This is a Solicitation, Offer, and Award (Standard Form 1442) for a construction project issued by the Bureau of Reclamation's Upper Colorado Region. The solicitation is for the Intake & River Pumping Plant project located approximately 11 miles west of Farmington, New Mexico. The principal components of work include constructing a new river pumping plant with sitework, steel manifold piping, metal building system, concrete structures, vertical turbine pumping units, electrical and SCADA systems, and water quality monitoring equipment. Additional scope involves selective site demolition and demolition of the existing pumping plant, as well as existing channel modifications such as replacing trash rake and sluice gate, installing gates, constructing a fish barrier weir, and concrete modifications.
The project has a performance period from 03/20/2026 to 10/06/2028, with the contractor required to begin work within 21 calendar days of award and complete the project within 909 calendar days. The contract is for a single Activity Unit (AU) with a Firm-Fixed Price (FFP) arrangement. Performance and payment bonds are required, and the solicitation was issued on 09/24/2025 with offers due by 12/19/2025. The delivery location is the Bureau of Reclamation's Four Corners Construction Office in Farmington, New Mexico, with a delivery date of 10/06/2028.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0044021608
Bureau of Reclamation
Upper Colorado Region
Regional Office 125 South State Street, Room 8100
R40
Salt Lake City UT 84138
Amy Loveless 801-524-3790
1x 09/24/2025
140R4025R0023
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The principal components of work for Intake & River Pumping Plant (PP) include, but are not limited to, the following:
A. Construct New River Pumping Plant:
1. Sitework, including cement-bentonite cutoff wall.
2. Steel manifold piping, including connection to existing ductile iron line pipe.
3. Metal building system and foundations.
4. Cast-in-place concrete building structures.
5. Vertical turbine pumping units.
6. Air chambers.
7. Electrical system.
8. SCADA system.
9. Water quality monitoring equipment.
B. Selective site demolition.
C. Demolition of Existing Pumping Plant.
Continued ...
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
21 909 calendar days and complete it within ________________ ________________ calendar days after receiving
12/19/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Ashton Jones
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 119
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R4025R0023
D. Existing channel modifications:
1. Replace trash rake and sluice gate at intake.
2. Install gates.
3. Construct fish barrier weir and return channel.
4. Concrete modifications.
LOCATION OF WORK: At the River Pumping Plant on the San Juan River approximately 11 miles west of
Farmington, NM in San Juan County.
Delivery: 10/06/2028
Delivery Location Code: 0011285648
Bureau of Reclamation-UC-FCCO
Four Corners Construction Office
1235 La Plata Hwy
Farmington NM 87401 US
00010 Intake & River Pumping Plant (PP)
See Specifications (Section J Attachment 1) and
Drawings (Section J Attachments 2-3) for more details.
Quantity (QTY) - One (1)
Unit of Issue - Activity Unit (AU)
Pricing Arrangement - Firm-Fixed Price (FFP)
See Schedule B for the Price Schedule continuation which includes all CLINs and sub-CLINs.
CLIN includes all items and personnel necessary to ensure a turnkey intake and pumping plant to
Reclamation. All inclusive of items, equipment, materials, personnel, specialized personnel, etc.
All invoices against this CLIN must include quantity survey data, if applicable.
Full time safety representative and quality control representative, as well as qualified survey personnel are required.
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 119
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R4025R0023
WATER SUPPLY FACILITIES
Period of Performance: 03/20/2026 to 10/06/2028
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .