NGWSP INTAKE & RIVER PUMPING PLANT
Solicitation number
140R4025R0023
Issued by

About this file

This document is a pre-bid conference presentation for the Navajo-Gallup Water Supply Project (NGWSP) River Intake Pumping Plant, scheduled for October 8, 2025. The project, estimated at $2.2 billion, involves constructing two main laterals (Cutter and San Juan) totaling 300 miles of pipelines, two water treatment plants with capacities of 5 and 38 MGD, 19 pumping plants, and numerous storage tanks. Construction began in June 2012, with complexities including cultural resources compliance, land acquisitions, and coordination with multiple stakeholders.

The specific River Intake Pumping Plant component includes a 7,300 sq ft metal building, four 900-HP vertical turbine pumps, air chambers, settling channel modifications, and various infrastructure improvements. The project schedule indicates bid submissions are due December 19, 2025, with bid evaluation completed by January 16, 2026, and contract award anticipated on March 20, 2026. The construction is set to be completed by October 6, 2028. The pre-bid conference includes a site tour and a comprehensive job hazard analysis, with emergency contact information and safety procedures clearly outlined.

View the file

Other files

File Type Posted
Sol_140R4025R0023_Amd_0007.pdf PDF
River_Intake_and_Pumping_Plant_second_site_visit_attendance_record_0007.pdf PDF
Sol_140R4025R0023_Amd_0006.pdf PDF
140R4025R0023_Questions___Answers_-_Round_4_0006.pdf PDF
140R4025R0023_Attachment_2_7_-_00_00_02_-_Drawings_12192025_0005.pdf PDF
Sol_140R4025R0023_Amd_0005.pdf PDF
140R4025R0023_Questions___Answers_-_Round_3_0005.pdf PDF
140R4025R0023_Attachment_1_2_-_00_00_01_-_Specifications_12192025_0005.pdf PDF
140R4025R0023_Attachment_2_6_-_00_00_02_-_Drawings_11212025_0004.pdf PDF
140R4025R0023_Questions___Answers_-_Round_2_0004.pdf PDF
140R4025R0023_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM_19SEP25_0004.pdf PDF
140R4025R0023_Attachment_1_1_-_00_00_01_-_Specifications_11212025_0004.pdf PDF
Sol_140R4025R0023_Amd_0004.pdf PDF
Sol_140R4025R0023_Amd_0003.pdf PDF
Sol_140R4025R0023_Amd_0002.pdf PDF
140R4025R0023_Questions___Answers_-_Round_1_0002.pdf PDF
Intake_and_River_Pumping_Plant_Site_Visit_Sign-in_Sheet_0002.pdf PDF
Sol_140R4025R0023_Amd_0001.pdf PDF
140R4025R0023_Attachment_2_5_-_00_00_02_Dwgs-B_321-356_22x34_09-24-2025_0001.pdf PDF
140R4025R0023_Attachment_2_2_-_00_00_02_Dwgs-B_101-200_22x34_09-24-2025.pdf PDF
140R4025R0023_Intake___River_PP_24SEP25.pdf PDF
140R4025R0023_Attachment_2_3_-_00_00_02_Dwgs-B_201-285_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_2_1_-_00_00_02_Dwgs-B_001-100_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM.pdf PDF
140R4025R0023_Attachment_1_-_00_00_01_-_Specifications_09242025.pdf PDF
140R4025R0023_Attachment_7_-_Experience_Form.docx DOCX document
Sol_140R4025R0023.pdf PDF
140R4025R0023_Attachment_2_4_-_00_00_02_Standard_Dwgs-B_286-320_22x34_09-24-2025.pdf PDF
140R4025R0023_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4025R0023_Attachment_4_-_WD_NM20250040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4025R0023_Attachment_9_-_Subcontracting_Plan_Template.docx DOCX document
140R4025R0023_Attachment_3_-_00_00_02A_Geology_04102025.pdf PDF
140R4025R0023_Attachment_8_-_Key_Personnel_Form.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navajo-Gallup Water Supply Project (NGWSP)

October 8, 2025

River Intake Pumping Plant Pre-Bid Conference

Agenda

• Overview Presentation (10:00 – 10:45)

• Introductions

• NGWSP Overview

• Intake and River PP Project Overview

• JHA

• Questions

• Travel to the site (10:45 to 11:00)

• Tour the site (11:00 – Noon)

• Questions

• Adjourn

NGWSP Background

March 30, 2009

NGWSP Background

• Description

• Currently estimated at $2.2 Billion

• 2 Main Laterals (Cutter and San Juan) totaling 300 miles of Pipelines (20”-48”)

• 2 Conventional Water Treatment Plants with ultimate capacity of 5 & 38 MGD

• 19 Pumping Plants -- raw and finished water

• Numerous Storage Tanks

• Construction began – June 2012

• Complexities

• Cultural Resources and Environmental Compliance

• Land Acquisitions

• Bringing power to remote area

• Coordination with various Stakeholders and Jurisdictions

• Various Studies

Project Overview Map Cutter Lateral

San Juan Lateral

Operational Completed Under Construction In Design (As of February 2024)

FCWR

WTP

SJL Intake & River Pumping System

42” Line to Reservoir

Intake and River Pumping Plant

Project Overview Map - Raw Water System

Intake and River Pumping Plant

Reach 1 Pipeline

Reach 2 Pipeline

Pumping Plant 1

SJLWTP Regulating Tanks

Reach 3 Pipeline

SJLWTP

- Block 2-3 HDD

Block 2-3

SJL Intake & River Pumping Plant Scope

• Metal Building ~7,300 SQFT

• Demolition of Existing Pumping Plant

• Four (4) 900-HP Vertical Turbine Pumps

• Q = 71 CFS and TDH = 325 feet

• 3 Air Chambers

• Settling Channel Modifications

• Replace trash rake and sluice gate at intake

• Install gates and construct fish barrier weir and return channel plus some concrete modifications.

• Sitework & Cutoff Wall

• Steel Manifold Piping

• Water Quality Monitoring Equipment

• Electrical and SCADA Systems

Operation Integration with SJLWTP Design Build Contractor

SJL Intake & River Pumping Plant Coordination

4 Contractors In Play

SJL Intake & River Pumping Plant Scope

Temp Pumps Contractor and Possible Relocation

SJL Intake & River Pumping Plant Schedule

• Bids Due Date -- December 19, 2025 at 1:00 pm

• Bids Evaluation Completion Date -- January 16, 2026

• Award Date -- March 20, 2026

• Notice to Proceed Date – April 20, 2026

• Construction Completion Date – October 6, 2028

SJL Intake and River Pumping Plant

Job Hazard Analysis

Other Requirements

Questions and Answers

3895 US-64 Fruitland, NM 87416

Navajo-Gallup Water Supply Project (NGWSP)
Agenda
NGWSP Background
NGWSP Background
Project Overview Map
SJL Intake & River Pumping System
Project Overview Map - Raw Water System
SJL Intake & River Pumping Plant Scope
SJL Intake & River Pumping Plant Coordination
SJL Intake & River Pumping Plant Scope
SJL Intake & River Pumping Plant Schedule
SJL Intake and River Pumping Plant
SJL Intake and River Pumping Plant
SJL Intake and River Pumping Plant
SJL Intake and River Pumping Plant
SJL Intake and River Pumping Plant
SJL Intake and River Pumping Plant
Job Hazard Analysis
Job Hazard Analysis
Job Hazard Analysis
Other Requirements
Questions and Answers
Slide Number 23