MIA ATCT Precast Panel Repair

Closed Solicitation Posted

Solicitation number
697DCK-22-R-00172
Agency
Southwestern Region Federal Aviation Administration, Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1BA Construction Of Air Traffic Control Towers
Place of performance
Miami, Florida, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for precast panel repairs to the Miami International Airport Air Traffic Control Tower located in Miami, Florida. The Federal Aviation Administration Southwestern Region requires repair services including cleaning, concrete surface preparation, fiber-reinforced polymer composite strengthening, new sealants and flashing. Offerors must be registered in the System for Award Management and submit proposals in accordance with Sections L and M of the solicitation by June 30, 2022. An optional site visit is available and questions regarding the solicitation are due by May 2, 2022.

This is a total small business set-aside requirement under NAICS code 238990 and PSC code R499. The incumbent contractor is unknown. Offerors must demonstrate past performance and price proposals. The precast panel repairs will address approximately 30 linear feet of cracks, replace all panel joint seals, and coat the entire panel surfaces at the Miami International Airport facility over a proposed performance period of 183 calendar days.

Notice text

9 versions

Update #9 · Latest ·

Update 6/28/22: Question and Answer #4 is hereby incorporated as an attachment.  The attachment is listed as, "Q and A Set 4".  Three additional photos to support the answer is also included as attachments.  

**************************************************************************************************************

Update 6/23/22:  Question and Answer #3 is hereby incorporated as an attachment.  The attachment is listed as, "Q and A Set 3".  

**************************************************************************************************************

Update 6/21/22: Amendment 04 is hereby released extending the solicitation due date to June 30.  Additional drawings are also hereby incorporated providing further information regarding the flight tower.  There is a total of four additional drawings being incorporated.  

**************************************************************************************************************

Update 6/13/2022: Q&A is hereby incorporated as an attachment and outlines the alternative product list. The approved data sheets are also uploaded for review.  

**************************************************************************************************************

Update 6/9/2022: Amendment 0003 has been uploaded to this posting.  Review amendment and submit proposal according to all SIR and amendment requirement. 

*************************************************************************************************************

Updates 5/12/2022: Amendment 0002 has been uploaded to this posting along with attachment J1 and J1a. Review amendment and submit proposal according to all SIR and amendment requirement. 

**************************************************************************************************************

Updated 5/2/2022: Amendment 0001 has been uploaded to this posting to extend the RFI and proposal submission due date. Review amendment and submit proposal according to all SIR and amendment requirement. 

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Update #8 ·

Update 6/23/22:  Question and Answer #3 is hereby incorporated as an attachment.  The attachment is listed as, "Q and A Set 3".  

**************************************************************************************************************

Update 6/21/22: Amendment 04 is hereby released extending the solicitation due date to June 30.  Additional drawings are also hereby incorporated providing further information regarding the flight tower.  There is a total of four additional drawings being incorporated.  

**************************************************************************************************************

Update 6/13/2022: Q&A is hereby incorporated as an attachment and outlines the alternative product list. The approved data sheets are also uploaded for review.  

**************************************************************************************************************

Update 6/9/2022: Amendment 0003 has been uploaded to this posting.  Review amendment and submit proposal according to all SIR and amendment requirement. 

*************************************************************************************************************

Updates 5/12/2022: Amendment 0002 has been uploaded to this posting along with attachment J1 and J1a. Review amendment and submit proposal according to all SIR and amendment requirement. 

**************************************************************************************************************

Updated 5/2/2022: Amendment 0001 has been uploaded to this posting to extend the RFI and proposal submission due date. Review amendment and submit proposal according to all SIR and amendment requirement. 

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Update #7 ·

Update 6/21/22: Amendment 04 is hereby released extending the solicitation due date to June 30.  Additional drawings are also hereby incorporated providing further information regarding the flight tower.  There is a total of four additional drawings being incorporated.  

**************************************************************************************************************

Update 6/13/2022: Q&A is hereby incorporated as an attachment and outlines the alternative product list. The approved data sheets are also uploaded for review.  

**************************************************************************************************************

Update 6/9/2022: Amendment 0003 has been uploaded to this posting.  Review amendment and submit proposal according to all SIR and amendment requirement. 

*************************************************************************************************************

Updates 5/12/2022: Amendment 0002 has been uploaded to this posting along with attachment J1 and J1a. Review amendment and submit proposal according to all SIR and amendment requirement. 

**************************************************************************************************************

Updated 5/2/2022: Amendment 0001 has been uploaded to this posting to extend the RFI and proposal submission due date. Review amendment and submit proposal according to all SIR and amendment requirement. 

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Update #6 ·

Update 6/21/22: Additional drawings are hereby incorporated providing further information regarding the flight tower.  There is a total of four additional drawings being incorporated.  

**************************************************************************************************************

Update 6/13/2022: Q&A is hereby incorporated as an attachment and outlines the alternative product list. The approved data sheets are also uploaded for review.  

**************************************************************************************************************

Update 6/9/2022: Amendment 0003 has been uploaded to this posting.  Review amendment and submit proposal according to all SIR and amendment requirement. 

*************************************************************************************************************

Updates 5/12/2022: Amendment 0002 has been uploaded to this posting along with attachment J1 and J1a. Review amendment and submit proposal according to all SIR and amendment requirement. 

**************************************************************************************************************

Updated 5/2/2022: Amendment 0001 has been uploaded to this posting to extend the RFI and proposal submission due date. Review amendment and submit proposal according to all SIR and amendment requirement. 

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Update #5 ·

Update 6/13/2022: Q&A is hereby incorporated as an attachment and outlines the alternative product list. The approved data sheets are also uploaded for review.  

**************************************************************************************************************

Update 6/9/2022: Amendment 0003 has been uploaded to this posting.  Review amendment and submit proposal according to all SIR and amendment requirement. 

*************************************************************************************************************

Updates 5/12/2022: Amendment 0002 has been uploaded to this posting along with attachment J1 and J1a. Review amendment and submit proposal according to all SIR and amendment requirement. 

**************************************************************************************************************

Updated 5/2/2022: Amendment 0001 has been uploaded to this posting to extend the RFI and proposal submission due date. Review amendment and submit proposal according to all SIR and amendment requirement. 

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Update #4 ·

Update 6/9/2022: Amendment 0003 has been uploaded to this posting.  Review amendment and submit proposal according to all SIR and amendment requirement. 

*************************************************************************************************************

Updates 5/12/2022: Amendment 0002 has been uploaded to this posting along with attachment J1 and J1a. Review amendment and submit proposal according to all SIR and amendment requirement. 

**************************************************************************************************************

Updated 5/2/2022: Amendment 0001 has been uploaded to this posting to extend the RFI and proposal submission due date. Review amendment and submit proposal according to all SIR and amendment requirement. 

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Update #3 ·

Updates 5/12/2022: Amendment 0002 has been uploaded to this posting along with attachment J1 and J1a. Review amendment and submit proposal according to all SIR and amendment requirement. 

Updated 5/2/2022: Amendment 0001 has been uploaded to this posting to extend the RFI and proposal submission due date. Review amendment and submit proposal according to all SIR and amendment requirement. 

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Update #2 ·

Updates 5/2/2022: Amendment 0001 has been uploaded to this posting to extend the RFI and proposal submission due date. Review amendment and submit proposal according to all SIR and amendment requirement. 

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Update #1 ·

The Federal Aviation Administration (FAA) has a requirement for the precast panel repairs of the Miami International Airport (MIA) Air Traffic Control Tower (ATCT) located at Miami, FL. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement.

All questions regarding the SIR must be submitted in writing to Mr. Sam Culberth at sam.g.culberth@faa.gov and courtesy copy thuylinh.t.trannguyen@faa.gov. All questions must be received no later than May 2, 2022 at 1500 EDT.

An optional site visit is schedule for this requirement. The site visit information can be found in the SIR Section L.3.

To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR.

Attachments

Files attached to this notice, newest first
File Type Posted
20220628_073123.jpg JPG image
Questions and Response Set 4.docx DOCX document
20220628_073352.jpg JPG image
20220628_073400.jpg JPG image
Q and A Set 3.pdf PDF
697DCK-22-R-00172 Amend 04.pdf PDF
so-d-102506-a17.pdf PDF
so-d-102506-a15.pdf PDF
so-d-102506-a23.pdf PDF
so-d-102506-a16.pdf PDF
Tyfo SCH-41S 030622.pdf PDF
Tyfo S Epoxy 030622.pdf PDF
SurCoPrimer Data Sheets.pdf PDF
Q and A Alternative Product MIA Precast.pdf PDF
697DCK-22-R-00172 Amd 3.pdf PDF
Q and A Set 1 MIA Precast Panel Repair.docx DOCX document
MIA ATCT Precast Panel Repair Drawings REVISED 05112022.pdf PDF
MIA ATCT Precast Panel Repair Specifications REVISED_05112022.pdf PDF
697DCK-22-R-00172 0002.pdf PDF
697DCK-22-R-00172 00001.pdf PDF
MIA ATCT Precast Panel Repair Specifications 04072022.pdf PDF
COVID-19 Contractual Requirement Rev 1 8-26-20.pdf PDF
L1. BidBond.pdf PDF
L2. Past Performance Questionnaire.pdf PDF
L3. Price Proposal.xlsx XLSX spreadsheet
MIA ATCT Precast Panel Repair Drawings REVISED.pdf PDF
697DCK-22-R-00172.pdf PDF
MIA ATCT Precast Panel Repair Operational Risk Management Plan REVISED.pdf PDF
Wage Rate FL20220215 4.01.22.pdf PDF
L4. 7460-1.pdf PDF
Show all 30

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity