NGWSP INTAKE & RIVER PUMPING PLANT
Solicitation number
140R4025R0023
Issued by

About this file

These technical drawing files are for the Navajo-Gallup Water Supply Project, specifically the San Juan Lateral – Reach 1 Intake and River Pumping Plant, located in New Mexico. The documents include detailed architectural and electrical plans for a pumping plant facility, with comprehensive schematics covering floor plans, wall sections, conduit routing, communication networks, and security systems. The plans show a complex facility with multiple rooms including a pump room, air chamber rooms, MCC room, and spaces for electrical equipment like switchgear, transformers, and generator.

The electrical drawings outline an intricate infrastructure for power distribution, communication, and control systems, including medium and low voltage power conduits, communication cabling, SCADA (Supervisory Control and Data Acquisition) network, and security surveillance systems. The facility will utilize single-mode optical fiber transmission, Ethernet networking, programmable logic controllers (PLCs), operator interface terminals (OITs), and integrated communication interfaces. The project involves precise electrical routing, with detailed conduit schedules specifying wire functions, counts, sizes, and cable origination and termination points across various system components.

View the file

Other files

File Type Posted
Sol_140R4025R0023_Amd_0007.pdf PDF
River_Intake_and_Pumping_Plant_second_site_visit_attendance_record_0007.pdf PDF
Sol_140R4025R0023_Amd_0006.pdf PDF
140R4025R0023_Questions___Answers_-_Round_4_0006.pdf PDF
140R4025R0023_Attachment_2_7_-_00_00_02_-_Drawings_12192025_0005.pdf PDF
Sol_140R4025R0023_Amd_0005.pdf PDF
140R4025R0023_Questions___Answers_-_Round_3_0005.pdf PDF
140R4025R0023_Attachment_1_2_-_00_00_01_-_Specifications_12192025_0005.pdf PDF
140R4025R0023_Questions___Answers_-_Round_2_0004.pdf PDF
NGWSP_-_River_Intake_PP_Site_Tour_-_8OCTOBER2025_(1)_0004.pdf PDF
140R4025R0023_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM_19SEP25_0004.pdf PDF
140R4025R0023_Attachment_1_1_-_00_00_01_-_Specifications_11212025_0004.pdf PDF
Sol_140R4025R0023_Amd_0004.pdf PDF
Sol_140R4025R0023_Amd_0003.pdf PDF
Sol_140R4025R0023_Amd_0002.pdf PDF
140R4025R0023_Questions___Answers_-_Round_1_0002.pdf PDF
Intake_and_River_Pumping_Plant_Site_Visit_Sign-in_Sheet_0002.pdf PDF
Sol_140R4025R0023_Amd_0001.pdf PDF
140R4025R0023_Attachment_2_5_-_00_00_02_Dwgs-B_321-356_22x34_09-24-2025_0001.pdf PDF
140R4025R0023_Attachment_2_2_-_00_00_02_Dwgs-B_101-200_22x34_09-24-2025.pdf PDF
140R4025R0023_Intake___River_PP_24SEP25.pdf PDF
140R4025R0023_Attachment_2_3_-_00_00_02_Dwgs-B_201-285_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_2_1_-_00_00_02_Dwgs-B_001-100_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM.pdf PDF
140R4025R0023_Attachment_1_-_00_00_01_-_Specifications_09242025.pdf PDF
140R4025R0023_Attachment_7_-_Experience_Form.docx DOCX document
Sol_140R4025R0023.pdf PDF
140R4025R0023_Attachment_2_4_-_00_00_02_Standard_Dwgs-B_286-320_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4025R0023_Attachment_4_-_WD_NM20250040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4025R0023_Attachment_9_-_Subcontracting_Plan_Template.docx DOCX document
140R4025R0023_Attachment_3_-_00_00_02A_Geology_04102025.pdf PDF
140R4025R0023_Attachment_8_-_Key_Personnel_Form.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

62141

62141

1'-9" 14'-0" 20'-0" 20'-0" 19'-6" 21'-0" 21'-0" 20'-11" 1'-10"

140'-0"

30'-8" 3'-4" 12'-0" 29'-4" 1" 16'-7" 48'-0"

75'-4" 1" 54'-7" 3'-4" 6'-8"

Guard post, typ.

PUMP ROOM

AIR CHAMBER

ROOM

MCC ROOM

AIR CHAMBER

NO. 1

AIR CHAMBER

NO. 2

AIR CHAMBER

NO. 3

Concrete stoop, re: struct.

Concrete stoop, re: struct.

Vault hatch, re: struct.

UNIT

UNIT

UNIT

UNIT

Concrete stoop, re:

struct.

Observation window

Air compressors

Trench drain

FRP grating, typ.

CMU screen wall re: struct.

Concrete apron, re: struct.

CMU wall, re: struct.

Concrete apron, re:

struct.

41'-9" 6'-0" 17'-0"

62144

62144

62143

Engine generator

MCC

CMU screen wall, re:

struct.

HVAC/heat pumps, re: mech.

Roof access ladder

62147

A

Trench drain, typ. @ downspouts in equipment enclosures

Down spout

Guard post, typ.

15" Concrete

62150

Switchgear

Transformer

High-bay storage, re: specs.

Office desk & chair

(NIC)

Down spout with boot, re: detail 7/62149

Control joint re: struct.

45'-4" 29'-4" 1'-4"

W2

W1

W1

Peer Reviewer - Plant Structures Group

D

C

B

D

C

B

A

A

S A F E T Y

A L W

A Y S T

H

IN

K

B U

R E A U

O F R

E C L A M

A T

IO

N

U .S

D

E P A R T M

E N

T O

F T

H E I

N T E R

IO

R

DESIGNED

CHECKED

DRAWN

TECH. APPR.

APPROVED

N A V A

JO

-G A L L U

P W

A T E R S

U P P L Y P

R O

JE

C T

N E W

M E X

IC

O

S A N

J U

A N

L A T E R A L

R E A C H

IN

T A K E A

N D

R

IV

E R P

U M

P

IN

G P

L A N

T

B. TRIPP

H. COOPER

B. BARKEY

BRUCE BARKEY, R.A.

LAN NGUYEN, P.E.

DENVER, CO 2025.04.09

PUMPING PLANT

ARCHITECTURAL

PLAN

1695-D-62139

1/8" = 1'-0"1

PLAN - FLOOR EL. 5099.50

NOTES

1. SEE (62138) FOR ARCHITECTURAL GENERAL NOTES, SYMBOLS,

AND ABBREVIATIONS.

0 4' 8' 16'

Scale: 1/8" = 1'-0"

R E V N

O

S T A

D

/5

/2

H e a th e r

C o o p e r

IN

T E R

IO

R W

A L L T

Y P E S

T.O floor

El. 5099.50

Low eave

El. 5117.42

BA

T.O wall

El. 5109.50

IN

S

U L A

T E

D P

A N

E L T

O R

O O

F T

Y P

V A

R

IE

S

Insulated metal roof panel

Structural steel frame, re: struct.

Z-girt

Insulated metal wall panel

Precast sill, chamfered, color matched to scored, smooth-faced CMU accent band below (see 62147)

1-course smooth-faced CMU scored w/4"x4" squares @ exterior face (see 62147)

Rigid foundation insulation, typ. See specifications for dept and R-value requirements

62150

T.O floor

El. 5099.50

C

High eave - south

El. 5136.50

Insulated metal roof panel

Z-girt

Steel frame re:

struct. (beyond)

Purlins re:

struct.

Insulated metal wall panel - btwn upper & lower roof

Prefinished metal fascia

62146

62146

T.O floor

El. 5099.50

ED

T.O wall

El. 5109.50

High eave - north

El. 5132.00

Insulated metal roof panels

Purlins, re:

struct.

Structural steel frame, re: struct.

Insulated metal wall panel

Z-girt

IN

S

U L A

T E

D M

T L P

A N

E L T

O R

O O

F T

Y P

V A

R

IE

S

Precast sill, chamfered, color matched to scored, smooth-faced accent band below (see 1/62145)

1-course smooth-faced CMU scored w/4"x4" squares @ exterior face (see 1/62145)

Rigid foundation insulation, typ. See specifications for depth & R-value requirements

62148

Translucent panel (beyond), see elevations & window schedule

Light gauge secondary framing (size & spacing) re: vendor

Insulated metal wall panel re: elevations

Insulated metal roof panel

Z-girt, re:structure

Head wall flashing.

Foam insulation as req'd.

C

High eave - south

El. 5136.50

Metal rake fascia trim, typ.

Sheeting or rake angle

Through fastener, typ.

Purlin

Girt

6 1/4"

2" 3 5/8" 5/8"

S E C

T

IO

N P L A N

S E C

T

IO

N

DEFLECTION TRACK

BOTTOM OF STRUCTURE

5/8" GYPSUM BOARD

JOINT SEALANT

5/8" GYPSUM BOARD

3 5/8" GALVANIZED STEEL STUDS

1/16" METAL PANEL

1/16" METAL PANEL

INSULATION

3 5/8" GALVANIZED STEEL STUDS

JOINT SEALANT

INSULATION

2" 3 5/8" 2"

S E C

T

IO

N P L A N

S E C

T

IO

N

DEFLECTION TRACK

BOTTOM OF STRUCTURE

JOINT SEALANT

3 5/8" GALVANIZED STEEL STUDS

1/16" METAL PANEL

1/16" METAL PANEL

INSULATION

3 5/8" GALVANIZED STEEL STUDS

JOINT SEALANT

INSULATION

7 1/2"

D

C

B

D

C

B

A

A

S A F E T Y

A L W

A Y S T

H

IN

K

B U

R E A U

O F R

E C L A M

A T

IO

N

U .S

D

E P A R T M

E N

T O

F T

H E I

N T E R

IO

R

DESIGNED

CHECKED

DRAWN

TECH. APPR.

APPROVED

DESIGNED

CHECKED

DRAWN

TECH. APPR.

APPROVED

N A V A

JO

-G A L L U

P W

A T E R S

U P P L Y P

R O

JE

C T

N E W

M E X

IC

O

S A N

J U

A N

L A T E R A L

R E A C H

IN

T A K E A

N D

R

IV

E R P

U M

P

IN

G P

L A N

T

B. TRIPP

H. COOPER

B. BARKEY

BRUCE BARKEY, R.A.

LAN NGUYEN, P.E.

BRUCE BARKEY, R.A.

LAN NGUYEN, P.E.

DENVER, CO 2025.04.09

PUMPING PLANT

ARCHITECTURAL

WALL SECTIONS

1695-D-62146

B. TRIPP

H. COOPER

B. BARKEY

3/8" = 1'-0"3

WALL SECTION 3

3/8" = 1'-0"2

WALL SECTION 2

3/8" = 1'-0"1

WALL SECTION 1

Peer Reviewer - Plant Structures Group

0 2' 4' 6'

Scale: 3/8" = 1'-0"

NOTES

1. SEE (62138) FOR ARCHITECTURAL GENERAL NOTES, SYMBOLS,

AND ABBREVIATIONS.

3/4" = 1'-0"4

SHED ROOF CONNECTION DETAIL

0 1' 2' 3'

Scale: 3/4" = 1'-0"

3/4" = 1'-0"5

HIGH POINT RAKE DETAIL

1 1/2" = 1'-0"6 W1

1 1/2" = 1'-0"7 W2

Wall Schedule Interior

Type Mark

Use Descripti on Width Structure

Construction Description

Top of Wall to

Fire Rating

W1 Interior

Wall

6 1/4" (1) Layer of insulated metal panel one side (1) layer 5/8" Gypsum one side

3-5/8" Steel

Studs

Under Side

Structure

1 hour

W2 Interior

Wall

7 5/8" (1) Layer of insulated metal panel each side 3-5/8" Steel

Studs

Under Side

Structure

1 hour

R E V N

O

S T A

D

/5

/2

H e a th e r

C o o p e r

IN

T E R

IO

R W

A L L T

Y P E S

Sealant each side

Grout filled metal door frame, typ. @

CMU

Insulated metal door

8" CMU, typ.

Interior insulated metal wall panels, attached to CMU

Metal trim

Sealant each side

Grout filled metal door frame Insulated metal door

8" CMU, typ.

Interior insulated metal wall panel attached to CMU

Metal trim

Threshold

Masonry T-anchors

Grout filled metal door frame, typ. @ masonry openings

Insulated metal door

Door shoe with drip cap

Metal trim

Threshold

Hollow metal door frame

Insulated metal door

Interior insulated metal wall panel attached to metal studs

Gypsum wall board

Metal door frame

Insulated metal door

Door shoe

Hollow metal door frame

Insulated metal door

Interior insulated metal wall panel attached to metal studs

Gypsum wall board

TYPE A TYPE B

3'-0" 3'-0"

R E

S C H

E D

U L E

3'-0"

R E

S C H

E D

U L E

6'-0"

CONTINUOUS

STEEL

ASTRAGAL

ON ACTIVE

DOOR LEAF

TYPE C

3'-0" 3'-0"

R E

S C H

E D

U L E

6'-0"

2" 3'-0" 2"

TYPE 1 TYPE 3

6'-8"

4" 6'-0" 4"

3'-4"

10 10

4 4

6 6

TYPE 2

6'-4"

2" 6'-0" 2"

2" 3'-0" 2"

TYPE 4

3'-4"

Peer Reviewer - Plant Structures Group

D

C

B

D

C

B

A

A

S A F E T Y

A L W

A Y S T

H

IN

K

B U

R E A U

O F R

E C L A M

A T

IO

N

U .S

D

E P A R T M

E N

T O

F T

H E I

N T E R

IO

R

DESIGNED

CHECKED

DRAWN

TECH. APPR.

APPROVED

N A V A

JO

-G A L L U

P W

A T E R S

U P P L Y P

R O

JE

C T

N E W

M E X

IC

O

S A N

J U

A N

L A T E R A L

R E A C H

IN

T A K E A

N D

R

IV

E R P

U M

P

IN

G P

L A N

T

B. TRIPP

H. COOPER

B. BARKEY

BRUCE BARKEY, R.A.

LAN NGUYEN, P.E.

DENVER, CO 2025.04.09

PUMPING PLANT

ARCHITECTURAL

DOOR SCHEDULES AND

DETAILS

1695-D-62149

NOTES

1. SEE (62138) FOR ARCHITECTURAL GENERAL NOTES, SYMBOLS,

AND ABBREVIATIONS.

2. ALL DOOR HARDWARE NOT SHOWN ON DETAIL DRAWINGS.

0 1' 2' 4'

Scale: 1/2" = 1'-0"

3" = 1'-0"4

DOOR HEAD DETAIL AT CMU

3" = 1'-0"5

DOOR JAMB DETAIL AT CMU

3" = 1'-0"8

DOOR THRESHOLD DETAIL AT CMU

3" = 1'-0"6

DOOR HEAD DETAIL AT INTERIOR

3" = 1'-0"9

DOOR THRESHOLD DETAIL AT INTERIOR

3" = 1'-0"7

DOOR JAMB DETAIL AT INTERIOR

1/2" = 1'-0"3

DOOR TYPES

1/2" = 1'-0"1

DOOR FRAME TYPES

0 3" 6" 9"

Scale: 3" = 1'-0"

R E V N

O

S T A

D

/5

/2

H e a th e r

C o o p e r

IN

T E R

IO

R W

A L L T

Y P E S

DOOR SCHEDULE

MARK

DOOR

TYPE WIDTH HEIGHT

DOOR

MATERIAL

DOOR

FINISH FRAME TYPE Frame Finish FIRE RATING COMMENTS

101 B 3' - 0" 7' - 10" STEEL PRIMED HM - TYPE 3 STEEL - PRIMED INSULATED HM DOOR

102 - 10' - 0" 12' - 0" STEEL PRIMED - INSULATED OVERHEAD DOOR

103 B 3' - 0" 7' - 10" STEEL PRIMED HM - TYPE 3 STEEL - PRIMED INSULATED HM DOOR

104 A 6' - 0" 7' - 10" STEEL PRIMED HM - TYPE 1 STEEL - PRIMED INSULATED HM DOOR

105 - 6' - 0" 10' - 0" STEEL PRIMED - INSULATED OVERHEAD DOOR

106 B 3' - 0" 7' - 10" STEEL PRIMED HM - TYPE 3 STEEL - PRIMED INSULATED HM DOOR

107 B 3' - 0" 7' - 0" STEEL PRIMED HM - TYPE 4 STEEL - PRIMED INSULATED HM DOOR

109 C 6' - 0" 7' - 0" STEEL PRIMED HM - TYPE 2 STEEL - PRIMED INSULATED HM DOOR

110 C 6' - 0" 7' - 0" STEEL PRIMED HM - TYPE 2 STEEL - PRIMED INSULATED HM DOOR

MODBUS RTU

(1695-D-62285)

FIBER BYPASS UNIT

NOTE 8

SCADA CABINET UPS

FUTURE

COMMUNICATION

INTERFACE

PLC

COMMUNICATION INTERFACE

CABINET NOTE 8, 9

NETWORK GATEWAY

SWITCH

(FIREWALL/VPN)

NOTE 8

MEDIA

CONVERTER

NTUA OPTICAL FIBER TRANSMISSION SYSTEM

AERIAL & BURIED CABLE TO NTUA FIBER BACKBONE

(EXISTING AND NEW)

S00A01-PB-013

COMMUNICATION PULL BOX

(PUMPING PLANT YARD)

NOTE 1

SUPPLIED BY OTHERS

NOTE 2

AERIAL OPTICAL FIBER

SPLICE ENCLOSURE

SPLICE CLOSURE

COMMUNICATION PULL BOX

(PUMPING PLANT YARD)

NOTE 1

PNM OPTICAL FIBER TRANSMISSION SYSTEM

AERIAL & BURIED CABLE TO RESERVOIR

(EXISTING & NEW)

SUPPLIED BY OTHERS

NOTE 2

AERIAL OPTICAL FIBER

SPLICE ENCLOSURE

FIBER BYPASS UNIT

NOTE 8

MAGNETIC CONTACTS

(1695-D-62298)

INTAKE CHANNEL REMOTE I/O CABINET S00A01-CP-001

OIT

NOTE 3

PLC

MODBUS RTU

(1695-D-62285)

HART 4-20 mA

LEVEL INSTRUMENTS

ETHERNET

WQ DATA LOGGER

NETWORK SWITCH

MEDIA

CONVERTER

RETURN CHANNEL REMOTE I/O CABINET S00A01-CP-002

OIT

NOTE 3

PLC

HART 4-20 mA

LEVEL INSTRUMENTS

ETHERNET

WQ DATA LOGGER

NETWORK SWITCH

MEDIA

CONVERTER

MEDIA

CONVERTER

SCADA NETWORK

SWITCH

OIT

NOTE 3

PUMPING PLANT SCADA

CABINET S00A02-CP-001

INSTRUMENTATION

(I/O POINTS LIST

51 00 20)

HART 4-20 mA

LEVEL INSTRUMENTS

S00A01-PB-002

SPLICE CLOSURE

PUMPING PLANT NETWORK

CABINET NOTE 10

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C

A D

F

IL

EN

A M

E

-D

-6

-R

D -2

.D W

G

LA

S T

S A V

ED

D A

TE

-1 1-

LA

S T

S A V

ED

B Y

LG

EN

TR

Y

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

S A N

J U

A N

L A

TE

R A L

R

EA

C H

IN

TA

K E

A N

D R

IV

ER

P U

M

PI

N G

P

LA

N T

ELECTRICAL-SCADA

SCADA & NETWORK

OVERVIEW

DENVER, CO

1695-D-62283

2025-04-09

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL

K. Yokoyama

K. Yokoyama

C. Underwood

K. YOKOYAMA, P.E.

E. MORLEY

Manager-Electrical Controls Group

ABBREVIATIONS

Single Mode Optical Fiber Cable Pair CAT 6 Ethernet Cable Serial Connection

LEGEND

Multi-Conductor Cable

NOTES

1. Terminate/splice single mode optical fiber in communication pull box splice closure. Contractor to install conduit, splice vaults, and splice closures.

Contractor to pull their fiber to vault and splice all fiber strands into the closure.

2. Aerial optical fiber and pole to be provided by others.

Excess fiber will be coiled on the pole.

3. 15-inch touch panel display on the SCADA Equipment Cabinet door panels at Pumping Plant and Intake Gates.

4. 24-port PoE Ethernet Switch at the Pumping Plants.

5. CAT 6 installed length not to exceed 300'.

6. Provide media converters where required for connecting CAT 6 Ethernet cable to optical fiber.

7. Patch panels not shown on drawings.

8. Communication Interface Cabinet, Fiber Bypass Units, and Network Gateway Switch are supplied by the Government to the Contractor for installation.

9. Contractor to provide power and communication connections to Communication Interface Cabinet.

10. Terminate optical fiber from the Communication Pull Box at a patch panel in the pumping plant network cabinet.

REFERENCE DRAWINGS

RIVER INTAKE AND SLUICING CHANNELS 1695-D-62264

RIVER SLUICING AND RETURN CHANNELS 1695-D-62265

PUMPING PLANT SUMP 1695-D-62266

REACH 1 RIVER PUMPING PLANT UNIT 1 AND

UNIT 2 1695-D-62267

REACH 1 RIVER PUMPING PLANT UNIT 3 AND

UNIT 4 1695-D-62268

REACH 1 RIVER PUMPING PLANT DISCHARGE

HEADER 1695-D-62269

REACH 1 RIVER PUMPING PLANT AIR

CHAMBERS 1695-D-62270

SECURITY AND SURVEILLANCE NETWORK

OVERVIEW 1695-D-62284

MODBUS SERIAL COMMUNICATIONS 1695-D-62285

SECURITY UNDERGROUND AND EMBEDDED

CONDUITS 1695-D-62298

CONDUIT PLANT SITE 1695-D-62256

INTAKE CHANNEL CONDUIT PLAN 1695-D-62301

RETURN CHANNEL CONDUIT PLAN 1695-D-62302

OIT Operator Interface Terminal

PLC Programmable Logic Controller

POE Power Over Ethernet

UPS Uninterruptible Power Supply

-1 0-

D

L.

G en tr y, P

.E

In cl ud ed

G ov

't su pp lie d eq ui pm en t to b e in st al le d by C on tr ac to r an d re m ov ed s ec ur ity sy st em c on ne ct io n to S

C A D

A

FUTURE

COMMUNICATION

INTERFACE

SECURITY SWITCH

IP CAMERAS

(1695-D-62286)

DIGITAL VIDEO RECORDER

MONITOR

USB CONNECTION

TO ACCESS CONTROL SYSTEM

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C

A D

F

IL

EN

A M

E

-D

-6

-R

D -2

.D W

G

LA

S T

S A V

ED

D A

TE

-1 1-

LA

S T

S A V

ED

B Y

C U

N D

ER

W

O O

D

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

S A N

J U

A N

L A

TE

R A L

R

EA

C H

IN

TA

K E

A N

D R

IV

ER

P U

M

PI

N G

P

LA

N T

ELECTRICAL-SCADA

SECURITY &

SURVEILLANCE

NETWORK OVERVIEW

DENVER, CO

1695-D-62284

2025-04-09

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL

K. Yokoyama

K. Yokoyama

C. Underwood

K. YOKOYAMA, P.E.

E. MORLEY

Manager-Electrical Controls Group

NOTES

REFERENCE DRAWINGS

SCADA & NETWORK OVERVIEW 1695-D-62283

SECURITY CAMERAS AND KEYPADS

PLAN 1695-D-62286

UNDERGROUND AND EMBEDDED

CONDUIT 1695-D-62298

CAT 6 Ethernet Cable Serial Connection

LEGEND

1. Monitor, Keyboard and Mouse to be provided with Digital Video Recorder.

2. Contractor is responsible for completing the design and locating all other components to provide a security and surveillance system in accordance with the requirements of Section 28 10 01-Security and Surveillance System.

3. Contractor to design and provide cable and conduit in accordance with Section 28 10 01-Security and Surveillance System, 26 05 10-Conductors and Cables and 26 05 33-Raceway and Boxes.

-1 0-

D

L.

G en tr y, P

.E

In cl ud ed

G ov

't su pp lie d eq ui pm en t to b e in st al le d by C on tr ac to r an d re m ov ed s ec ur ity sy st em c on ne ct io n to S

C A D

A

127_1695-D-62139
134_1695-D-62146
Sheets
62139 - PLAN
62146 - WALL SECTIONS
62149 - SCHEDULES AND DETAILS
137_1695-D-62149
Sheets
62139 - PLAN
62146 - WALL SECTIONS
62149 - SCHEDULES AND DETAILS
239_1695-D-62257
242_1695-D-62260
249_1695-D-62305
250_1695-D-62306
255_1695-D-62265
273_1695-D-62283
274_1695-D-62284

File details come from the government source that posted it. Updated .