This is an attachment listing eleven federally-funded airfield infrastructure repair projects across multiple Air Force installations. The projects encompass horizontal airfield pavements, lighting systems, electrical distribution, and drainage infrastructure requiring comprehensive design, engineering, and construction services.
The projects span eight Air Force installations: Davis-Monthan AFB (runway 12/30 full-depth replacement with approximately 166,417 square yards of Portland Cement Concrete and 54,472 square yards of asphalt shoulders); Kirtland AFB (Apron C reconstruction of approximately 680,000 square feet with 16 inches of PCC, lighting installation, aircraft tie-downs, and grounding systems); Laughlin AFB (two projects including apron rows E-H replacement of 36,337 square feet and center runway 13C/31C repair of 1,327,800 square feet); Tinker AFB (AWACS Apron P3 replacement of approximately 63,700 square yards); Vance AFB (apron pavement demolition and replacement of approximately 320,710 square yards with Central Aircraft Support System drainage); and Eareckson Air Station on Wake Island and Shemya Island in Alaska (airfield lighting and control system replacement, electrical power distribution upgrades, airfield drainage rehabilitation, and approach lighting system repairs). All projects integrate sustainable principles in accordance with UFC 1-200-02 standards and include work such as pavement markings, joint sealant replacement, erosion protection, hazardous materials abatement, and equipment installation. Project scopes reference compliance with UFC standards (UFC 3-260-01, UFC 3-260-02, UFC 3-260-04, UFC 3-535-01, and UFC 3-201-01) and FAA Advisory Circulars where applicable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. DAVIS-MONTHAN AFB — Project # FBNV190001 Repair Runway 12/30 Scope of Work Summary: Repair Runway 13/31 by full-depth replacement of the runway asphalt pavement sections with Portland Cement Concrete (PCC) (approximately 166,417 SY), replacing various distressed PCC panels, and performing routine maintenance of the PCC at runway ends. Replace asphalt shoulders with new asphalt (approximately 54,472 SY). Replace asphalt overruns (approximately 46,200 SY) with new concrete extending 100 feet on either side of the arresting system cable and new asphalt for the remainder of the overruns. All work to be designed in accordance with UFC 3-260-01 and UFC 3-260-02, integrating sustainable principles in accordance with UFC 1-200-02.
2. KIRTLAND AFB — Project # MHMV190054 Repair Apron C (SUS) Scope of Work Summary: Full-depth PCC reconstruction of Apron C consisting of 16 inches of PCC and 8 inches of aggregate base course over compacted subgrade across approximately 63,200 SM (680,000 SF) based on medium-load airfield and Type B traffic area design. Reinforce undersize and odd-shaped edge slabs. Install 15 lighting masts with mast-mounted fixtures and 10 hangar-mounted lighting fixtures for apron use and security. Install replacement aircraft tie-downs, aircraft grounding systems, and supporting utilities.
3. LAUGHLIN AFB — Project # MXDP161018 REPAIR APRON ROWS E, F, G, AND H Scope of Work Summary: Provide all labor, material, and equipment for construction in apron areas E, F, G, and H consisting of: remove and replace all existing concrete, base material, and subbase material (approximately 36,337 SF). Compact base and subbase material to standards prescribed. Restripe to meet standards prescribed. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.
4. LAUGHLIN AFB — Project # MXDP161004 REPAIR CENTER RUNWAY, 13C/31C Scope of Work Summary: Provide all labor, materials and equipment necessary to repair Runway 13C/31C as required (8,852 feet by 150 feet, totaling approximately 1,327,800 SF). The work will include milling, grading and localized structural distress correction, overlay, and full depth crack sealant as required in accordance with UFC 3-260-01, UFC 3-260-02, FAA AC 150/5340-1M regarding pavement markings, and UFC 1-200-02 sustainable principles.
5. TINKER AFB — Project # WWYK140085A (DD 1391 Child Project # WWYK140085) Repair Airfield Apron, AWACS Apron P3 Scope of Work Summary: Repair Airfield Apron, AWACS Apron P3 (approximately 63,700 SY) as part of a nine-phase project to repair by replacement major portions of aircraft parking Apron A (Facility 51116). Work includes demolition and replacement of PCC surface, base and sub-base layers, joint sealant, aircraft tie-downs and ground points, and striping across the section lying west of WWYK150025, which will be encompassed by the buried security sensor line to be installed. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.
6. VANCE AFB — Project # XTLF221008 DSN - Repair Apron Pavement, B7001 Scope of Work Summary: Demolish and replace PCC slabs to include surface, base and sub-base layers at the Main Parking Apron, Pea Patch Apron, and Compass Rose Apron (approximately 320,710 SY). Mill and overlay existing asphalt shoulders on north and south edge of the Main Parking Apron and south edge of the Main Parking Apron (approximately 3,564 SY). Construct 25-ft asphalt shoulder at Pea Patch, Parallel Taxilane, and Main Parking Apron/Taxiway A intersection (approximately 12,460 SY). Install Central Aircraft Support System (CASS) drainage and implement other stormwater system repairs. Install pavement markings IAW UFC 3-260-04.
7. EARECKSON AIR STATION (WAKE ISLAND AIRFIELD) — Project # YGFZ180005 Repair Alpha Aprons, Taxiways A, B, C, D, E & Warm Up Pad (SUS) Scope of Work Summary: Repair deteriorated Asphalt Concrete (AC) pavement by partial-depth replacement (3-inch mill and overlay) on Alpha Apron (A11B), Taxiways Alpha (T04A1, T01A2, T15A), Bravo (T11C1, T03A, T11A, T14A), Charlie (T10C1, T10C, T13C), Delta (T05A1, T05A, T12A), Echo (T06A, T08A, T09A), Warm Up Pad (A13B), and airfield shoulders. Within Visual Flight Rules holding positions, remove approximately 2 inches of AC surface and 3 inches of underlying material and install 5 inches of AC at Taxiways Alpha, Bravo, Charlie, and Delta. Perform full-depth AC pavement repair at the Runway 10-28 high-severity swell location (removing underlying material and buried metal object). Remove and replace impacted taxiway edge lights per UFC 3-535-01 (including new L-867 base cans, drain lines, LED fixtures, isolation transformers, and 5 kV cable homerun replacement); remove and reinstall runway edge lights; install new guidance signs on paved housekeeping pads; remark all impacted airfield pavement markings per UFC 3-260-04; perform runway rubber removal; and replace deteriorated grounding rods at eight concrete hard-stands on Alpha Apron.
8. EARECKSON AIR STATION, ALASKA — Project # VNMH170001 Repair Airfield Drainage and Shoulders (SUS) Scope of Work Summary: Repair by replacement and rehabilitation of approximately 6,165 LF of the airfield stormwater drainage network (18- to 36-inch C900 PVC culverts) across the west, center, and east drainage basins serving Runway 10-28 and parking aprons to mitigate ponding and saturated soils. Work includes cleaning, flushing, and desilting existing subterranean storm pipes, culverts, and open drainage swales; replacing in-kind roughly 3,700 LF of culverts from Taxiway Charlie westward (west basin); rehabilitating culverts beneath Taxiway Mike and Runway 10-28 using cured-in-place pipe (CIPP) lining (center basin); capping the existing cross-runway culvert with concrete slurry and excavating roughly 2,100 LF of new culvert from Taxiway Bravo eastward through Taxiway Alpha (east basin); replacing double-pipe culverts beneath South Beach Road to support fish passage; mechanical bedrock excavation up to 26 feet deep (approx. 1,778 CY non-friable bedrock and 3,346 CY friable volcanic material) with on-island crushing; resurfacing utility trenches through Taxiways Alpha and Delta with high-strength concrete (303 SY); regrading approximately 84,844 SY of airfield infield with ditches/swales and revegetating via sprigging; and managing PFAS-contaminated soils and groundwater in accordance with UFC 3-201-01 and UFC 1-200-02.
9. EARECKSON AIR STATION (WAKE ISLAND SITE #1) — Project # YGFZ230004 Repair Airfield Lighting and Control Systems (SUS) Scope of Work Summary: Replace all runway lighting across approximately 9,850 LF with LED fixtures, including 100 elevated High Intensity Runway Lights (HIRL), 4 Runway End Identifier Lights (REIL), 104 threshold lights and cans, 16 distance remaining markers, 2 arresting gear markers, and 1 VORTAC sign with new foundations. Replace all conductors in existing conduit, interweave lighting circuits for resiliency, and provide new conduit and conductors to a relocated airfield lighting vault (AFLV). Replace the airfield windsock with an L-807 hinged structure with floodlights and obstruction lighting. Relocate the AFLV, electrical switching station, and backup generator outside the Airfield Clear Zone into a new 378 SF robust concrete building housing a 480V main panel, 400A ATS, 45kVA transformer, 10 constant current regulators, and airport lighting control panels, supported by an adjacent 300 kVA transformer and a 250 kW stand-by generator with 72-hour subbase fuel tank. Demolish existing facilities B1602 and B1603 with hazardous materials abatement (lead, PCBs, asbestos) and UXO construction support.
10. EARECKSON AIR STATION, SHEMYA ISLAND, AK — Project # VNMH180027 Repair Airfield Approach Lighting System Scope of Work Summary: Repair the airfield approach tower lighting network serving Runway 28/10 (currently 41 approach lighting towers, including a 28-tower modified ALSF-1 on the Runway 10 West Approach and a 13-tower modified SALSF on the Runway 28 East Approach), extend the Runway 28 approach lighting system approximately 1,500 LF east to a total of 3,000 feet to convert from SALSF to full ALSF-1, replace electrical systems on both runway ends, and replace approach lighting Constant Current Regulators (CCRs) in Building 775. Civil work includes installing erosion protection and soil stabilization in West (10) and East (28) approach drainage areas, installing wave and erosion protection for Towers 28-1 through 28-3, and constructing a breakwater extending approximately 1,500 LF into the ocean to support the East (28) Approach extension. Structural work includes removing and replacing existing towers and foundations at locations 28-1 through 28-3 and along the 1,500 LF East Approach extension with new freestanding tower structures, code-compliant access ladders with integrated climbing safety systems, work platform grating, frangible fiberglass light masts, an elevated maintenance/electrical catwalk between new towers, and replacement ladders, platform grating, and guy wires/hardware on remaining towers. Electrical work includes separating and installing new feeder conductors and switchgear, replacing near-grade conduit, conductors, junction boxes, enclosures (with anti-moisture heaters), transformers, and pads, replacing sequenced flashing lights and incandescent constant-on lights with self-monitoring LED systems, replacing CCRs with smaller kW units, and transitioning overhead cable runs between overwater towers to conduit runs attached to the new catwalks in compliance with UFC 1-200-02.
11. EARECKSON AIR STATION, WAKE ISLAND SITE #1 — Project # YGFZ190009 Repair Electrical Power Distribution Industrial Area, Multi Scope of Work Summary: Repair the medium-voltage (F81200) and low-voltage (F81201) electrical distribution system serving the industrial area and associated facilities on Wake Island. Work includes replacing 22 pad-mounted transformers with corrosion-resistant coated units, demolishing one abandoned transformer, replacing two medium-voltage fused switches, replacing 20 medium-voltage vaults/pull boxes, installing three new vaults to separate power from controls in five combined vaults, replacing segmented concrete vault lids, and providing 15 kV load-break elbows. Demolish or abandon in place approximately 17,300 LF of 3-inch conduit and install two parallel 6-inch conduits by trenching, backfilling, and compacting (minimum 32-inch depth in non-paved areas and 48-inch depth under paved areas); upgrade approximately 22,000 circuit feet of 5 kV conductors to 15 kV copper-tape-shielded single-conductor cable with separate insulated neutral (approximately 66,000 LF of new cable); and upsize four pad-mounted transformers (T1–T4) adjacent to the Power Plant (B1190) from 500 kVA to 750 kVA with new primary feeders and trip units. At the low-voltage level, replace service-entrance equipment and install advanced power meters at 30 buildings, install advanced power meters at eight additional buildings, upgrade service configurations (including exterior disconnects) at 13 buildings, clean lugs and apply corrosion inhibitor at 57 buildings, apply duct seal at approximately 104 buildings, and upgrade grounding systems in accordance with UFC 1-200-02.