This document is a pre-bid conference presentation for the Navajo-Gallup Water Supply Project (NGWSP) River Intake Pumping Plant, scheduled for October 8, 2025. The project, estimated at $2.2 billion, involves constructing two main laterals (Cutter and San Juan) totaling 300 miles of pipelines, two water treatment plants with capacities of 5 and 38 MGD, 19 pumping plants, and numerous storage tanks. Construction began in June 2012, with complexities including cultural resources compliance, land acquisitions, and coordination with multiple stakeholders.
The specific River Intake Pumping Plant component includes a 7,300 sq ft metal building, four 900-HP vertical turbine pumps, air chambers, settling channel modifications, and various infrastructure improvements. The project schedule indicates bid submissions are due December 19, 2025, with bid evaluation completed by January 16, 2026, and contract award anticipated on March 20, 2026. The construction is set to be completed by October 6, 2028. The pre-bid conference includes a site tour and a comprehensive job hazard analysis, with emergency contact information and safety procedures clearly outlined.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo-Gallup Water Supply Project (NGWSP)
October 8, 2025
River Intake Pumping Plant Pre-Bid Conference
Agenda
• Overview Presentation (10:00 – 10:45)
• Introductions
• NGWSP Overview
• Intake and River PP Project Overview
• JHA
• Questions
• Travel to the site (10:45 to 11:00)
• Tour the site (11:00 – Noon)
• Questions
• Adjourn
NGWSP Background
March 30, 2009
NGWSP Background
• Description
• Currently estimated at $2.2 Billion
• 2 Main Laterals (Cutter and San Juan) totaling 300 miles of Pipelines (20”-48”)
• 2 Conventional Water Treatment Plants with ultimate capacity of 5 & 38 MGD
• 19 Pumping Plants -- raw and finished water
• Numerous Storage Tanks
• Construction began – June 2012
• Complexities
• Cultural Resources and Environmental Compliance
• Land Acquisitions
• Bringing power to remote area
• Coordination with various Stakeholders and Jurisdictions
• Various Studies
Project Overview Map Cutter Lateral
San Juan Lateral
Operational Completed Under Construction In Design (As of February 2024)
FCWR
WTP
SJL Intake & River Pumping System
42” Line to Reservoir
Intake and River Pumping Plant
Project Overview Map - Raw Water System
Intake and River Pumping Plant
Reach 1 Pipeline
Reach 2 Pipeline
Pumping Plant 1
SJLWTP Regulating Tanks
Reach 3 Pipeline
SJLWTP
- Block 2-3 HDD
Block 2-3
SJL Intake & River Pumping Plant Scope
• Metal Building ~7,300 SQFT
• Demolition of Existing Pumping Plant
• Four (4) 900-HP Vertical Turbine Pumps
• Q = 71 CFS and TDH = 325 feet
• 3 Air Chambers
• Settling Channel Modifications
• Replace trash rake and sluice gate at intake
• Install gates and construct fish barrier weir and return channel plus some concrete modifications.
• Sitework & Cutoff Wall
• Steel Manifold Piping
• Water Quality Monitoring Equipment
• Electrical and SCADA Systems
Operation Integration with SJLWTP Design Build Contractor
SJL Intake & River Pumping Plant Coordination
4 Contractors In Play
SJL Intake & River Pumping Plant Scope
Temp Pumps Contractor and Possible Relocation
SJL Intake & River Pumping Plant Schedule
• Bids Due Date -- December 19, 2025 at 1:00 pm
• Bids Evaluation Completion Date -- January 16, 2026
• Award Date -- March 20, 2026
• Notice to Proceed Date – April 20, 2026
• Construction Completion Date – October 6, 2028
SJL Intake and River Pumping Plant
Job Hazard Analysis
Other Requirements
Questions and Answers
3895 US-64 Fruitland, NM 87416
| Navajo-Gallup Water Supply Project (NGWSP) |
| Agenda |
| NGWSP Background |
| NGWSP Background |
| Project Overview Map |
| SJL Intake & River Pumping System |
| Project Overview Map - Raw Water System |
| SJL Intake & River Pumping Plant Scope |
| SJL Intake & River Pumping Plant Coordination |
| SJL Intake & River Pumping Plant Scope |
| SJL Intake & River Pumping Plant Schedule |
| SJL Intake and River Pumping Plant |
| SJL Intake and River Pumping Plant |
| SJL Intake and River Pumping Plant |
| SJL Intake and River Pumping Plant |
| SJL Intake and River Pumping Plant |
| SJL Intake and River Pumping Plant |
| Job Hazard Analysis |
| Job Hazard Analysis |
| Job Hazard Analysis |
| Other Requirements |
| Questions and Answers |
| Slide Number 23 |
File details come from the government source that posted it. Updated .