This document contains questions and answers regarding a solicitation for precast panel repairs to the Miami International Airport Air Traffic Control Tower. The Federal Aviation Administration is seeking offers to repair precast panels at the MIA ATCT located in Miami, Florida. An optional site visit is scheduled and offerors must be registered in the System for Award Management to be considered for award. Questions regarding the solicitation must be submitted by May 2nd, 2022 and proposals are due on the date specified in the solicitation. A field representative office will not be required as the FAA representative will use existing facility space.

View the file

Other files for this federal contract opportunity

Other files attached to MIA ATCT Precast Panel Repair, newest first.
File Type Posted
20220628_073352.jpg JPG image
20220628_073400.jpg JPG image
20220628_073123.jpg JPG image
Questions and Response Set 4.docx DOCX document
697DCK-22-R-00172 Amend 04.pdf PDF
so-d-102506-a17.pdf PDF
so-d-102506-a15.pdf PDF
so-d-102506-a23.pdf PDF
so-d-102506-a16.pdf PDF
Tyfo SCH-41S 030622.pdf PDF
Tyfo S Epoxy 030622.pdf PDF
SurCoPrimer Data Sheets.pdf PDF
Q and A Alternative Product MIA Precast.pdf PDF
697DCK-22-R-00172 Amd 3.pdf PDF
Q and A Set 1 MIA Precast Panel Repair.docx DOCX document
MIA ATCT Precast Panel Repair Drawings REVISED 05112022.pdf PDF
MIA ATCT Precast Panel Repair Specifications REVISED_05112022.pdf PDF
697DCK-22-R-00172 0002.pdf PDF
697DCK-22-R-00172 00001.pdf PDF
MIA ATCT Precast Panel Repair Specifications 04072022.pdf PDF
COVID-19 Contractual Requirement Rev 1 8-26-20.pdf PDF
L1. BidBond.pdf PDF
L2. Past Performance Questionnaire.pdf PDF
L3. Price Proposal.xlsx XLSX spreadsheet
MIA ATCT Precast Panel Repair Drawings REVISED.pdf PDF
Wage Rate FL20220215 4.01.22.pdf PDF
L4. 7460-1.pdf PDF
697DCK-22-R-00172.pdf PDF
MIA ATCT Precast Panel Repair Operational Risk Management Plan REVISED.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Response Set #3 MIA Precast Panel Repair

697DCK-22-R-00172

Question 1: Section 01 50 00 paragraph 3.4.D of the specifications calls for temporary fire protection. Is this for within the tower if we were to have to disable any permanent fire protection, or is it calling for temporary fire protection in the temporary FAA Field Rep's Office?

Answer 1: This specification section is if we needed to disable any of the permanent fire protection/detection in the tower facility.

Question 2: Regarding the temporary FAA Field Rep's Office specified in section 01 50 10 of the specifications: will this structure require helical piles and strapping to meet Miami-Dade hurricane requirements for temporary structures?

Answer 2: After verifying with the facility, a FAA Field Representatives Office will not be a requirement on this job. The FAA Field representative will utilize a space within the facility as an office.