 ENLARGED PLAN - BID OPTION 1
S-501 FY20PN88658S-501 TYPICAL DETAILS
S-502 FY20PN88658S-502 TYPICAL DETAILS
S-503 FY20PN88658S-503 TYPICAL DETAILS
S-504 FY20PN88658S-504 TYPICAL DETAILS
S-601 FY20PN88658S-601 SCHEDULES
A-001 FY20PN88658A-001.dwg GENERAL NOTES AND LEGENDS A-100 FY20PN88658A-100.dwg SECURITY AND STC PLAN A-101 FY20PN88658A-101.dwg FIRST FLOOR PLAN - OVERALL A-101A FY20PN88658A-101A.dwg FIRST FLOOR PLAN - AREA A A-101B FY20PN88658A-101B.dwg FIRST FLOOR PLAN - AREA B A-102 FY20PN88658A-102.dwg SECOND FLOOR PLAN - OVERALL A-102A FY20PN88658A-102A.dwg SECOND FLOOR PLAN - AREA A A-102B FY20PN88658A-102B.dwg SECOND FLOOR PLAN - AREA B A-103 FY20PN88658A-103.dwg ROOF PLAN A-111 FY20PN88658A-111.dwg FIRST FLOOR REFLECTED CEILING PLAN - OVERALL A-111A FY20PN88658A-111A.dwg FIRST FLOOR REFLECTED CEILING PLAN - AREA A A-111B FY20PN88658A-111B.dwg FIRST FLOOR REFLECTED CEILING PLAN - AREA B A-112 FY20PN88658A-112.dwg SECOND FLOOR REFLECTED CEILING PLAN - OVERALL A-112A FY20PN88658A-112A.dwg SECOND FLOOR REFLECTED CEILING PLAN - AREA A A-112B FY20PN88658A-112B.dwg SECOND FLOOR REFLECTED CEILING PLAN - AREA B A-122A FY20PN88658A-122A.dwg RAISED ACCESS FLOOR PLAN - AREA A A-201 FY20PN88658A-201.dwg BUILDING ELEVATIONS A-202 FY20PN88658A-202.dwg ENLARGED ELEVATIONS A-203 FY20PN88658A-203.dwg ENLARGED ELEVATIONS A-204 FY20PN88658A-204.dwg ENLARGED ELEVATIONS A-205 FY20PN88658A-205.dwg CLERESTORY ELEVATIONS A-301 FY20PN88658A-301.dwg BUILDING SECTIONS A-302 FY20PN88658A-302.dwg BUILDING SECTIONS A-303 FY20PN88658A-303.dwg ENLARGED BUILDING SECTIONS A-310 FY20PN88658A-310.dwg WALL SECTIONS A-311 FY20PN88658A-311.dwg WALL SECTIONS A-312 FY20PN88658A-312.dwg WALL SECTIONS A-313 FY20PN88658A-313.dwg WALL SECTIONS A-314 FY20PN88658A-314.dwg WALL SECTIONS A-315 FY20PN88658A-315.dwg WALL SECTIONS A-316 FY20PN88658A-316.dwg WALL SECTIONS A-317 FY20PN88658A-317.dwg WALL SECTIONS A-401 FY20PN88658A-401.dwg ENLARGED STAIR A-402 FY20PN88658A-402.dwg ENLARGED STAIR A-403 FY20PN88658A-403.dwg ENLARGED STAIR A-404 FY20PN88658A-404.dwg ENLARGED RESTROOM AND ELEVATIONS A-405 FY20PN88658A-405.dwg ENLARGED LOCKER ROOM AND ELEVATIONS A-406 FY20PN88658A-406.dwg ENLARGED PLANS AND ELEVATIONS A-407 FY20PN88658A-407.dwg ENLARGED PLANS AND ELEVATIONS A-408 FY20PN88658A-408.dwg ENLARGED VESTIBULE
ARCHITECTURE
00 01 15 ATTACHMENT 3 of 8
A-410 FY20PN88658A-410.dwg POL STORAGE BUILDING - PLANS AND ELEVATIONS A-411 FY20PN88658A-411.dwg POL STORAGE BUILDING - SECTIONS A-501 FY20PN88658A-501.dwg EXTERIOR WALL DETAILS A-502 FY20PN88658A-502.dwg EXTERIOR WALL BASE DETAILS A-503 FY20PN88658A-503.dwg CLERESTORY DETAILS A-504 FY20PN88658A-504.dwg ROOF DETAILS A-505 FY20PN88658A-505.dwg ROOF DETAILS A-506 FY20PN88658A-506.dwg ROOF DETAILS A-510 FY20PN88658A-510.dwg STAIR & RAILING DETAILS A-511 FY20PN88658A-511.dwg STAIR AND RAILING DETAILS A-520 FY20PN88658A-520.dwg PLAN DETAILS A-530 FY20PN88658A-530.dwg INTERIOR DETAILS A-535 FY20PN88658A-535.dwg CASEWORK DETAILS A-536 FY20PN88658A-536.dwg CASEWORK DETAILS A-537 FY20PN88658A-537.dwg CASEWORK DETAILS A-540 FY20PN88658A-540.dwg TRANSLUCENT WALL DETAIL A-601 FY20PN88658A-601.dwg PARTITION TYPES A-602 FY20PN88658A-602.dwg DEMOUNTABLE PARTITION TYPES A-603 FY20PN88658A-603.dwg DOOR SCHEDULE & DOOR TYPES A-610 FY20PN88658A-610.dwg DOOR DETAILS A-611 FY20PN88658A-611.dwg DOOR DETAILS A-621 FY20PN88658A-621.dwg WINDOW DETAILS A-622 FY20PN88658A-622.dwg EXTERIOR WINDOW ELEVATIONS A-623 FY20PN88658A-623.dwg EXTERIOR WINDOW ELEVATIONS A-625 FY20PN88658A-625.dwg INTERIOR WINDOW ELEVATIONS A-630 FY20PN88658A-630.dwg EXTERIOR LOUVER ELEVATIONS A-640 FY20PN88658A-640.dwg MULLION DETAILS A-801 FY20PN88658A-801.dwg FIRST FLOOR PLAN - AIR BARRIER A-802 FY20PN88658A-802.dwg SECOND FLOOR PLAN - AIR BARRIER A-803 FY20PN88658A-803.dwg BUILDING SECTIONS - AIR BARRIER A-804 FY20PN88658A-804.dwg AIR BARRIER - LONGITUDINAL BUILDING SECTION A-805 FY20PN88658A-805.dwg AIR BARRIER DETAILS
IN101 FY20PN88658IN101.dwg FIRST FLOOR FINISH PLAN - OVERALL IN101A FY20PN88658IN101A.dwg FIRST FLOOR FINISH PLAN - AREA A IN101B FY20PN88658IN101B.dwg FIRST FLOOR FINISH PLAN - AREA B IN102 FY20PN88658IN102.dwg SECOND FLOOR FINISH PLAN - OVERALL IN102A FY20PN88658IN102A.dwg SECOND FLOOR FINISH PLAN - AREA A IN102B FY20PN88658IN102B.dwg SECOND FLOOR FINISH PLAN - AREA B IN401 FY20PN88658IN401.dwg ENLARGED FINISH PLANS IN501 FY20PN88658IN501.dwg TRANSITION DETAILS IN502 FY20PN88658IN502.dwg TRANSITION DETAILS IN601 FY20PN88658IN601.dwg FINISH LEGEND IN602 FY20PN88658IN602.dwg ROOM FINISH SCHEDULE IF101 FY20PN88658IF101.dwg FIRST FLOOR FURNITURE PLAN - OVERALL IF101A FY20PN88658IF101A.dwg FIRST FLOOR FURNITURE PLAN - AREA A IF101B FY20PN88658IF101B.dwg FIRST FLOOR FURNITURE PLAN - AREA B IF102 FY20PN88658IF102.dwg SECOND FLOOR FURNITURE PLAN - OVERALL IF102A FY20PN88658IF102A.dwg SECOND FLOOR FURNITURE PLAN - AREA A IF102B FY20PN88658IF102B.dwg SECOND FLOOR FURNITURE PLAN - AREA B IF601 FY20PN88658IF601.dwg FURNITURE SCHEDULES
INTERIORS
00 01 15 ATTACHMENT 4 of 8
IG101 FY20PN88658IG101.dwg FIRST FLOOR SIGNAGE PLAN - OVERALL IG101A FY20PN88658IG101A.dwg FIRST FLOOR SIGNAGE PLAN - AREA A IG101B FY20PN88658IG101B.dwg FIRST FLOOR SIGNAGE PLAN - AREA B IG102 FY20PN88658IG102.dwg SECOND FLOOR SIGNAGE PLAN - OVERALL IG102A FY20PN88658IG102A.dwg SECOND FLOOR SIGNAGE PLAN - AREA A IG102B FY20PN88658IG102B.dwg SECOND FLOOR SIGNAGE PLAN - AREA B IG601 FY20PN88658IG601.dwg SIGNAGE SCHEDULE
FA001 FY20PN88658FA001.dwg FIRE ALARM GENERAL NOTES AND LEGEND FA101A FY20PN88658FA101A.dwg FIRST FLOOR FIRE ALARM FLOOR PLAN - AREA A FA101B FY20PN88658FA101B.dwg FIRST FLOOR FIRE ALARM FLOOR PLAN - AREA B FA101C FY20PN88658FA101C.dwg FIRST FLOOR FIRE ALARM FLOOR PLAN - AREA C FA102A FY20PN88658FA102A.dwg SECOND FLOOR FIRE ALARM FLOOR PLAN - AREA A FA102B FY20PN88658FA102B.dwg SECOND FLOOR FIRE ALARM FLOOR PLAN - AREA B FA501 FY20PN88658FA501.dwg FIRE ALARM SEQUENCE OF OPERATIONS MATRIX FA502 FY20PN88658FA502.dwg FIRE ALARM RISER DIAGRAM
FX001 FY20PN88658FX001.dwg FIRE SUPPRESSION GENERAL NOTES FX101A FY20PN88658FX101A.dwg FIRST FLOOR FIRE SUPPRESSION FLOOR PLAN - AREA A FX101B FY20PN88658FX101B.dwg FIRST FLOOR FIRE SUPPRESSION FLOOR PLAN - AREA B FX101C FY20PN88658FX101C.dwg FIRE FLOOR FIRE SUPPRESSION FLOOR PLAN - AREA C FX102A FY20PN88658FX102A.dwg SECOND FLOOR FIRE SUPPRESSION FLOOR PLAN - AREA A FX102B FY20PN88658FX102B.dwg SECOND FLOOR FIRE SUPPRESSION FLOOR PLAN - AREA B
FX501 FY20PN88658FX501.dwg FIRE SUPPRESSION DETAILS FX502 FY20PN88658FX502.dwg FIRE SUPPRESSION DETAILS
P-001 FY20PN88658P-001.dwg GENERAL NOTES AND LEGENDS PU100A FY20PN88658PU100A.dwg UNDERGROUND DWV PLAN - AREA A PU100B FY20PN88658PU100B.dwg UNDERGROUND DWV PLAN - AREA B PW101A FY20PN88658PW101A.dwg FIRST FLOOR DWV PLAN - AREA A PW101B FY20PN88658PW101B.dwg FIRST FLOOR DWV PLAN - AREA B PW102A FY20PN88658PW102A.dwg SECOND FLOOR DWV PLAN - AREA A PW102B FY20PN88658PW102B.dwg SECOND FLOOR DWV PLAN - AREA B PW103A FY20PN88658PW103A.dwg ROOF PLAN - AREA A PW103B FY20PN88658PW103B.dwg ROOF PLAN - AREA B PL101A FY20PN88658PL101A.dwg FIRST FLOOR SUPPLY PLAN - AREA A PL101B FY20PN88658PL101B.dwg FIRST FLOOR SUPPLY PLAN - AREA B PL102A FY20PN88658PL102A.dwg SECOND FLOOR SUPPLY PLAN - AREA A PL102B FY20PN88658PL102B.dwg SECOND FLOOR SUPPLY PLAN - AREA B P-401 FY20PN88658P-401.dwg ENLARGED PLANS P-501 FY20PN88658P-501.dwg DETAILS P-502 FY20PN88658P-502.dwg DETAILS P-503 FY20PN88658P-503.dwg DETAILS P-504 FY20PN88658P-504.dwg DETAILS P-601 FY20PN88658P-601.dwg SCHEDULES P-701 FY20PN88658P-701.dwg RISER DIAGRAMS P-702 FY20PN88658P-702.dwg RISER DIAGRAMS
FX401 FY20PN88658FX401.dwg
FIRE SUPPRESSION CLEAN AGENT ENLARGED PLAN AND SEQUENCE OF
OPERATIONS MATRIX
FIRE ALARM
FIRE SUPPRESSION
PLUMBING
00 01 15 ATTACHMENT 5 of 8
M-001 FY20PN88658M-001.dwg MECHANICAL LEGEND AND GENERAL NOTES MH101A FY20PN88658MH101A.dwg FIRST FLOOR DUCT PLAN - AREA A MH101B FY20PN88658MH101B.dwg FIRST FLOOR DUCT PLAN - AREA B MH102A FY20PN88658MH102A.dwg SECOND FLOOR DUCT PLAN - AREA A MH102B FY20PN88658MH102B.dwg SECOND FLOOR DUCT PLAN - AREA B MH103A FY20PN88658MH103A.dwg ROOF DUCT PLAN - AREA A MH103B FY20PN88658MH103B.dwg ROOF DUCT PLAN - AREA B MP101A FY20PN88658MP101A.dwg 1ST FLOOR PIPING PLAN - AREA A MP101B FY20PN88658MP101B.dwg 1ST FLOOR PIPING PLAN - AREA B MP102A FY20PN88658MP102A.dwg 2ND FLOOR PIPING PLAN - AREA A MP102B FY20PN88658MP102B.dwg 2ND FLOOR PIPING PLAN - AREA B MP103A FY20PN88658M103A.dwg ROOF PIPING PLAN - AREA A MP103B FY20PN88658M103B.dwg ROOF PIPING PLAN - AREA B M-301 FY20PN88658M-301.dwg SECTIONS M-302 FY20PN88658M-302.dwg SECTIONS M-401 FY20PN88658M-401.dwg ENLARGED FLOOR PLANS M-402 FY20PN88658M-402.dwg ENLARGED FLOOR PLANS M-501 FY20PN88658M-501.dwg MECHANICAL DETAILS M-502 FY20PN88658M-502.dwg MECHANICAL DETAILS M-503 FY20PN88658M-503.dwg MECHANICAL DETAILS M-504 FY20PN88658M-504.dwg MECHANICAL DETAILS M-505 FY20PN88658M-505.dwg MECHANICAL DETAILS M-601 FY20PN88658M-601.dwg MECHANICAL SCHEDULES M-602 FY20PN88658M-602.dwg MECHANICAL SCHEDULES M-603 FY20PN88658M-603.dwg MECHANICAL SCHEDULES M-604 FY20PN88658M-604.dwg MECHANICAL SCHEDULES M-701 FY20PN88658M-701.dwg FLOW DIAGRAMS M-702 FY20PN88658M-702.dwg FLOW DIAGRAMS M-800 FY20PN88658M-800.dwg CONTROL SYMBOLS & ABBREVIATIONS M-801 FY20PN88658M-801.dwg CONTROL DIAGRAMS M-802 FY20PN88658M-802.dwg CONTROL DIAGRAMS M-803 FY20PN88658M-803.dwg CONTROL DIAGRAMS M-804 FY20PN88658M-804.dwg CONTROL DIAGRAMS M-805 FY20PN88658M-805.dwg CONTROL DIAGRAMS M-806 FY20PN88658M-806.dwg CONTROL DIAGRAMS M-807 FY20PN88658M-807.dwg CONTROL DIAGRAMS M-808 FY20PN88658M-808.dwg CONTROL DIAGRAMS
E-001 FY20PN88658E-001.dwg ELECTRICAL LEGEND EG101A FY20PN88658EG101.dwg FIRST FLOOR GROUNDING PLAN - AREA A EG101B FY20PN88658EG101B.dwg FIRST FLOOR GROUNDING PLAN - AREA B EG102A FY20PN88658EG102A.dwg SECOND FLOOR GROUNDING PLAN - AREA A EG102B FY20PN88658EG102B.dwg SECOND FLOOR GROUNDING PLAN - AREA B EG103A FY20PN88658EG103A.dwg LIGHTNING PROTECTION PLAN - AREA A EG103B FY20PN88658EG103B.dwg LIGHTNING PROTECTION PLAN - AREA B EG400 FY20PN88658EG400.dwg LIGHTNING PROTECTION AND GROUNDING ENLARGED PLAN EG401 FY20PN88658EG401.dwg SITE LIGHTNING PROTECTION AND GROUNDING PLAN EG601 FY20PN88658EG601.dwg GROUNDING RISER DIAGRAM EL101A FY20PN88658EL101A.dwg FIRST FLOOR LIGHTING PLAN - AREA A
MECHANICAL
ELECTRICAL
00 01 15 ATTACHMENT 6 of 8
EL101B FY20PN88658EL101B.dwg FIRST FLOOR LIGHTING PLAN - AREA B EL102A FY20PN88658EL102A.dwg SECOND FLOOR LIGHTING PLAN - AREA A EL102B FY20PN88658EL102B.dwg SECOND FLOOR LIGHTING PLAN - AREA B EL401 FY20PN88658EL401.dwg LIGHTING SECTIONS EL402 FY20PN88658EL402.dwg LOBBY AND VESTIBULE LIGHTING PLAN EL501 FY20PN88658EL501.dwg LIGHTING PLATES EL502 FY20PN88658EL502.dwg LIGHTING PLATES EL503 FY20PN88658EL503.dwg LIGHTING PLATES EL701A FY20PN88658EL701A.dwg FIRST FLOOR NORMAL LIGHTING PLAN POINT BY POINT - AREA A EL701B FY20PN88658EL701B.dwg FIRST FLOOR NORMAL LIGHTING PLAN POINT BY POINT - AREA B EL702A FY20PN88658EL702A.dwg SECOND FLOOR NORMAL LIGHTING PLAN POINT BY POINT - AREA A EL702B FY20PN88658EL702B.dwg SECOND FLOOR NORMAL LIGHTING PLAN POINT BY POINT - AREA B EL703 FY20PN88658EL703.dwg LIGHTING FIXTURE SCHEDULE EL711A FY20PN88658EL711A.dwg FIRST FLOOR EMERGENCY LIGHTING PLAN POINT BY POINT - AREA A EL711B FY20PN88658EL711B.dwg FIRST FLOOR EMERGENCY LIGHTING PLAN POINT BY POINT - AREA B EL712A FY20PN88658EL712A.dwg SECOND FLOOR EMERGENCY LIGHTING PLAN POINT BY POINT - AREA A EL712B FY20PN88658EL712B.dwg SECOND FLOOR EMERGENCY LIGHTING PLAN POINT BY POINT - AREA B EP101A FY20PN88658EP101A.dwg FIRST FLOOR POWER PLAN - AREA A EP101B FY20PN88658EP101B.dwg FIRST FLOOR POWER PLAN - AREA B EP102A FY20PN88658EP102A.dwg SECOND FLOOR POWER PLAN - AREA A EP102B FY20PN88658EP102B.dwg SECOND FLOOR POWER PLAN - AREA B EP401 FY20PN88658EP401.dwg ENLARGED POWER PLANS EP402 FY20PN88658EP402.dwg ENLARGED POWER PLANS EP403 FY20PN88658EP403.dwg ENLARGED POWER PLANS ES101 FY20PN88658ES101.dwg ELECTRICAL SITE PLAN EM101A FY20PN88658EM101A.dwg FIRST FLOOR ELECTRICAL MECHANICAL PLAN - AREA A EM101B FY20PN88658EM101B.dwg FIRST FLOOR ELECTRICAL MECHANICAL PLAN - AREA B EM102A FY20PN88658EM102A.dwg SECOND FLOOR ELECTRICAL MECHANICAL PLAN - AREA A EM102B FY20PN88658EM102B.dwg SECOND FLOOR ELECTRICAL MECHANICAL PLAN - AREA B EM103A FY20PN88658EM103A.dwg ROOF ELECTRICAL MECHANICAL PLAN - AREA A EM103B FY20PN88658EM103B.dwg ROOF ELECTRICAL MECHANICAL PLAN - AREA B E-501 FY20PN88658E-501.dwg ELECTRICAL DETAILS E-502 FY20PN88658E-502.dwg ELECTRICAL DETAILS E-503 FY20PN88658E-503.dwg ELECTRICAL DETAILS E-601 FY20PN88658E-601.dwg ONE-LINE DIAGRAM E-701 FY20PN88658E-701.dwg ELECTRICAL GENERAL SCHEDULES E-702 FY20PN88658E-702.dwg ELECTRICAL PANEL SCHEDULES E-703 FY20PN88658E-703.dwg ELECTRICAL PANEL SCHEDULES E-704 FY20PN88658E-704.dwg ELECTRICAL PANEL SCHEDULES E-705 FY20PN88658E-705.dwg ELECTRICAL PANEL SCHEDULES E-706 FY20PN88658E-706.dwg ELECTRICAL PANEL SCHEDULES E-707 FY20PN88658E-707.dwg ELECTRICAL PANEL SCHEDULES E-708 FY20PN88658E-708.dwg ELECTRICAL PANEL SCHEDULES E-709 FY20PN88658E-709.dwg ELECTRICAL PANEL SCHEDULES E-710 FY20PN88658E-710dwg ELECTRICAL PANEL SCHEDULES E-711 FY20PN88658E-711.dwg ELECTRICAL PANEL SCHEDULES E-712 FY20PN88658E-712.dwg ELECTRICAL PANEL SCHEDULES E-713 FY20PN88658E-713.dwg ELECTRICAL PANEL SCHEDULES E-714 FY20PN88658E-714.dwg ELECTRICAL PANEL SCHEDULES
TA-001 FY20PN88658TA-001.dwg AUDIOVISUAL GENERAL NOTES, SYMBOLS & ABBREVIATIONS
AUDIOVISUAL
00 01 15 ATTACHMENT 7 of 8
TA-101A FY20PN88658TA-101A.dwg AUDIOVISUAL FIRST FLOOR PLAN - AREA A TA-101B FY20PN88658TA-101B.dwg AUDIOVISUAL FIRST FLOOR PLAN - AREA B TA-102A FY20PN88658TA-102A.dwg AUDIOVISUAL SECOND FLOOR PLAN - AREA A TA-102B FY20PN88658TA-102B.dwg AUDIOVISUAL SECOND FLOOR PLAN - AREA B TA-111A FY20PN88658TA-111A.dwg AUDIOVISUAL FIRST FLOOR RCP - AREA A TA-111B FY20PN88658TA-111B.dwg AUDIOVISUAL FIRST FLOOR RCP - AREA B TA-112A FY20PN88658TA-112A.dwg AUDIOVISUAL SECOND FLOOR RCP - AREA A TA-112B FY20PN88658TA-111B.dwg AUDIOVISUAL SECOND FLOOR RCP - AREA B TA-501 FY20PN88658TA-501.dwg AUDIOVISUAL ELEVATIONS TA-502 FY20PN88658TA-502.dwg AUDIOVISUAL ELEVATIONS TA-503 FY20PN88658TA-503.dwg AUDIOVISUAL ELEVATIONS TA-504 FY20PN88658TA-504.dwg AUDIOVISUAL ELEVATIONS TA-505 FY20PN88658TA-505.dwg AUDIOVISUAL ELEVATIONS TA-506 FY20PN88658TA-506.dwg AUDIOVISUAL ELEVATIONS TA-600 FY20PN88658TA-600.dwg AUDIOVISUAL SCHEDULES TA-601 FY20PN88658TA-601.dwg AUDIOVISUAL RISER DIAGRAMS
T-001 FY20PN88658T-001.dwg TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS & ABBREVIATIONS T-100 FY20PN88658T-100.dwg TELECOMMUNICATION SITE PLAN T-101A FY20PN88658T-101A.dwg TELECOMMUNICATIONS FIRST FLOOR PLAN - AREA A T-101B FY20PN88658T-101B.dwg TELECOMMUNICATIONS FIRST FLOOR PLAN - AREA B T-102A FY20PN88658T-103B.dwg TELECOMMUNICATIONS SECOND FLOOR PLAN - AREA A T-102B FY20PN88658T-102B.dwg TELECOMMUNICATIONS SECOND FLOOR PLAN - AREA B T-103A FY20PN88658T-103A.dwg TELECOMMUNICATIONS ROOF PLAN - AREA A T-103B FY20PN88658T-103B.dwg TELECOMMUNICATIONS ROOF PLAN - AREA B T-111A FY20PN88658T-111A.dwg TELECOMMUNICATIONS FIRST FLOOR REFLECTED CEILING PLAN - AREA A T-111B FY20PN88658T-111B.dwg TELECOMMUNICATIONS FIRST FLOOR REFLECTED CEILING PLAN - AREA B T-112A FY20PN88658T-112A.dwg TELECOMMUNICATIONS SECOND FLOOR REFLECTED CEILING PLAN - AREA A T-112B FY20PN88658TA-112B.dwg TELECOMMUNICATIONS SECOND FLOOR REFLECTED CEILING PLAN - AREA B
T-401 FY20PN88658T-401.dwg TELECOMMUNICATION ENLARGED PLAN T-402 FY20PN88658T-402.dwg TELECOMMUNICATION ENLARGED PLAN T-403 FY20PN88658T-403.dwg TELECOMMUNICATION ENLARGED PLAN T-404 FY20PN88658T-404.dwg TELECOMMUNICATION ENLARGED PLAN T-501 FY20PN88658T-501.dwg TELECOMMUNICATION DETAILS T-502 FY20PN88658T-502.dwg TELECOMMUNICATION DETAILS T-503 FY20PN88658T-503.dwg TELECOMMUNICATION SCHEDULE T-504 FY20PN88658T-504.dwg TELECOMMUNICATION SCHEDULE T-601 FY20PN88658T-601.dwg TELECOMMNICATIONS ONE-LINE DIAGRAM T-602 FY20PN88658T-602.dwg TELECOMMNUICATION ONE-LINE DIAGRAM T-603 FY20PN88658T-603.dwg TELECOMUNICATIONS PDS
TY-001 FY20PN88658TY001.dwg SECURITY GENERAL NOTES, SYMBOLS & ABBREVIATIONS TY-604 FY20PN88658TY604.dwg SECURITY DETAILS TY-101A FY20PN88658TY10A.dwg SECURITY FIRST FLOOR PLAN - AREA A TY-101B FY20PN88658T-101B.dwg SECURITY FIRST FLOOR PLAN - AREA B TY-102A FY20PN88658TY102A.dwg SECURITY SECOND FLOOR PLAN - AREA A TY-102B FY20PN88658TY102B.dwg SECURITY SECOND FLOOR PLAN - AREA B TY-103B FY20PN88658T-103B.dwg SECURITY ROOF PLAN - AREA B
T-112C FY20PN88658T-112C.dwg
TELECOMMUNICATIONS SECOND FLOOR SWA RAISED ACCESS FLOOR PLAN - AREA
A
TELECOMMUNICATIONS
SECURITY
00 01 15 ATTACHMENT 8 of 8
****Amendment 0005**** Sheet reference is hereby removed by way of Amendment 0005.
****Amendment 0005****
SECTION 01 00 60
SECURITY PROCEDURES GUIDE
10/2018
PART 1 GENERAL
This Security Procedures Guide is issued for all work on SOTF.
1.1 REFERENCE
a. AR 380-5, DA Information Security Program Regulation, dated 29 September 2000.
b. DOD 5220.22-M, Industrial Security Manual, dated February 2006.
1.2 PURPOSE
The purpose of this Security Procedures Guide is to provide guidance and established procedures for the uniform handling and control of all information on SOTF projects that are originated, dispatched and/or received by any SOTF project element .
1.3 APPLICABILITY
This guide is applicable to all personnel granted access to information and material related to Security Operations Training Facility (SOTF).
Access to project data and information is on a strict "NEED TO KNOW" basis. In all cases, the most stringent requirements of Reference 2a and 2b, and this manual apply. SOTF project elements will be subject to unannounced and random inspections by SOTF Security Personnel to ensure compliance with this manual.
1.4 POCS
The SOTF Security Manager is Mr. Joshua B. Brown, telephone (910) 643-0831. The SOTF Chief of Engineering Operations is Mr. Roger Whatley, telephone (910) 643-5427, and the Engineering Project Manager is Mr.
Matthew Black, telephone (910) 643-5253, matthew.d.black4.civ@mail.mil.
1.5 BACKGROUND
a. SOTF is a Department of the Army secure training facility.
Design and construction drawings, specifications, and design analysis of this SOTF project cannot be provided to any other country, except as approved in writing by the SOTF Security Manager.
PART 2 SPECIAL SECURITY PROCEDURES
2.1 RESPONSIBILITIES
a. Commanders and/or heads of organizations in which SOTF material is originated, dispatched, received and/or stored, will ensure that this Security Procedures Guide is on hand and that all SOTF project personnel are thoroughly familiar with its contents.
b. Each individual entrusted with SOTF documents regardless of
SECTION 01 00 60 Page 1 classification or protective marking is responsible for the proper control, accountability, and safeguarding of same.
2.2 ACCESS
a. Access to "For Official Use Only" (FOUO) information on SOTF projects will be limited to U.S. Citizens who have a valid "need to know". In the event that access to classified information is required, an additional security procedures guide will be furnished.
b. To gain access to the SOTF site and/or project information, a written, email, or fax request must be made to the SOTF Project Manager at least 5 business days in advance (see Page 6 for written form). A separate request must be made for each site visit. In the request, the Contractor must show each employee's full name, full SSN, and company name, and must also indicate that each employee either;
1) Possesses a valid Department of Defense Common Access Card (CAC)
2) Possesses a valid Fort Bragg AIE pass
3) Possesses a valid United States-issued tourist passport
4) Is authorized to work in the United States as verified through the company's participation in the Department of Homeland Security's (DHS) E-Verify system
If the company uses option 4 (E-Verify), the company must also provide the SOTF Project Manager with a letter indicating that the company participates in E-Verify. The letter must be on company letterhead and be signed by the company human resources officer or other authorized officer. Companies should not provide copies of employees' individual DHS E-Verify reports.
c. Once access has been granted, no SOTF information or site access will be given to the individual until he or she has signed a Security Briefing Form (Page 4). This form will be completed and signed by the Contractor and Security personnel prior to entry to SOTF. The original form will be sent to the SOTF Security Manager and will be kept on file at SOTF.
(1) Use of Escorts: Personnel entering the Security Operations
Training Facility will be escorted by a facility member or by a security guard. Use of escorts within the facility is done routinely for contracted and other visiting personnel regardless of their security clearance level.
(2) Arrival at SOTF: Contractor/visitor shall notify (by email or phone) the Government's Contracting Officer's Representative (COR), Project Manager (PM), or designated QA personnel of their anticipated arrival time on SOTF each day of contract performance.
If the Contractor does not arrive at SOTF within 90 minutes of their scheduled arrival time, and does not coordinate directly with the COR, PM, or QA for any such late arrival, the designated escort for the day will be released for other duties and will no longer be available to the Contractor on that day. No such instances may be used by the Contractor as Government caused delay and the Government will not extend the period of performance.
SECTION 01 00 60 Page 2
(3) Normal Work Hours: When working or conducting business within the main part of the SOTF compound, work hours for contract personnel are 0730 - 1600, Monday through Friday. Contractor personnel shall report to the SOTF Lamont Road Visitor Center at 0730 to exchange valid picture identification for a SOTF visitor badge. All Contractor vehicles will be searched each day starting at 0730.
Once the badge exchange and vehicle search is complete, the Contractor shall convoy with the escort to the job site. The Contractor must exit the SOTF compound by 1600 each day.
Exceptions, if approved by the Project Manager, must be coordinated two work days in advance.
2.3 INFORMATION CONTROLS
a. All project documents will be classified a minimum of 'For Official Use Only' (FOUO).
b. Work Areas: A separate work area will be established where large volumes of project information are processed, discussed, or stored.
This is required to preclude compromise of project information by unauthorized personnel.
c. Communications: Nonsecure telephone circuits shall not be used to discuss any sensitive SOTF information or data. Nonsecure facsimile equipment may be used only for the transmission of unclassified SOTF information.
2.4 RELEASE OF INFORMATION
Release of Information: Public release of any SOTF information regardless of classification is NOT authorized. Any attempts by unauthorized personnel to obtain SOTF information or data will be reported immediately to the SOTF Security Manager by the most expeditious means available.
2.5 STORAGE
Unclassified SOTF project information must be stored in a locked, segregated container located in the SOTF work area. At no time will SOTF information be left unsecured within the work area when it is not being worked on. FOUO cover sheets should be used whenever appropriate.
2.6 TRANSMISSION
a. "FOR OFFICIAL USE ONLY" material may be sent by Certified mail or US Express mail.
b. All envelopes or packages containing SOTF "FOUO" material will be addressed to the official government activity or organization with attention to a specific individual by name. Return address will note specific individual in attention line. The envelope will be clearly marked with the caveat "DELIVER TO AND TO BE OPENED BY ADDRESSEE ONLY". This caveat will be displayed in letters at least ¼ inch in height. The protective marking "FOR OFFICIAL USE ONLY" shall NOT be stamped on the envelope. The envelope shall be carefully sealed with tape.
SECTION 01 00 60 Page 3
SECURITY BRIEFING
I,________________________________________________, understand that, by virtue of assignment, employment, or association on this sensitive Department of the Army Facility/Project, of the Security Operations Training Facility (SOTF), I may be granted access, if properly authorized/security cleared, to information, material, and plans which concern the security of the Unites States of America and which are either sensitive or classified by order of the President or as authorized by statute.
1. I understand that I may never divulge, publish, or reveal by writing, word, conduct, or otherwise, to any unauthorized person, any classified or sensitive information relating to the SOTF Facility/Project, its personnel, fiscal data or security measures without prior consent of the Director, SOTF or his designated representative.
2. I understand that the burden is upon me to ascertain whether or not information is classified, and, if so, who is authorized to receive it. I will, therefore, obtain the decision of the authorizing officials of the SOTF Security Office on these matters before disclosing such information.
3. I must submit for review to an appropriate DOD official prior to discussing with or showing to any publisher, literary agent, architectural firm, or other unauthorized persons, all manuscripts, articles, speeches, resumes, all architectural design drawings and papers, written or drawn by me or in conjunction with others, which contain or are derived from information or material obtained by virtue of my assignment, employment or association with the SOTF Facility/Project. I understand that the purpose of such review is to ensure that no sensitive or classified information or material obtained by virtue of my assignment, employment or association with this facility/project contained therein. I further understand that such review shall not constitute nor shall be represented as a verification or factual accuracy or an endorsement of the opinions contained in any such manuscripts, articles, speeches, resumes, or papers.
4. I understand that all classified or sensitive information acquired by me in connection with my assignment, employment or association with this facility/project remains the property of the Government of the United States of America, and I must surrender, upon demand by appropriate DOD official, or upon separation from this SOTF Facility/Project, any material in my possession relating to such information.
5. I must report without delay to my superior the details or circumstances of any case which comes within my knowledge wherein an unauthorized person has obtained or is attempting to obtain classified, or sensitive information or material, or wherein such information or material may be or is being disclosed or removed in an authorized manner.
6. I understand that my compliance with all the obligations required to protect classified information may be a consideration of my continuing assignment, employment or association with this facility/project. I understand that any failure to so comply may subject me to administrative action including termination of my assignment, employment or association with this facility/project.
7. I have read and understand the provisions of the Espionage Act, Sections, 793, 794, and 798, of Title 18, United States Code, and I am aware of the penalties provided for any violation thereof. I understand that the provisions of the Espionage Act apply during my assignment, employment or
SECTION 01 00 60 Page 4 association with the SOTF facility/project.
8. I have read and understand the contents of this briefing. I have read and understand Section 1001, of Title 18, United States Code, regarding the making of false, fictitious, or fraudulent statements or representations, and I am aware of the penalties provided for any violation thereof.
PERSON CONDUCTING BRIEFING PERSON BEING BRIEFED
(DATE) (DATE)
(PRINTED OR TYPED NAME) (PRINTED OR TYPED NAME)
(SSAN) (SSAN)
(ORGANIZATION/FIRM) (ORGANIZATION/FIRM)
(SIGNATURE)
NOTICE: THE PRIVACY ACT, 5 U.S.C. 552a, requires that federal agencies inform individuals, at the time information is solicited from them, whether the disclosure is mandatory or voluntary, by what authority such information is solicited, and what uses will be made of the information. You are hereby advised that the authority for soliciting your Social Security Account Number (SSAN) is Executive Order 9397. Your SSAN will be used to identify you precisely when it is necessary to certify that you have access to the information indicated above. While your disclosure of SSAN is not mandatory, your failure to do so may delay the processing of such certification.
SECTION 01 00 60 Page 5
PART 3 REQUEST FOR ACCESS
SOTF PROJECT:__________________________________________________________
DATE:_______________________________________
ORGANIZATION___________________________________________________________
NAME & TITLE OF NOMINEE____________________
SSN____________________________________TELEPHONE________________________
ACCESS IS REQUIRED FOR PROJECT INFORMATION_______AND/OR SOTF SITE
VISIT________.
REQUESTED ACCESS LEVEL__________________
JUSTIFICATION/COMMENTS_________________________________________________
DATE/TIME OF SITE
VISIT________________________________________________
REQUESTOR______________________________________________________________
To be completed by requestors Security Officer:
SECURITY CLEARANCE OF
NOMINEE__________________________________________
CLEARANCE GRANTED
BY___________________________ON________________________
SECURITY OFFICER
SIGNATURE
DATE
To be competed by SOTF Access Approving Official:
ACCESS TO SOTF PROJECT INFORMATION___________AND/OR SOTF SITE _________IS
APPROVED/DISAPPROVED.
APPROVED ACCESS LEVEL:________________________
COMMENTS____________________________________________________________________
APPROVING OFFICIAL
SIGNATURE
DATE
-- End of Section --
SECTION 01 00 60 Page 6
SECTION 01 10 00.10 38
SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
11/18
PART 1 GENERAL
1.1 DEPARTMENT OF ARMY MANDATED SECURITY REQUIREMENTS
The Contractor shall be required to comply with the following security requirements mandated by the Department of the Army:
Short-term employees (working on site less than or equal to 6 months): If a criminal history is found, the employee MAY not be allowed to work at the project site at the sole discretion of the Government.
Long-term employees (working on site more than 6 months):
ALL of the following is required WHEN REPORTING FOR WORK -
a) A completed OMB Form No. 3206-0182 (also designated as Optional Form 306).
b) A completed OMB Form No. 3206-0191 (also designated as Standard Form 85P).
c) A resume.
The Government will use all provided information to perform a National Agency Check and Inquiries (NACI) check and will pay the required fee.
The Contractor shall be responsible for furnishing to each employee and for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer or his/her designated representative. All prescribed identification shall immediately be delivered to the Contracting Officer or his/her designated representative for cancellation upon the release of any employee.
(End of Clause)
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 37 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Certificate of Insurance
Within 24 hours of conclusion of physical tests, submit 5 copies of test results including calibration curves and results of calibration tests.
SECTION 01 10 00.10 38 Page 1
SD-03 Product Data
PROGRESS SCHEDULE
SD-07 Certificates
Completion of Corps CQC Course
Letter Appointing Superintendent
Qualifications of the commercial testing laboratory or Contractor's testing laboratory/facilities G
1.3 PERFORMANCE AND PAYMENT BONDS
Each bidder shall include his premiums for performance and payment bonds under the appropriate, "Performance and Payment Bonds" contract line item of the Bidding Schedule. Payment to the Contractor therefore, shall not exceed the bid price and shall be made in accordance with the Contract Clause entitled "PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS." Any additional amount bid in excess of the actual bond premium will be included in the final pay estimate for this contract.
Each bidder shall include in his bid premiums for performance and payment bonds. Payment shall be made in accordance with the Contract Clause entitled "PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS." Any additional amount bid in excess of the actual bond premium will be included in the final pay estimate for this contract.
Each bidder shall include his premiums for performance and payment bonds in his bid. Payment to the Contractor therefore, shall be made in accordance with the Contract Clause entitled in accordance with the Contract Clause entitled "PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS." Any additional amount included in the Contractor's bid which is in excess of the actual bond premium will be included in the final pay estimate for this contract.
(End of Clause)
1.4 WATER CONSERVATION
Water is one of our valuable natural resources. Accordingly, the Contractor shall be judicious in its use in the performance of the work as specified. Water needed for compaction of roadway and/or foundation materials, and dust control shall be obtained from uncontrolled stream flow instead of potable supply sources to the extent available and suitable as determined by the Contracting Officer or his/her designated representative.
(End of Clause)
1.5 BULLETIN BOARD
Within one (1) calendar day after commencement of work under this contract, the Contractor shall provide at the job site a weatherproof, glass-covered bulletin board for displaying the Fair Employment poster, wage rates, posters and safety bulletins as noted in Section 01 35 26, paragraph DISPLAY OF SAFETY INFORMATION. The bulletin board shall be located in a conspicuous place, easily accessible to all employees, and
SECTION 01 10 00.10 38 Page 2 legible copies of the aforementioned data shall be displayed until work under the contract is complete. No direct payment will be made for the bulletin board. Refer to Specification Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS, paragraph 1.9 title "Display of Safety Information" for additional information.
(End of Clause)
1.6 RETAINAGE FOR UNTIMELY SUBMISSION OF SUBCONTRACTING REPORTS
(a) In accordance with Contract Clause 52.219-9, Small Business Subcontracting Plan, and 52.219-16, Liquidated Damages - Subcontracting Plan, retainage will be withheld from progress payments in an amount sufficient to protect the Government's ability to assess liquidated damages in accordance with Clause 52.219-16 for the contractor's failure to timely submit Standard Form 294, Subcontracting Report for Individual Contracts, and Standard Form 295, Summary Subcontract Report, reports.
(b) The retainage will be determined in accordance with the following formula:
Total dollar amount for subcontracting to small business multiplied by percentage of actual progress on the contract shall be withheld from the next progress payment due after the Contractor fails to submit a required report. If one or more reports have been submitted before such failure, formula for determining the amount of retainage will be adjusted by deducting any amounts reported as subcontracted to small business from the total dollar amount proposed to be subcontracted and the difference multiplied by the percentage of actual progress.
(c) Subcontracting plans are not required--
(1) For contracts or contract modifications that will be performed entirely outside of any State, territory, or possession of the United States, the District of Columbia, and the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .