Ngwsp intake & river pumping plant

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140R4025R0023
Agency
Bureau of Reclamation Department of the Interior
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Y1NE Construction Of Water Supply Facilities
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Interior Bureau of Reclamation is soliciting proposals for the design and construction of the NGWSP Intake & River Pumping Plant located approximately 11 miles west of Farmington, New Mexico. The project encompasses construction of a new raw water pumping plant with a capacity of 71 cubic feet per second and 325 total dynamic head, including sitework, steel manifold piping, a metal building system, concrete structures, four vertical turbine pumping units rated at 900 horsepower each, electrical and SCADA systems, and water quality monitoring equipment. Key contract requirements include selective site demolition, existing channel modifications such as replacing trash rake and sluice gates, installing new gates, constructing a fish barrier weir, and concrete modifications. Evaluation will be based on technical approach, quality control measures, staff qualifications, past performance, safety metrics, and small business participation, with a mandatory minimum small business subcontracting goal of 45.87% for all planned subcontracting dollars. The proposal submission deadline is January 16, 2026, at 1:00 PM Mountain Time, with a second pre-bid site visit held on December 10, 2025, and multiple rounds of questions and answers issued through December 23, 2025.

This solicitation carries no set-aside designation and will be awarded on a firm-fixed-price basis as a single Activity Unit. The contract period of performance extends from April 3, 2026, to October 20, 2028, with the contractor required to begin work within 21 calendar days of award and complete the project within 909 calendar days. The comprehensive price schedule includes 118 contract line items covering demolition, excavation of approximately 34,000 cubic yards, concrete work, electrical infrastructure with 17,000 linear feet of conductors and cables, mechanical equipment installation, and various specialized components and systems. The project location is at the Bureau of Reclamation's Four Corners Construction Office in Farmington, New Mexico, with performance occurring at the San Juan River site in San Juan County. Prevailing wage requirements apply under the Davis-Bacon Act, with wage rates established by the Department of Labor, and contractors must comply with both New Mexico Gross Receipts Tax (6.8125%) and Navajo Nation Gross Receipts Tax (6.00%) requirements, along with all environmental and cultural resource compliance obligations.

Notice text

NGWSP INTAKE & RIVER PUMPING PLANT

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_140R4025R0023_Amd_0007.pdf PDF
River_Intake_and_Pumping_Plant_second_site_visit_attendance_record_0007.pdf PDF
Sol_140R4025R0023_Amd_0006.pdf PDF
140R4025R0023_Questions___Answers_-_Round_4_0006.pdf PDF
Sol_140R4025R0023_Amd_0005.pdf PDF
140R4025R0023_Attachment_1_2_-_00_00_01_-_Specifications_12192025_0005.pdf PDF
140R4025R0023_Questions___Answers_-_Round_3_0005.pdf PDF
140R4025R0023_Attachment_2_7_-_00_00_02_-_Drawings_12192025_0005.pdf PDF
NGWSP_-_River_Intake_PP_Site_Tour_-_8OCTOBER2025_(1)_0004.pdf PDF
140R4025R0023_Questions___Answers_-_Round_2_0004.pdf PDF
140R4025R0023_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM_19SEP25_0004.pdf PDF
Sol_140R4025R0023_Amd_0004.pdf PDF
140R4025R0023_Attachment_2_6_-_00_00_02_-_Drawings_11212025_0004.pdf PDF
140R4025R0023_Attachment_1_1_-_00_00_01_-_Specifications_11212025_0004.pdf PDF
Sol_140R4025R0023_Amd_0003.pdf PDF
Sol_140R4025R0023_Amd_0002.pdf PDF
Intake_and_River_Pumping_Plant_Site_Visit_Sign-in_Sheet_0002.pdf PDF
140R4025R0023_Questions___Answers_-_Round_1_0002.pdf PDF
140R4025R0023_Attachment_2_5_-_00_00_02_Dwgs-B_321-356_22x34_09-24-2025_0001.pdf PDF
Sol_140R4025R0023_Amd_0001.pdf PDF
140R4025R0023_Attachment_2_2_-_00_00_02_Dwgs-B_101-200_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_2_3_-_00_00_02_Dwgs-B_201-285_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4025R0023_Attachment_2_1_-_00_00_02_Dwgs-B_001-100_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM.pdf PDF
140R4025R0023_Attachment_4_-_WD_NM20250040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4025R0023_Attachment_1_-_00_00_01_-_Specifications_09242025.pdf PDF
140R4025R0023_Intake___River_PP_24SEP25.pdf PDF
140R4025R0023_Attachment_3_-_00_00_02A_Geology_04102025.pdf PDF
140R4025R0023_Attachment_8_-_Key_Personnel_Form.docx DOCX document
Sol_140R4025R0023.pdf PDF
140R4025R0023_Attachment_7_-_Experience_Form.docx DOCX document
140R4025R0023_Attachment_2_4_-_00_00_02_Standard_Dwgs-B_286-320_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_9_-_Subcontracting_Plan_Template.docx DOCX document
Show all 34

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Ngwsp intake & river pumping plant Award Award Notice
Ngwsp intake & river pumping plant This notice · Latest solicitation Solicitation
Ngwsp intake & river pumping plant Pre-Solicitation
Ngwsp intake & river pumping plant Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity