NGWSP INTAKE & RIVER PUMPING PLANT Federal contract opportunity
Solicitation number
140R4025R0023
Issued by
Department of the Interior Bureau of Reclamation

About this file

This is a solicitation document for the Navajo-Gallup Water Supply Project (NGWSP) Intake and River Pumping Plant construction project issued by the Bureau of Reclamation's Upper Colorado Region. The project involves constructing a raw water pumping plant with 71 cfs capacity and 325 Total Dynamic Head, located in San Juan County, New Mexico. The solicitation includes detailed requirements for a comprehensive construction effort, with a period of performance from 04/03/2026 to 10/20/2028 and an estimated total contract value based on an extensive price schedule with over 100 contract line items covering various construction activities.

The solicitation establishes minimum small business subcontracting goals, including 45.87% for small businesses, with specific targets for socio-economically disadvantaged, women-owned, HUBZone, veteran-owned, and Indian-owned small businesses. Offerors will be evaluated on technical approach, staff qualifications, quality control, past performance, safety metrics, and small business participation. The procurement will use a best-value source selection method, with oral presentations required and key personnel from the contractor expected to participate. Proposals are due by January 16, 2026, with anticipated award following a comprehensive technical and pricing evaluation process.

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP INTAKE & RIVER PUMPING PLANT, newest first.
File Type Posted
Sol_140R4025R0023_Amd_0007.pdf PDF
River_Intake_and_Pumping_Plant_second_site_visit_attendance_record_0007.pdf PDF
Sol_140R4025R0023_Amd_0006.pdf PDF
140R4025R0023_Questions___Answers_-_Round_4_0006.pdf PDF
Sol_140R4025R0023_Amd_0005.pdf PDF
140R4025R0023_Attachment_1_2_-_00_00_01_-_Specifications_12192025_0005.pdf PDF
140R4025R0023_Questions___Answers_-_Round_3_0005.pdf PDF
140R4025R0023_Attachment_2_7_-_00_00_02_-_Drawings_12192025_0005.pdf PDF
NGWSP_-_River_Intake_PP_Site_Tour_-_8OCTOBER2025_(1)_0004.pdf PDF
140R4025R0023_Questions___Answers_-_Round_2_0004.pdf PDF
140R4025R0023_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM_19SEP25_0004.pdf PDF
140R4025R0023_Attachment_2_6_-_00_00_02_-_Drawings_11212025_0004.pdf PDF
140R4025R0023_Attachment_1_1_-_00_00_01_-_Specifications_11212025_0004.pdf PDF
Sol_140R4025R0023_Amd_0003.pdf PDF
Sol_140R4025R0023_Amd_0002.pdf PDF
Intake_and_River_Pumping_Plant_Site_Visit_Sign-in_Sheet_0002.pdf PDF
140R4025R0023_Questions___Answers_-_Round_1_0002.pdf PDF
140R4025R0023_Attachment_2_5_-_00_00_02_Dwgs-B_321-356_22x34_09-24-2025_0001.pdf PDF
Sol_140R4025R0023_Amd_0001.pdf PDF
140R4025R0023_Attachment_2_2_-_00_00_02_Dwgs-B_101-200_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_2_3_-_00_00_02_Dwgs-B_201-285_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4025R0023_Attachment_2_1_-_00_00_02_Dwgs-B_001-100_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM.pdf PDF
140R4025R0023_Attachment_4_-_WD_NM20250040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4025R0023_Attachment_1_-_00_00_01_-_Specifications_09242025.pdf PDF
140R4025R0023_Intake___River_PP_24SEP25.pdf PDF
140R4025R0023_Attachment_3_-_00_00_02A_Geology_04102025.pdf PDF
140R4025R0023_Attachment_8_-_Key_Personnel_Form.docx DOCX document
Sol_140R4025R0023.pdf PDF
140R4025R0023_Attachment_7_-_Experience_Form.docx DOCX document
140R4025R0023_Attachment_2_4_-_00_00_02_Standard_Dwgs-B_286-320_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_9_-_Subcontracting_Plan_Template.docx DOCX document
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R4025R0023 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Salt Lake City UT 84138

R40

125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation

09/24/20250004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/24/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is issued to:

*Provide Round #2 of the contractor submitted answers with Reclamation responses. There are still some contractor submitted questions that are not included yet and should be included in the next solicitation amendment.

*Provide updated Specifications and Drawings as a result of the questions submitted. See

Updated Section J and Attachments #1.1 & #2.6.

The revised specifications sections are:

00 00 50 Section B

00 01 10 Table of Contents

01 33 00 Submittals

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Ashton Jones

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 34

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R4025R0023/0004

01 57 30 Water Pollution Control

01 57 60 Protected Species

02 41 10 Demolition

03 48 00 Plant Precast Concrete Structures

10 56 29 Pallet Storage Rack

25 00 01 System Control and Monitoring

31 03 10 Diversion and Care of Stream

33 12 71 Vertical Pumping Units

33 12 79 Submersible Pumping Units

51 00 20 I/O Points List

The deleted specification sections are:

07 21 13 Sound Control Batt Insulation

26 26 10 Transformer Load Center

The new specification section is:

01 60 10 Buy American

The revised drawings are:

Sheet # Drawing # Title

127 1695-D-62139 Pumping Plant

Architectural Plan

134 1695-D-62146 Pumping Plant

Architectural Wall Sections

137 1695-D-62149 Pumping Plant

Architectural Door Schedules

239 1695-D-62257 Electrical

Installation Conduit Plan Pumping Plant

249 1695-D-62305 Electrical

Installation Cable and Conduit Schedule

250 1695-D-62306 Electrical

Installation Cable and Conduit Schedule

255 1695-D-62265 P&ID River and

Sluicing Channels

273 1695-D-62283 Electrical and

SCADA SCADA and Network Overview

274 1695-D-62284 Electrical and

SCADA Security and Surveillance

Additional documents provided as information for the bidders by request to Amy Loveless, Contract Specialist, are:

1970 Woodward-Clyde River Diversion Dam and

Pumping Plant Geology Logs

2024 Corrosivity Testing

2024 Geologic and Design Data Report San

Juan Intake and Pumping Plant

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 34

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R4025R0023/0004

2024 NGWSP River PP Geotechnical

Recommendations

20220921 Final BO Navajo Gallup

20250225_BOR_NGWSP_DiversionIntakeDesignMemo

*Provide the updated WD NM20250046 Building San

Juan County, NM. See Updated Section J &

Attachment #5.

*Update Section B.

*Update F.2 52.211-10 Commencement, Prosecution and Completion of Work Alt 1 April 1984 (changes are highlighted).

*Update L.10 52.236-27 Site Visit Construction

Alt 1 February 1995 (changes are highlighted).

*Update L.13 WBR 1452.215-81 Proposal

Instructions Mar 2021 (changes are highlighted).

*Provide the presentation slides from the beginning of the first site visit held 8 October

2025.

Period of Performance: 04/03/2026 to 10/20/2028

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation Document No.

140R4025R0023-0004

Document Title NGWSP Intake & River PP

Continuation of Section B – Supplies or Services and Price

SECTION B – San Juan Lateral – Reach 1 Intake and River Pumping Plant Navajo- Gallup Water Supply Project, New Mexico

PRICE SCHEDULES

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only. Except as provided in contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(d) See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1 of Price Schedule.

(e) Definitions:

CLIN – Contract Line Item Number

(f) Note: In accordance with Section 7-9-3.3 of New Mexico Statutes Annotated (NMSA) 1978 and Section 402 of Navajo Nation’s Business Activity Tax Statute, it is Contractor’s responsibility to ensure that all applicable New Mexico Gross Receipts Tax and Navajo Nation Gross Receipts Tax are included in their price proposal.

(g) In accordance with FAR 52.232-5 (Payments under Fixed-Price Construction Contracts) (b)(2), payment may be approved for materials delivered to Contractor at locations other than the site if Contractor obtains CO approval prior to making arrangements for obtaining the materials.

Contractor shall also be required to complete a “Materials on Hand Certificate” which will certify:

(1) Materials described for use on identified contract.

(2) Materials are clearly marked to identify that they belong to contract cited.

(3) Full title for those materials vested in Prime Contractor sited.

(4) Materials are free of liens and encumbrances.

(5) Materials are properly store, secured, and protected against loss or damage.

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

1 WBR

1452.232-81

Mobilization and Preparatory Work

For the lump sum of $

2 01 31 30 Contract Document Management System

For the lump sum of $

3 01 33 26 Electrical Drawings and Data

For the lump sum of $

4 01 52 10 Government Field Laboratory

For the lump sum of $

5 01 56 15 Utility Crossing Investigation

For the lump sum of $

6 01 78 30 As-Built Drawings For the lump sum of $200,000

7 01 78 30 Final Drawings For the lump sum of $200,000

8 01 78 30 Operations and Maintenance (O&M) Manuals

For the lump sum of $200,000

9 01 80 15 Commissioning For the lump sum of

10 02 41 00 Demolition of Existing Installations

For the lump sum of $

11 03 20 30 Drilling Holes for Anchor Bars and Epoxy Grouting Bars in Place

590 lf $ $

12 03 30 00 Cast-in-Place Concrete

2700 yd3 $ $

13 03 30 00 RMSC

(Reinforced Mass Concrete)

525 yd3 $ $

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

14 03 30 00 Lean Concrete 1050 yd3 $ $

15 03 30 00 Concrete Pan 400 lf $ $

16 03 30 00 Miscellaneous Concrete

For the lump sum of $

17 03 48 00 Precast Blowoff Vault

1 Each $

18 03 48 00 Precast Electrical Pullboxes

13 Each $

19 03 81 10 Saw-cutting Existing Concrete

489 870 lf $ $

20 03 81 10 Concrete Removal, Hydrodemolition, 1-inch Calibration Settings

70 180 yd2 $ $

21 03 81 10 Concrete Removal 2,920,000 lb $ $

22 04 22 10 Reinforced Concrete Unit Masonry Assemblies

5,800 ft2 $ $

23 05 50 00 Metal Fabrications For the lump sum of $

24 08 31 25 Floor Access Hatches

For the lump sum of $

25 13 34 21 Metal Building Systems

For the lump sum of $

26 21 11 16 Fire Hydrants For the lump sum of $

27 21 25 00 Hybrid Water Mist Fire Protection System

For the lump sum of $

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

28 22 11 10 Plant Auxiliary Water Systems

For the lump sum of $

29 22 13 16 Plant Drain Piping Systems

For the lump sum of $

30 23 00 00 Heating, Ventilating, and Air-Conditioning (HVAC) System

For the lump sum of $

31 23 08 00 Commissioning -

HVAC

For the lump sum of $

32 25 00 01 System Control and Monitoring

For the lump sum of $

33 26 05 10 Conductors and Cables

17,000 lf $ $

34 26 05 13 Medium-Voltage Power Cable

4,200 lf $ $

35 26 05 13 Medium-Voltage Power Cable Accessories

For the lump sum of $

36 26 05 20 Ground Cable 2,030 lf $ $

37 26 05 20 Ground Rods 9 Each $ $

38 26 05 20 Electrical Ground Resistance Test

For the lump sum of $

39 26 05 33 Electrical Conduit 11,200 lf $ $

40 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes

41 26 05 36 Cable Trays 600 lf $ $

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

42 26 12 19 Install Government Supplied Pad Mounted Transformer

For the lump sum of $

43 26 17 20 Metal-Clad Switchgear Assembly

For the lump sum of $

44 26 18 39 Medium-Voltage Motor Controllers

For the lump sum of $

45 26 22 12 Dry-Type Transformer

For the lump sum of $

46 26 24 13 Switchboards For the lump sum of $

47 26 24 41 Distribution Panelboards

For the lump sum of $

48 26 26 10 Transformer Load Center

For the lump sum of $

49 26 27 40 Wiring Devices For the lump sum of $

50 26 32 10 Diesel Engine- Generator Set

For the lump sum of $

51 26 42 12 Buried Impressed Current Cathodic Protection

For the lump sum of $

52 26 42 14 Submerged Impressed Current Cathodic Protection

For the lump sum of $

53 26 42 15 Galvanic Anode Cathodic Protection for Welded Steel Tanks

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

54 26 51 00 Interior Lighting For the lump sum of $

55 26 52 00 Emergency and Exit Lighting

For the lump sum of $

56 26 56 00 Exterior Lighting For the lump sum of $

57 27 30 01 Telephone System For the lump sum of $

58 28 10 01 Security and Surveillance System

For the lump sum of $

59 28 31 00 Fire Detection and Alarm

For the lump sum of $

60 31 02 10 Water for Dust Abatement

130 MGal $ $

61 31 02 30 Dust Palliative 5.5 Acre $ $

62 31 03 10 Diversion and Care of Stream During Construction

For the lump sum of $

63 31 03 33 Removal and Control of Water

For the lump sum of

64 31 23 11 Common Excavation

34,000 yd3 $ $

65 31 23 11 Rock Excavation 850 yd3 $ $

66 31 23 11 Backfill 30,000 yd3 $ $

67 31 24 18 Gravel Underdrain System

165 yd3 $ $

68 31 24 20 Cement-Bentonite Slurry Cutoff Wall Spoils

69 31 32 32 Geotextile 19,500 yd2 $ $

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

70 31 32 35 Geocomposite 770 yd2 $ $

71 31 37 00 Riprap 187 yd3 $ $

72 31 56 20 Cement-Bentonite (C-B) Slurry Cutoff Wall

3,900 yd2 yd3 $ $

73 32 15 10 Gravel Surfacing 2,900 yd3 $ $

74 32 31 10 Chain Link Fence 3,300 lf $ $

75 32 91 60 Erosion Control Blanket

8,700 yd2 $ $

76 32 92 20 Seeding 1.6 Acre $ $

77 33 09 12 Open Channel Flow Meter

For the lump sum of

78 33 09 13 Pressure Differential Flowmeter Systems

For the lump sum of $

79 33 09 15 Water Quality Monitoring Instrumentation System

For the lump sum of $

80 33 09 16 Water Level Measuring Devices

For the lump sum of $

81 33 11 15 PVC Collector and Drain Pipe

250 lf $ $

82 33 12 71 Vertical Turbine Pumping Units

For the lump sum of $

83 33 12 79 Submersible Pumping Unit

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

84 33 16 14 Air Chambers and Air Compressors

For the lump sum of $

85 33 41 00 PVC Storm Sewer Pipe

130 lf $ $

86 35 21 10 Trashracks For the lump sum of $

87 35 21 21 Coated Bulkhead Gates and Guides

2 each $ $

88 35 21 60 Baffle Gates and Actuators

For the lump sum of $

89 35 21 70 Trash Rake For the lump sum of $

90 35 21 95 Steel Manifold Piping

For the lump sum of $

91 35 22 10 Slide Gates and Actuators

For the lump sum of $

92 35 22 14 Valve Box 1 Each $ $

93 35 22 14 20-inch AWWA 300 Motor Operated Ball Valves

4 Each $ $

94 35 22 14 20-inch ANSI 250 Tilted Disc Check Valve

4 Each $ $

95 35 22 14 42-inch AWWA 250B Manually Operated Butterfly Valve

1 Each $ $

96 35 22 14 18-inch AWWA 250B Motor Operated Butterfly Valve

2 Each $ $

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

97 35 22 14 20-inch AWWA 250B Manually Operated Butterfly Valve

7 Each $ $

98 35 22 14 12-inch AWWA 300 Manually Operated Buried Ball Valve

1 Each $ $

99 35 22 14 6-inch AWWA C509 or C515 Manually Operated Buried Gate Valve

1 Each $ $

100 35 22 14 18-inch Pressure Sustaining Valve

1 Each $ $

101 35 22 14 6-inch Manually Operated Flanged Butterfly Valve

4 Each $ $

102 35 22 14 Automatic ball-drip drain value

1 Each $ $

103 35 22 14 3-inch Ball Valve 5 Each $ $

104 35 22 14 2-inch Ball Valve 3 Each $ $

105 35 22 14 ¾-inch Ball Valve

5 Each $ $

106 35 22 14 Combination Air Valve Assembly

5 Each $ $

107 35 22 14 Throttling Air Valve Assembly

4 Each $ $

108 35 22 14 2-inch Globe Valve

3 Each $ $

109 35 22 14 ¾-inch Globe Valve

3 Each $ $

Document Title NGWSP Intake & River PP

PRICE SCHEDULE

CLIN Section Supplies or Services

Quantity and Unit Unit Price Amount

110 35 22 14 Pressure Indicator Transmitter

1 Each $ $

111 35 22 14 Pressure Switch 4 Each $ $

112 35 22 14 Pressure Gauge 5 Each $ $

113 35 79 20 Debris Boom For the lump sum of $

114 41 22 10 Davit Crane For the lump sum of $

115 41 22 12 Gantry Crane For the lump sum of $

116 41 22 23 Bulkhead Monorail Crane

For the lump sum of $

117 41 62 23 Track Loader For the lump sum of $

118 41 63 23 Flatbed Truck For the lump sum of $

Subtotal FOR PRICE SCHEDULE B $_________________

Estimated NMGRT at 6.8125% for Price Schedule B (if applicable) $_________________

Estimated Navajo Nation Taxes at 6.00% for Price Schedule B (if applicable) $_________________

TOTAL FOR PRICE SCHEDULE B $_________________

END OF SUPPLIES OR SERVICES AND PRICES

Document Title NGWSP Intake & River PP

F.2 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK ALT I APRIL

The Contractor shall be required to

(a) commence work under this contract within 21 calendar days after the date the Contractor receives the award notice:

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 909 calendar days after the contractor receives the Notice to Proceed issued in accordance with (a) above. The time stated for completion shall include final cleanup of the premises.

1) Complete the construction for use by October 20, 2028.

(d) The completion date is based on the assumption that the successful offeror will receive the notice to proceed by April 24, 2026. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of Clause)

SECTION J – List of Attachments and Exhibits

Attachment Number Description Number of Pages Attachment #1 00 00 01 – Specifications 09242025 1,544

Attachment #1.1 (Amd 0004) 00 00 01 – Specifications 11212025 230 Attachment #2 Drawings

Attachment #2.1 00 00 02_Dwgs-B_001-100_22x34_09-24-2025 100 Attachment #2.2 00 00 02_Dwgs-B_101-200_22x34_09-24-2025 100 Attachment #2.3 00 00 02_Dwgs-B_201-285_22x34_09-24-2025 85 Attachment #2.4 00 00 02_Standard Dwgs-B_286-320_22x34_09-

24-2025

Attachment #2.5 00 00 02_Dwgs-B_321-356_22x34_09/24/2025 36 Attachment #2.6 (Amd 0004) 00 00 02 – Drawings 11212025 10 Attachment #3 00 00 02A_Geology_04102025 62 Attachment #4 WD NM20250040 Heavy – San Juan County, NM

Attachment #5 (Amd 0004) WD NM20250046 Building – San Juan County, NM

Attachment #6 Past Performance Questionnaire 4 Attachment #7 Project Experience 1 Attachment #8 Key Personnel 2 Attachment #9 Subcontracting Plan Template 9

Document Title NGWSP Intake & River PP

L.10 52.236-27 SITE VISIT CONSTRUCTION ALT I FEBRUARY 1995

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for – Wednesday, October 8, 2025, at 10am MT & a second site visit on Wednesday, December 10, 2025, at 10am MT

(c) Participants will meet at – Four Corners Construction Office, 1235 La Plata Highway, Farmington, NM 87401.

(End of Provision)

L.13 WBR 1452.215-81 PROPOSAL INSTRUCTIONS MAR 2021

This procurement will be conducted in accordance with FAR Part 15.

All correspondence in conjunction with this solicitation should be directed to the Government Points of Contact (POCs) identified below:

Amy Loveless Phone: 801-524-3790 Email: aloveless@usbr.gov

Ashton Jones Phone: 385-285-2278 Email: ajones@usbr.gov

In addition to the requirements of the Instructions to Offerors - Competitive Acquisitions provision of this solicitation (see FAR 52.215- 1), each offeror shall submit a proposal in accordance with the instructions contained in this provision.

(1) General contents. Each proposal shall:

a. Be presented in a manner which allows it to “stand alone” without the need to reference other documents;

b. Be a coherent document free of internal inconsistencies as well as inconsistencies with other volumes of the proposal;

c. Conform to all solicitation provisions, clauses, or requirements;

d. Address the submission requirements with specificity and detail where required;

e. Be an orderly, specific, and complete document in every detail;

f. Be logically presented, using clear and concise language so that it can be easily read and meaningfully evaluated by Reclamation personnel from a variety of different functional and technical disciplines;

g. Have all pages in each volume consecutively numbered (including pages with tables and exhibits) and cross-referenced to other volumes where appropriate for each; and

h. Indicate how the proposal conforms to the evaluation criteria identified in Section M.

mailto:aloveless@usbr.gov mailto:ajones@usbr.gov

Document Title NGWSP Intake & River PP

(2) Offerors may submit written questions requesting clarification of solicitation requirements. All questions shall be received no later than 9am MT on 15 December 2025 to allow Reclamation adequate time to prepare and issue responses to all Offerors prior to the date and time set for receipt of proposals. ONLY WRITTEN QUESTIONS WILL RECEIVE A RESPONSE. Each question submitted should contain the following information: document name, document date, specific page, paragraph, clause or other definitive citation for which clarification is requested. All questions shall be submitted electronically to ajones@usbr.gov and aloveless@usbr.gov. Answers will be provided to only the questions submitted in writing and all answers will be provided through the Federal Business Opportunities website within www.sam.gov.

(3) Arrangement of Proposal. The proposal shall consist of three (3) physically separated volumes, individually entitled as stated below. The required number of copies for each volume are shown below:

Proposals shall consist of three (3) physically separated volumes, individually entitled as stated below. The page limit for Volume II is 75 pages, excluding title pages, table of contents, resumes, and letters of commitment. The required number of copies for each volume is summarized below:

Volume Title Hard Copies Required

Electronic Copies Required Page Limitation

I

Business Proposal (Representations, Certifications and Offer)

0 1 30

II Technical Proposal

0 1 75

II Oral Presentations (1) 0 1 30 slides (2)

III Pricing Proposal 0 1 20

(1) See section “Oral Presentations” below for details on oral presentations, when they are required and what is to be provided

(2) Number of Power Point slides.

(4) Separation of volumes. All copies of each proposal volume (i.e., all copies of Volume I) are to be individually labeled identifying what the file contains (e.g. Volume I – Business Proposal) and submitted in separate files.

Any reference to a page limitation shall conform to the following requirements:

a. Page count is per side and shall be double sided

b. Pages are 8 1/2 “x 11”

c. Print size shall be a minimum of 12-point Times New Roman font

d. Margins shall be no less than ½”

e. Foldouts shall be held to 17” x 11” long in size, with each sheet counting as one 8 ½” x 11” page per side mailto:ajones@usbr.gov http://www.sam.gov/

Document Title NGWSP Intake & River PP

f. Pages must not include incorporations by reference (unless exception provided Vol I & III if separate Vol III provided for designs/models)

g. Page limit/page count does not include any project schedule or requested completed attachments. Examples of requested attachments include: resumes of key personnel, charts, required forms, PPQs, SF 1442, Section K representatives and certifications, schedule B pricing pages, etc.

h. Page limitations shall be treated as maximums. If exceeded the excess pages will not be read or considered in the evaluation of proposals.

(5) Pricing Proposal (Volume III). To permit objective evaluation of the technical proposal, no cost or price information shall be included in the business proposal or technical proposals (Volumes I or II). Offerors shall provide a complete schedule and price proposal (Volume III).

(6) General. The technical proposal shall be identified as Volume II of the offeror's proposal and shall be an orderly, specific, and complete document in every detail. It should be presented in a manner which allows it to "stand alone" without the need to reference other documents. It should convincingly describe the capability of the offeror's organization to participate in this project and effectively demonstrate a thorough understanding of the work statement contained in Part I, Section C of this solicitation. The proposal shall be organized and written so that it can be easily read and meaningfully evaluated by Reclamation personnel from a variety of different functional and technical disciplines. It should be a coherent document free of internal inconsistencies as well as inconsistencies with other volumes of the proposal.

(7) Use and Disclosure of Proposal Information. In accordance with 1452.215-71 Use and Disclosure of Proposal Information -

- Department of the Interior provision of this solicitation, offerors shall mark trade secret, or confidential commercial or financial information contained in the proposal with the restrictive legends specified. The offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-3) contained in the proposal with the restrictive legend "Proprietary Information."

(8) Format and General Content. To assist in the uniform evaluation of proposals, the following format shall be utilized in preparing the technical proposal:

• Table of Contents. The Table of Contents shall list all sections of the qualification and technical proposals. Any future amendments, additions and/or revisions to the proposal shall be included in an updated Table of Contents. The Table of Contents shall be formatted by the Technical Evaluation Factors in the following manner:

Technical Evaluation Factors (Volume II)

• Evaluation Factor 1 – Technical Approach, Staff Qualifications and Key Personnel & Experience

• Evaluation Factor 2 – Quality Control

• Evaluation Factor 3 – Past Performance and Safety

• Evaluation Factor 4 – Small Business Participation (SBP) and Indian Preference Hiring Plan

• Index. The Index section shall cross reference the statement of work/specifications/performance work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in Part IV, Section M;

• The tabs shall conform to the Table of Contents to the terms of the proposal and indicate how the proposal conforms to the evaluation factors as shown above.

• Enclosures. The Enclosures Section shall include a list of any tables, drawings, charts, and any other enclosures which summarize data or information;

Document Title NGWSP Intake & River PP

(9) Labelling: Each volume of the proposal shall be provided separately in individual electronic documents. Be sure to apply all appropriate markings, including those in FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.

(10) Electronic Offers: Indicate on each document or folder the solicitation number, volume number and title. If files are compressed, the necessary decompression program must be included. The electronic copies of the proposal shall be submitted in a format readable by Microsoft Office 365 Suite, and Adobe Acrobat 2017 programs. PDF, Word, or Excel format is required for all documents including drawings, cut sheets, and related type documents. PDF is the preferred format, but if a document cannot be fit in PDF, or causes formatting issues, submittal in Word or Excel is acceptable.

(11) Terminology Note: The proposing offeror is referred to throughout this solicitation as different terms. Offeror (capitalized), offeror, builder, contractor, company, firm, etc. All refer to the entity submitting a proposal in response to this solicitation.

There should be no differentiation applied for differing terms.

Directions for submitting electronic copy of proposal:

Preferred: Microsoft Teams Electronic Proposal Instructions

No later than January 16th, 2026, at 1pm MT, the entire below process shall be completed.

Email aloveless@usbr.gov & cc ajones@usbr.gov no later than one week before proposals are due to let us know that you plan to submit the electronic copy of your proposal. It is the contractor’s responsibility to confirm that this email is received by Reclamation.

The next steps in the process are:

(1) You will receive an email from aloveless@usbr.gov or ajones@usbr.gov with a link to a Microsoft Teams Invite. Click the link to the Teams invite and you should have access to the Teams’ folder made specifically for each offeror. Only the individual that emailed Reclamation will have access to the folders.

(2) Upload a Test document into team in Microsoft Teams and confirm with Amy Loveless or Ashton Jones that it was received.

(2) You can then upload your proposal documents to the folder, but this must be completed before solicitation closing date/time.

(3) After you complete the above process, email or call Amy Loveless or Ashton Jones to confirm receipt by Reclamation.

If you have technical problems completing this process, contact Amy Loveless or Ashton Jones. It is suggested that you do not wait too close to the proposal due date/time to complete this process. It can take time for you to upload your large proposal documents.

Backup/Alternate: Kiteworks Electronic Proposal Instructions

No later than January 16th, 2026, at 1pm MT, the entire below process shall be completed.

Email aloveless@usbr.gov & cc ajones@usbr.gov to let us know that you are ready to submit the electronic copy of your proposal. It is the contractor’s responsibility to confirm that this email is received by Reclamation.

The next steps in the process are:

(1) You will receive an email from secure.usbr.gov. The subject of the message will show the email is from Amy Loveless or Ashton Jones. If you do not see this email, check your SPAM folder.

mailto:aloveless@usbr.gov mailto:ajones@usbr.gov mailto:aloveless@usbr.gov mailto:ajones@usbr.gov

Document Title NGWSP Intake & River PP

(2) The text of the email informs you that the link to send Reclamation a file is good for a specific number of days.

(3) When you click on ACTIVATE in the email, you will be taken to a screen to create a password. The password must be at least 12 characters long and contain at least one uppercase letter, one lowercase letter, one number, and one special character.

(4) You will be taken to a screen where you can upload the files that make up your proposal.

(5) After you complete the above process, email or call Amy Loveless or Ashton Jones to confirm receipt by Reclamation.

Last option Backup/Alternative: Normal Email Electronic Proposal Instructions

No later than January 16th, 2026, at 1pm MT, the entire below process shall be completed.

Email aloveless@usbr.gov & cc ajones@usbr.gov to let us know that you are ready to submit the electronic copy of your proposal. It is the contractor’s responsibility to confirm that this email is received by Reclamation.

The next steps in the process are:

(1) Email your proposal in multiple emails. You will need to break down your proposal into separate documents because email attachments cannot be any larger than 40 MB (40,000 KB). The larger the attachments, the slower the email will be to be received, so you may want to go even smaller on your attachments. Number your emails, for example, #1 of 4, etc.

(2) After you complete the above process, email or call Amy Loveless or Ashton Jones to confirm receipt by Reclamation.

If you have technical problems completing this process, contact Amy Loveless or Ashton Jones. It is suggested that you do not wait too close to the proposal due date/time to complete this process. It can take time for you to upload your large proposal documents.

(12) Elaborate brochures or documentation, detailed artwork, or other embellishments are unnecessary and are not desired.

(13) The proposal acceptance period is specified in Block 13 (D) of Section A (Front Page) of the solicitation. Offerors providing less than the specified calendar days for Government acceptance after the date offers are due may be considered non-responsive and may be eliminated.

(14) In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy (an electronic copy) of all unsuccessful proposals.

(15) Discrepancies: If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the CO and CS in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.

SUBMISSION REQUIREMENTS: The following information and structure must be used in the Proposal:

Volume I – Business Proposal, Representations, Certifications, and Other Statement of Offerors

(a) Business Proposal Representations, Certifications, and Other Statement of Offerors (Volume I). Volume I shall incorporate the other Volumes by reference but shall not physically include them. It shall consist of:

a. A fully executed Solicitation, Offer, and Award form (SF 1442) required by Part I, Section A of this solicitation. It shall be used as the cover sheet (or first page) of each copy of Volume I. The following must be included in the cover page:

Document Title NGWSP Intake & River PP

▪ Full Name of Company

▪ Main Contact for the Project Including Phone Number and Email Address

▪ Company Address

▪ Company Phone Number (if different from Main Contact)

▪ Company Unique Entity Identifier (UEI – previously DUNS)

▪ Company DUNS and Tax ID Number (for construction reporting)

▪ Company Cage Code, and

▪ Company SAM Expiration Date.

b. Fully executed and completed offeror representations, certifications, and acknowledgments required by Part IV, Section K of this solicitation;

c. Additional information required by the solicitation to be furnished by the offeror which is not required to be obtained in another volume of the proposal;

d. Make-or-buy program (if applicable);

e. Requests for any waivers of any solicitation provisions or contract clauses; and

f. A summary of any exemptions from, or deviations to, any other solicitation requirements.

g. Request for Proposal Amendments: (if applicable) Acknowledgement of all amendments. Copy of any signed amendments does not count against/towards the page limitations.

(b) Exceptions to Solicitation Requirements: Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, in addition to those identified as evaluation factors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation, or specifications, to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This must be called out clearly in the proposal. Reclamation reserves the right to reject any and all exceptions to the solicitation and if the exception is to a major term or condition of the solicitation the proposal may be thrown out and not considered for award.

Volume II – Technical Proposal

Evaluation Factor 1: Technical Approach, Staff Qualifications and Key Personnel & Experience

Based on the information provided in Section C, contract specifications, each offeror shall submit the following in response:

(a) Narrative description of the facility construction addressing each Key technical concern and key personnel position identified. Responses should include accompanying rationale to reflect why an approach is used in connection with the technical concern. Solicitation attachments 7 & 8 can be used in addition to the narrative description.

(b) A milestone schedule, Gannt Chart is the preferred format.

(c) General means and methods for each technical concern listed.

(d) List of perceived risks and mitigation technique (if applicable) for each technical concern.

(e) Detailed description of the offeror’s internal and external resources that will be utilized to complete this effort, including major subcontractors if applicable.

Technical Approach:

Object of Evaluation: The firm’s technical approach to constructing a raw water pumping plant (71 cfs capacity, with 325 Total Dynamic Head), including associated site improvements, electrical and mechanical equipment, and commissioning. The Pumping Plant and Intake needs to be constructed in an efficient manner with minimal delays, so the Government can meet commitments to deliver raw water to the San Juan Lateral Water Treatment Plant. The approach should address the key technical concerns outlined below.

Document Title NGWSP Intake & River PP

Definitions for Evaluation Factor

1. Technical Approach

The "Technical Approach" refers to the contractor's proposed methods and strategies for accomplishing the tasks outlined in the solicitation. It encompasses the techniques, processes, and technologies that the contractor intends to use in constructing a river intake and raw water pumping plant. The technical approach should demonstrate an understanding of the project requirements, including:

• Incorporating industry best practices.

• Addressing key technical concerns such as in-river work, concrete modifications, slurry wall installation, mitigating installation damage to pumps, schedule opportunities and constraints, and commissioning of the facility.

• Approach to in-river work, concrete modifications, slurry wall installation, accelerating material procurement, meeting or exceeding period of performance, developing and implementing a streamlined commissioning. This approach should be tailored to ensure efficient, effective, and compliant execution of the work while meeting the specific needs of the agency.

Key Technical Concerns of Reclamation

1. Concrete Construction for Intake and Pumping Plant

Provide a detailed technical plan for the concrete construction associated with the intake structure, existing concrete channel modifications, and pump installation. Address the full sequence of work, integrating excavation, demolition, concrete placement (including mass concrete and lean concrete), reinforcement installation, backfill, and compaction.

Key elements to include:

a. Excavation and Demolition Plan: Describe methods for excavating to foundation lines Address demolition of existing structures (concrete walls in the intake and the existing pumping plant), stockpiling suitable materials for backfill, and disposal of waste. Include sequence to minimize interference with ongoing site activities, haul routes, and measures to protect adjacent utilities and observation wells.

b. Concrete Placement Approach: Outline challenges such as variable subsurface conditions, concrete placement on slopes in congested areas, and tying into existing concrete. Explain how challenges will be addressed.

c. Pump Mounting Tolerances and Installation Precision: Concrete surfaces and embedded components associated with pump mounting (including the soleplate and discharge head interface) shall be installed to tight tolerances to ensure proper alignment, fit-up, and performance of the vertical turbine pumping units. Particular attention shall be paid to flatness, levelness, and allowable shaft alignment clearances. Installation shall accommodate the precise interface requirements of the pump manufacturer to ensure long-term equipment reliability and minimize vibration. Detail how installation precision requirements will be met.

d. Backfill and Compaction Around the Plant/Intake Facilities: Detail sourcing and processing of backfill materials, placement methods, moisture conditioning, and compaction equipment. Include general testing approach and compaction targets.

e. Temporary Shoring: Indicate if temporary shoring is planned based on excavation depths, soil stability, and proximity to existing structures. If planned, describe the general approach, including installation and removal.

2. Ground Water Control Approach

Comprehensive plan for managing groundwater, focusing on cement-bentonite (C-B) slurry cutoff wall installation and dewatering/unwatering systems. Key elements to include:

Document Title NGWSP Intake & River PP

a. Slurry Wall Installation: Describe excavation methods (trench to required depth, keyed into bedrock), equipment, and sequence to avoid damaging existing channels/pipelines (seals at contacts). Detail general mix design approach, batching/hydration processes, and slurry loss management. Include post-construction cutout windows (backfilled with sand/gravel mix) and spoils placement.

b. Dewatering/Unwatering Method: Outline system design (well points, sumps) to lower groundwater sufficiently before excavation. Address installation of observation wells (spacing, using existing wells), monitoring (levels, turbidity), and discharge compliance (sediment control). Include reserve power, winterization, and abandonment procedures. Sequence with slurry wall construction (install wall first).

3. Commissioning Implementation

• Maintaining a constant water surface elevation for the intake pumps is complicated given the complexity of multiple gate operations, water supply over the fish weir, and variable river flows. The contractor shall detail how they will deal with the challenges of commissioning the complex system, simulating variable river conditions, and covering the entire pumping plant flow range (minimum to maximum). Coordinating communication of Intake Facility with SJLWTP.

4. Other Contractor/Government Engagement

• At least 3 other projects, San Juan Lateral Water Treatment Plant (SJLWTP), Reach 1 Pipeline Improvements and the Frank Chee Wiletto Reservoir Modifications, may be under construction while the Intake is under construction.

➢ The SJLWTP contractor will operate the Intake and Pumping Plant upon substantial completion of the Intake project. Also, the SCADA at the Intake will need to communicate with the SCADA at the WTP. Indicate coordination needed with SJLWTP contractor to ensure successful implementation of the communication systems and operation of the facilities.

➢ The Reach 1 Pipeline contractor will be grouting the interior of each pipe joint, possible unknown repairs, and testing the pipeline once the repairs are complete. The temporary pumps may need to provide water for testing the repairs. Explain coordination needed to successfully repair and test pipeline.

➢ The Frank Chee Willetto Reservoir may be drained through the Reach 1 Pipeline for the proposed modifications.

Describe coordination needed to facilitate draining the reservoir.

• Reclamation is in the process of purchasing transformers for the River Intake Facility. Explain coordination approach to ensure equipment is safely delivered to site and installed when needed. Transformers will be provided as Government Furnished Equipment (GFE) and are detailed in the specifications.

• Depending on water demands at the Frank Chee Willetto Reservoir, Reclamation or their contractors may need to operate the existing temporary pumps. Explain coordination needed to ensure flows can be delivered as needed.

5. Schedule Constraints

• Completion of the Intake Facility is critical in delivering water to the San Juan Lateral Water Treatment Plant. Describe methods and recommendations used to optimize the schedule.

• At a minimum, integrate major features including slurry wall installation, dewatering, cofferdam installation, equipment fabrication, channel modifications, pump installation, building construction and commissioning.

• Explain the project specific plan for reducing delays and how delays will be addressed.

Staff Qualifications and Key Personnel Experience:

Object of Evaluation:

The technical qualifications and experience of the contractor’s staff, specifically key personnel assigned to the project. This will be

Document Title NGWSP Intake & River PP assessed to ensure that the team possesses the requisite expertise and relevant background to successfully execute the work associated with constructing and commissioning raw water pumping plants. The proposed Key Personnel information shall be supplemented by the oral presentation information provided. Offeror’s that can provide professional work references for similar work and key personnel will be rated more favorably.

The offeror shall include a statement of assurance that the proposed key personnel will be available for the work under this solicitation and that in the event a person named as the primary is not available, that the proposed alternative will be utilized. Should neither the primary nor the alternate key personnel be available under this solicitation at the time of award, the Offeror’s proposal may be disqualified if the replacement is not, at least, of the same quality as determined and approved by the Government Contracting Officer (CO) and Contracting Officer’s Representative (COR). Quality Control Supervisor and Onsite Safety Representative must be dedicated positions, and no other role may be held by the personnel proposed (e.g. safety cannot be superintendent or quality control, etc.).

Definitions for Evaluation Factor

1. Relevancy

• Relevancy refers to the extent to which the qualifications, skills, and experience of key personnel are directly applicable to the specific requirements and challenges of the constructing and commissioning raw water pumping plants. Proposals should demonstrate how the team's background is aligned with the project’s needs, illustrating the ability to effectively address the technical, safety, and operational demands associated with similar pumping plant and access road work.

2. Professional Work References

• Professional Work References refer to individuals or organizations that can provide credible and relevant testimony regarding a contractor's past performance, abilities, work ethic, and overall qualifications in a professional context. These references are typically former clients, project managers, or colleagues who have firsthand knowledge of the contractor’s skills and experience in executing specific project types. Professional work references may provide insights into the contractor's reliability, quality of work, adherence to deadlines, communication skills, and ability to solve problems, all of which can be critical in evaluating the contractor’s suitability for future projects or contracts.

Key Characteristics of Professional Work References:

• Credibility: Should have a positive and credible relationship with the contractor.

• Relevance: Experience with projects similar in nature, scope, or complexity to the project being proposed.

• Availability: Willingness to provide feedback and communicate about the contractor’s performance.

Key Personnel Considerations of Reclamation:

1. Project Manager

• Properties of Interest:

➢ Comparable Experience: Demonstrated experience in a similar role on projects that reflect similar nature, size, and complexity.

➢ Employment Status: Currently employed by the prime contractor submitting the proposal.

➢ Certification: Certified Project Management Professional (PMP) credential or equivalent is desirable but not required.

• Property Descriptions:

Document Title NGWSP Intake & River PP

➢ The Project Manager should outline their track record of managing projects that include large raw water pumping plant construction and commissioning, demonstrating leadership in directing timelines, budgets, and stakeholder communications.

• Definitions:

➢ Comparable Experience: Experience gained in managing projects that are similar in scope, technical requirements, and operational challenges to the current project.

➢ Qualifications: Credentials, certifications, and educational background that affirm the capability of the Project Manager to lead the project effectively.

➢ Experience: The practical knowledge acquired through direct involvement in similar projects, including specific roles and responsibilities.

2. Site Superintendent

• Properties of Interest:

➢ Comparable Experience: Demonstrated experience in a similar role on projects of comparable nature, size, and complexity.

➢ Employment Status: Currently employed by the prime contractor submitting the proposal.

• Property Descriptions:

➢ The Site Superintendent shall provide evidence of their experience overseeing on-site operations, coordinating work activities in accordance with strict specifications, and managing field personnel specifically related to constructing and commissioning raw water pumping plants.

• Definitions:

➢ Comparable Experience: Relevant experience in roles that involve similar supervisory responsibilities in the context of constructing and commissioning pumping plant.

➢ Qualifications: Necessary credentials and training that support the individual’s ability to fulfill the Site Superintendent role successfully.

➢ Experience: The knowledge and skills gained from overseeing construction projects, particularly in circumstances similar to the current project.

3. Contractor’s Onsite Safety Representative

• Properties of Interest:

➢ Safety Certification: Must meet the requirements specified in Section 01 35 30 – Contractor’s Onsite Safety Personnel.

• Property Descriptions:

➢ The Contractor’s Onsite Safety Representative must demonstrate knowledge of safety protocols and regulations, ensuring compliance with health and safety standards throughout the project.

• Definitions:

➢ Qualifications: Certifications and training related to health and safety regulations specific to construction projects.

Document Title NGWSP Intake & River PP

➢ Experience: Practical experience in implementing safety protocols on construction sites and managing personnel to maintain a safe work environment.

4. Quality Control Supervisor

• Properties of Interest:

➢…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .