Q and A Set 1 MIA Precast Panel Repair.docx

DOCX document 30 KB Posted

Attached to
MIA ATCT Precast Panel Repair Federal contract opportunity
Solicitation number
697DCK-22-R-00172
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document contains questions and responses regarding a federal solicitation for precast panel repairs to the Miami International Airport Air Traffic Control Tower. The solicitation seeks repairs to address strengthening of concrete and requires fiber reinforced polymer reinforcement fabric, epoxy saturant, and concrete surface primer. Responses indicate the contracting agency is currently determining if alternate products for strengthening concrete and adhesive resin will be acceptable. The document also provides a list of companies and points of contact that attended an optional site visit.

View the file

Other files for this federal contract opportunity

Other files attached to MIA ATCT Precast Panel Repair, newest first.
File Type Posted
20220628_073352.jpg JPG image
20220628_073400.jpg JPG image
20220628_073123.jpg JPG image
Questions and Response Set 4.docx DOCX document
Q and A Set 3.pdf PDF
697DCK-22-R-00172 Amend 04.pdf PDF
so-d-102506-a15.pdf PDF
so-d-102506-a23.pdf PDF
so-d-102506-a16.pdf PDF
so-d-102506-a17.pdf PDF
Tyfo S Epoxy 030622.pdf PDF
SurCoPrimer Data Sheets.pdf PDF
Q and A Alternative Product MIA Precast.pdf PDF
Tyfo SCH-41S 030622.pdf PDF
697DCK-22-R-00172 Amd 3.pdf PDF
697DCK-22-R-00172 0002.pdf PDF
MIA ATCT Precast Panel Repair Drawings REVISED 05112022.pdf PDF
MIA ATCT Precast Panel Repair Specifications REVISED_05112022.pdf PDF
697DCK-22-R-00172 00001.pdf PDF
Wage Rate FL20220215 4.01.22.pdf PDF
L4. 7460-1.pdf PDF
MIA ATCT Precast Panel Repair Drawings REVISED.pdf PDF
697DCK-22-R-00172.pdf PDF
MIA ATCT Precast Panel Repair Operational Risk Management Plan REVISED.pdf PDF
MIA ATCT Precast Panel Repair Specifications 04072022.pdf PDF
COVID-19 Contractual Requirement Rev 1 8-26-20.pdf PDF
L1. BidBond.pdf PDF
L2. Past Performance Questionnaire.pdf PDF
L3. Price Proposal.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Response Set #1 MIA Precast Panel Repair

697DCK-22-R-00172

Question 1: Is there any information available as to potential bidders for this project such as site-visit log, planholder’s list, or RFI log?

Answer 1: See table 1 below for a list of site visit attendees.

Question 2: May I get a list of the attendees to the Site Visit that took place?

Answer 2: See table 1 below for a list of site visit attendees.

Question 3: I would like to please request the following products as alternates/equals to the specified products listed below. Material data sheets are attached for the submitted products. Please feel free to let me know if any further information is needed.

Strengthening of Concrete 03-01-30-3

2.1 FRP Reinforcement Fabric and/or Laminate: Tyfo SCH-41 Composite Systems by Fyfe Companies

2.3 Saturant Tyfo S Epoxy by Fyfe Companies

2.2 Concrete Surface Primer and Corrosion Inhibitor – Surco Primer FRP & Corrosion Inhibitor by Surtreat

Answer 3: We are currently determining if this product will be acceptable, more information will be provided on a future amendment prior to the proposal due date.

Question 4: I’m not sure if this should go to you, yet I came across this just now in the spec and wanted to see if FYFE could be an approved equal for the material?

C. Approved products are:

1. Sika Carbodur Adhesive Resin, Sika Corp.

2. Alternate products must be submitted and approved by the Engineer a minimum of two weeks prior to the bid date.

Answer 4: We are currently determining if this product will be acceptable, more information will be provided on a future amendment prior to the proposal due date.

Question 5: I am currently working with DYWIDAG-Systems International to supply them the FRP needed to retrofit the MIA ACTC Towers.

I am attaching the data sheet of the Tyfo SCH System within this email to have it approved – please confirm the approval of the system?

Answer 5: We are currently determining if this product will be acceptable, more information will be provided on a future amendment prior to the proposal due date.

Table 1: Site Visit Attendees for MIA Precast Panel Repair

Name
Company
Email
Phone
Keith Kruse
Coordinated Systems Consulting
kkruse@coordsystems.com
443-858-2760
Andrew Rossberg
A&P Contracting
arossberg@apcontractingco.com
516-270-5925
Ana Kehrer
A&P Contracting
akehrer@apcontractingco.com
954-864-0035

File details come from the government source that posted it. Updated .