Sol_140R4025R0023_Amd_0005.pdf
PDF 824 KB Posted
- Attached to
- NGWSP INTAKE & RIVER PUMPING PLANT Federal contract opportunity
- Solicitation number
- 140R4025R0023
About this file
This document is a federal solicitation amendment for the Navajo-Gallup Water Supply Project's San Juan Lateral Reach 1 Intake and River Pumping Plant, issued by the Bureau of Reclamation's Upper Colorado Region. Amendment 0005 provides Round #3 of contractor-submitted questions with Reclamation responses and updates specifications and drawings, specifically revising sections related to temporary utilities, pesticides, conductors and cables, and raceways and boxes. The comprehensive price schedule covers 118 contract line items (CLINs) spanning multiple construction and infrastructure categories, including mobilization, document management, electrical systems, concrete work, mechanical equipment, valves, cranes, and various specialized infrastructure components.
The solicitation covers a project period from 04/03/2026 to 10/20/2028, with price schedule items ranging from lump sum services to specific quantitative requirements like 34,000 cubic yards of common excavation, 17,000 linear feet of conductors and cables, and 130 MGal of water for dust abatement. The document includes attachments for specifications, drawings, geological information, wage determinations, and supplementary documents like past performance questionnaires and key personnel information. The project is located in San Juan County, New Mexico, and requires compliance with both New Mexico Gross Receipts Tax (6.8125%) and Navajo Nation Gross Receipts Tax (6.00%).
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R4025R0023 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Salt Lake City UT 84138
R40
125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation
09/24/20250005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/24/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is issued to:
*Provide Round #3 of the contractor submitted questions with Reclamation responses.
*Provide updated Specifications and Drawings as a result of the questions submitted. See
Updated Section J and Attachments #1.2 & #2.7.
The revised specifications sections are:
00 00 50 Section B
01 51 00 Temporary Utilities
01 57 00 Pesticides
26 05 10 Conductors and Cables
26 05 33 Raceways and Boxes
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Ashton Jones
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 14
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R4025R0023/0005
31 14 10 Topsoil Stripping, Stockpiling, and
Placement
33 11 15 PVC Pipe Drains
51 40 00 Streamflow Records and Climatic
Conditions
The revised drawings are:
Sheet # Drawing # Title
31 1695-D-62061 River Intake
Demolition Outline
34 1695-D-62064 Settling Channel
Demolition Outline Partial Plan
36 1695-D-62066 Settling Channel
Demolition Outline Sections
37 1695-D-62067 Settling Channel
Demolition Outline Sections
42 1695-D-62072 Outlet Channel
Demolition Outline Sections
43 1695-D-62073 Outlet Channel
Demolition Outline Sections
44 1695-D-62074 Control Structure
Demolition Outline
45 1695-D-62075 Control Structure
Demolition Outline Detail
47 1695-D-62077 Outlet Channel
Demolition Outline Detail
48 1695-D-62078 Outlet Channel
Demolition Outline Detail
55 1695-D-62085 River Intake
Concrete Outline
56 1695-D-62086 River Intake
Concrete Outline
67 1695-D-62098 Settling Channel
Underdrain System
123 1695-D-62412 Fish Barrier Weir
Plates
124 1695-D-62412 Overflow Weir Plates
*Update Section B.
Period of Performance: 04/03/2026 to 10/20/2028
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation
Document No.
140R4025R0023-0005
Document Title
NGWSP Intake & River PP
Continuation of Section B – Supplies or Services and Price
SECTION B – San Juan Lateral – Reach 1 Intake and River Pumping Plant Navajo- Gallup Water Supply Project, New Mexico
PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only. Except as provided in contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1 of Price Schedule.
(e) Definitions:
CLIN – Contract Line Item Number
(f) Note: In accordance with Section 7-9-3.3 of New Mexico Statutes Annotated (NMSA) 1978 and Section 402 of Navajo Nation’s Business Activity Tax Statute, it is Contractor’s responsibility to ensure that all applicable New Mexico Gross Receipts Tax and Navajo Nation Gross Receipts Tax are included in their price proposal.
(g) In accordance with FAR 52.232-5 (Payments under Fixed-Price Construction Contracts) (b)(2), payment may be approved for materials delivered to Contractor at locations other than the site if Contractor obtains CO approval prior to making arrangements for obtaining the materials.
Contractor shall also be required to complete a “Materials on Hand Certificate” which will certify:
(1) Materials described for use on identified contract.
(2) Materials are clearly marked to identify that they belong to contract cited.
(3) Full title for those materials vested in Prime Contractor sited.
(4) Materials are free of liens and encumbrances.
(5) Materials are properly store, secured, and protected against loss or damage.
PRICE SCHEDULE
CLIN Section Supplies or
Services Quantity and
Unit Unit Price Amount
1 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum of $
2 01 31 30 Contract Document Management System
For the lump sum of $
3 01 33 26 Electrical Drawings and Data
For the lump sum of $
4 01 52 10 Government Field Laboratory
For the lump sum of $
5 01 56 15 Utility Crossing Investigation
For the lump sum of $
6 01 78 30 As-Built Drawings For the lump sum of $200,000
7 01 78 30 Final Drawings For the lump sum of $200,000
8 01 78 30 Operations and Maintenance (O&M) Manuals
For the lump sum of $200,000
9 01 80 15 Commissioning For the lump sum of
10 02 41 00 Demolition of Existing Installations
For the lump sum of $
11 03 20 30 Drilling Holes for Anchor Bars and Epoxy Grouting Bars in Place
590 lf $ $
12 03 30 00 Cast-in-Place Concrete
2700 yd3 $ $
13 03 30 00 RMSC
(Reinforced Mass Concrete)
525 yd3 $ $
Supplies or
Services Quantity and
Unit Unit Price Amount
14 03 30 00 Lean Concrete 1050 yd3 $ $
15 03 30 00 Concrete Pan 400 lf $ $
16 03 30 00 Miscellaneous Concrete
For the lump sum of $
17 03 48 00 Precast Blowoff Vault
1 Each $
18 03 48 00 Precast Electrical Pullboxes
13 Each $
19 03 81 10 Saw-cutting Existing Concrete
870 lf $ $
20 03 81 10 Concrete Removal, Hydrodemolition, 1-inch Calibration Settings
180 yd2 $ $
21 03 81 10 Concrete Removal 2,920,000 lb $ $
22 04 22 10 Reinforced Concrete Unit Masonry Assemblies
5,800 ft2 $ $
23 05 50 00 Metal Fabrications For the lump sum of $
24 08 31 25 Floor Access Hatches
For the lump sum of $
25 13 34 21 Metal Building Systems
For the lump sum of $
26 21 11 16 Fire Hydrants For the lump sum of $
27 21 25 00 Hybrid Water Mist Fire Protection System
For the lump sum of $
Supplies or
Services Quantity and
Unit Unit Price Amount
28 22 11 10 Plant Auxiliary Water Systems
For the lump sum of $
29 22 13 16 Plant Drain Piping Systems
For the lump sum of $
30 23 00 00 Heating, Ventilating, and Air-Conditioning (HVAC) System
For the lump sum of $
31 23 08 00 Commissioning -
HVAC
For the lump sum of $
32 25 00 01 System Control and Monitoring
For the lump sum of $
33 26 05 10 Conductors and Cables
17,000 lf $ $
33 26 05 10 Conductors and Cables (Less than or equal to 2
AWG)
For the lump sum of
33A 26 05 10 Conductors and Cables (Greater than 2 AWG)
For the lump sum of $
34 26 05 13 Medium-Voltage Power Cable
4,200 lf $ $
35 26 05 13 Medium-Voltage Power Cable Accessories
For the lump sum of $
36 26 05 20 Ground Cable 2,030 lf $ $
37 26 05 20 Ground Rods 9 Each $ $
38 26 05 20 Electrical Ground Resistance Test
39 26 05 33 Electrical Conduit 11,200 lf $ $
Supplies or
Services Quantity and
Unit Unit Price Amount
For the lump sum of
40 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
41 26 05 36 Cable Trays 600 lf $ $
42 26 12 19 Install Government Supplied Pad Mounted Transformer
For the lump sum of $
43 26 17 20 Metal-Clad Switchgear Assembly
For the lump sum of $
44 26 18 39 Medium-Voltage Motor Controllers
For the lump sum of $
45 26 22 12 Dry-Type Transformer
For the lump sum of $
46 26 24 13 Switchboards For the lump sum of $
47 26 24 41 Distribution Panelboards
For the lump sum of $
48 26 26 10 Transformer Load Center
For the lump sum of $
49 26 27 40 Wiring Devices For the lump sum of $
50 26 32 10 Diesel Engine- Generator Set
For the lump sum of $
51 26 42 12 Buried Impressed Current Cathodic Protection
Supplies or
Services Quantity and
Unit Unit Price Amount
52 26 42 14 Submerged Impressed Current Cathodic Protection
For the lump sum of $
53 26 42 15 Galvanic Anode Cathodic Protection for Welded Steel Tanks
For the lump sum of $
54 26 51 00 Interior Lighting For the lump sum of $
55 26 52 00 Emergency and Exit Lighting
For the lump sum of $
56 26 56 00 Exterior Lighting For the lump sum of $
57 27 30 01 Telephone System For the lump sum of $
58 28 10 01 Security and Surveillance System
For the lump sum of $
59 28 31 00 Fire Detection and Alarm
For the lump sum of $
60 31 02 10 Water for Dust Abatement
130 MGal $ $
61 31 02 30 Dust Palliative 5.5 Acre $ $
62 31 03 10 Diversion and Care of Stream During Construction
For the lump sum of $
63 31 03 33 Removal and Control of Water
For the lump sum of
64 31 23 11 Common Excavation
34,000 yd3 $ $
65 31 23 11 Rock Excavation 850 yd3 $ $
Supplies or
Services Quantity and
Unit Unit Price Amount
66 31 23 11 Backfill 30,000 yd3 $ $
67 31 24 18 Gravel Underdrain System
165 yd3 $ $
68 31 24 20 Cement-Bentonite Slurry Cutoff Wall Spoils
For the lump sum of $
69 31 32 32 Geotextile 19,500 yd2 $ $
70 31 32 35 Geocomposite 770 yd2 $ $
71 31 37 00 Riprap 187 yd3 $ $
72 31 56 20 Cement-Bentonite (C-B) Slurry Cutoff Wall
3,900 yd2 $ $
73 32 15 10 Gravel Surfacing 2,900 yd3 $ $
74 32 31 10 Chain Link Fence 3,300 lf $ $
75 32 91 60 Erosion Control Blanket
8,700 yd2 $ $
76 32 92 20 Seeding 1.6 Acre $ $
77 33 09 12 Open Channel Flow Meter
For the lump sum of
78 33 09 13 Pressure Differential Flowmeter Systems
For the lump sum of $
79 33 09 15 Water Quality Monitoring Instrumentation System
For the lump sum of $
80 33 09 16 Water Level Measuring Devices
Supplies or
Services Quantity and
Unit Unit Price Amount
81 33 11 15 PVC Collector and Drain Pipe
250 lf $ $
82 33 12 71 Vertical Turbine Pumping Units
For the lump sum of $
83 33 12 79 Submersible Pumping Unit
For the lump sum of $
84 33 16 14 Air Chambers and Air Compressors
For the lump sum of $
85 33 41 00 PVC Storm Sewer Pipe
130 lf $ $
86 35 21 10 Trashracks For the lump sum of $
87 35 21 21 Coated Bulkhead Gates and Guides
2 each $ $
88 35 21 60 Baffle Gates and Actuators
For the lump sum of $
89 35 21 70 Trash Rake For the lump sum of $
90 35 21 95 Steel Manifold Piping
For the lump sum of $
91 35 22 10 Slide Gates and Actuators
For the lump sum of $
92 35 22 14 Valve Box 1 Each $ $
93 35 22 14 20-inch AWWA 300 Motor Operated Ball Valves
4 Each $ $
94 35 22 14 20-inch ANSI 250 Tilted Disc Check Valve
4 Each $ $
95 35 22 14 42-inch AWWA 250B Manually
1 Each $ $
Supplies or
Services Quantity and
Unit Unit Price Amount
Operated Butterfly Valve
96 35 22 14 18-inch AWWA 250B Motor Operated Butterfly Valve
2 Each $ $
96A 35 22 14 20-inch AWWA 250B Motor Operated Butterfly Valve
1 Each $ $
97 35 22 14 20-inch AWWA 250B Manually Operated Butterfly Valve
6 Each 7 Each
98 35 22 14 12-inch AWWA 300 Manually Operated Buried Ball Valve
1 Each $ $
99 35 22 14 6-inch AWWA C509 or C515 Manually Operated Buried Gate Valve
1 Each $ $
100 35 22 14 18-inch Pressure Sustaining Valve
1 Each $ $
101 35 22 14 6-inch Manually Operated Flanged Butterfly Valve
4 Each $ $
102 35 22 14 Automatic ball-drip drain value
1 Each $ $
103 35 22 14 3-inch Ball Valve 5 Each $ $
104 35 22 14 2-inch Ball Valve 3 Each $ $
Supplies or
Services Quantity and
Unit Unit Price Amount
105 35 22 14 ¾-inch Ball Valve
5 Each $ $
106 35 22 14 Combination Air Valve Assembly
5 Each $ $
107 35 22 14 Throttling Air Valve Assembly
4 Each $ $
108 35 22 14 2-inch Globe Valve
3 Each $ $
109 35 22 14 ¾-inch Globe Valve
3 Each $ $
110 35 22 14 Pressure Indicator Transmitter
1 Each $ $
111 35 22 14 Pressure Switch 4 Each $ $
112 35 22 14 Pressure Gauge 5 Each $ $
113 35 79 20 Debris Boom For the lump sum of $
114 41 22 10 Davit Crane For the lump sum of $
115 41 22 12 Gantry Crane For the lump sum of $
116 41 22 23 Bulkhead Monorail Crane
For the lump sum of $
117 41 62 23 Track Loader For the lump sum of $
118 41 63 23 Flatbed Truck For the lump sum of $
Subtotal FOR PRICE SCHEDULE B $_________________
Estimated NMGRT at 6.8125% for Price Schedule B (if applicable) $_________________
Estimated Navajo Nation Taxes at 6.00% for Price Schedule B (if applicable) $_________________
TOTAL FOR PRICE SCHEDULE B $_________________
END OF SUPPLIES OR SERVICES AND PRICES
SECTION J – List of Attachments and Exhibits
Attachment Number Description Number of Pages
Attachment #1 00 00 01 – Specifications 09242025 1,544 Attachment #1.1 (Amd 0004) 00 00 01 – Specifications 11212025 230 Attachment #1.2 (Amd 0005) 00 00 01 – Specifications 12192025 60 Attachment #2 Drawings
Attachment #2.1 00 00 02_Dwgs-B_001-100_22x34_09-24-2025 100 Attachment #2.2 00 00 02_Dwgs-B_101-200_22x34_09-24-2025 100 Attachment #2.3 00 00 02_Dwgs-B_201-285_22x34_09-24-2025 85 Attachment #2.4 00 00 02_Standard Dwgs-B_286-320_22x34_09-
24-2025
Attachment #2.5 00 00 02_Dwgs-B_321-356_22x34_09/24/2025 36 Attachment #2.6 (Amd 0004) 00 00 02 – Drawings 11212025 10 Attachment #2.7 (Amd 0005) 00 00 02 – Drawings 12192025 15 Attachment #3 00 00 02A_Geology_04102025 62 Attachment #4 WD NM20250040 Heavy – San Juan County, NM
Attachment #5 (Amd 0004) WD NM20250046 Building – San Juan County, NM
Attachment #6 Past Performance Questionnaire 4 Attachment #7 Project Experience 1 Attachment #8 Key Personnel 2 Attachment #9 Subcontracting Plan Template 9
File details come from the government source that posted it. Updated .