Luckey Remediation Services

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912P420R0004
Agency
ENDIST Buffalo US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
562910 Remediation Services
PSC
F108 Environmental Systems Protection- Environmental Remediation
Place of performance
Luckey, Ohio, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This competitive small business set-aside solicitation from the USACE Buffalo District seeks proposals for environmental remediation and support services at the Luckey Formerly Utilized Sites Remedial Action Program site in Wood County, Ohio. The selected contractor shall excavate, transport, and dispose of contaminated soil, sediment, and materials; maintain the site; conduct project management, quality control, planning, monitoring, sampling, laboratory operation, and restoration activities; and support public meetings. Proposals will be evaluated based on safety record, past performance, technical approach, and cost/price factors. Offerors must attend a virtual pre-proposal conference by June 24, 2020 and submit all questions by July 10, 2020.

The solicitation includes a total small business set-aside designation. Required services involve excavating and handling beryllium, lead, and various radionuclides under NAICS codes 562910 and PSC code R699 and have an estimated value of $27 million annually over ten years. The incumbent contractor is North Wind Portage. Proposals are due by specified dates in 2020 with award anticipated in August 2021. All work shall be performed at the 40-acre Luckey FUSRAP Site in Wood County, Ohio, which was previously used for beryllium processing.

Notice text

10 versions

Update #10 · Latest ·

08/12/2020 Update #2:  The actual SF-30 is attached.  No more questions will be answered.  If assumptions need to be made, put them in the Basis of Estimate (BOE) as directed in Section L.  

08/12/2020 Update:  Amendment 05 is attached.  It officially extends the proposal due date, amends the PWS, amends the bid schedule, and updates a solicitation provision and clause.

08/07/2020 Update:  Amendment 05 should be posted nlt 11 Aug 2020.  It will grant one final proposal extension to 26 Aug 2020, attach the final PWS, and make some minor changes to the bid schedules/clauses.  The deadline for questions was 10 Jul 2020.  This has not been extended.  Please provide your proposal based on the solicitation and Amendments.  

7/31/2020 Update:  Amendment 04 is attached.  It updates Section B, Section L, provides an updated bid schedule, and answers questions. Also, please note, the Final Status Survey Plan (FSSP Rev. 3) has been updated and is located on the Luckey website.  The Government is updating the PWS based on Amendments 01-04 and expects the final PWS to be posted via Amendment 05 no later than 07 Aug 2020.  A proposal due date extension is not anticipated since the final PWS is incorporating previously communicated changes.    

7/23/2020 Update:  Amendment 03 is attached.  It extends the proposal due date, updates Section B, Section, L, Section M, and answers questions.  The Government is still finalizing answers to the remaining 90+ questions.  The next Amendment will answer all remaining questions.  Target date for the next Amendment is no later than 31 July 2020.    

7/20/2020 Update:  The Government is still in the process of answering the remaining questions.   Target date for the release of the next Amendment is 24 July 2020.  The proposal due date will be extended to 12 Aug 2020 via the next Amendment.  

7/8/2020 Update: Amendment 02 is attached.  It includes an Updated Section L, answers to questions, and a revised bid schedule.  The Government is in the process of answering the additonal 80+ questions we've received to date and will get them published as soon as possible.

6/26/2020 Update:  Amendment 01 is attached.  It includes an Updated Section L, the roster from the Pre-Proposal Conference, the Presentation, and the Q&A received through 6/25/2020.

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #9 ·

08/12/2020 Update:  Amendment 05 is attached.  It officially extends the proposal due date, amends the PWS, amends the bid schedule, and updates a solicitation provision and clause.

08/07/2020 Update:  Amendment 05 should be posted nlt 11 Aug 2020.  It will grant one final proposal extension to 26 Aug 2020, attach the final PWS, and make some minor changes to the bid schedules/clauses.  The deadline for questions was 10 Jul 2020.  This has not been extended.  Please provide your proposal based on the solicitation and Amendments.  

7/31/2020 Update:  Amendment 04 is attached.  It updates Section B, Section L, provides an updated bid schedule, and answers questions. Also, please note, the Final Status Survey Plan (FSSP Rev. 3) has been updated and is located on the Luckey website.  The Government is updating the PWS based on Amendments 01-04 and expects the final PWS to be posted via Amendment 05 no later than 07 Aug 2020.  A proposal due date extension is not anticipated since the final PWS is incorporating previously communicated changes.    

7/23/2020 Update:  Amendment 03 is attached.  It extends the proposal due date, updates Section B, Section, L, Section M, and answers questions.  The Government is still finalizing answers to the remaining 90+ questions.  The next Amendment will answer all remaining questions.  Target date for the next Amendment is no later than 31 July 2020.    

7/20/2020 Update:  The Government is still in the process of answering the remaining questions.   Target date for the release of the next Amendment is 24 July 2020.  The proposal due date will be extended to 12 Aug 2020 via the next Amendment.  

7/8/2020 Update: Amendment 02 is attached.  It includes an Updated Section L, answers to questions, and a revised bid schedule.  The Government is in the process of answering the additonal 80+ questions we've received to date and will get them published as soon as possible.

6/26/2020 Update:  Amendment 01 is attached.  It includes an Updated Section L, the roster from the Pre-Proposal Conference, the Presentation, and the Q&A received through 6/25/2020.

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #8 ·

08/07/2020 Update:  Amendment 05 should be posted nlt 11 Aug 2020.  It will grant one final proposal extension to 26 Aug 2020, attach the final PWS, and make some minor changes to the bid schedules/clauses.  The deadline for questions was 10 Jul 2020.  This has not been extended.  Please provide your proposal based on the solicitation and Amendments.  

7/31/2020 Update:  Amendment 04 is attached.  It updates Section B, Section L, provides an updated bid schedule, and answers questions. Also, please note, the Final Status Survey Plan (FSSP Rev. 3) has been updated and is located on the Luckey website.  The Government is updating the PWS based on Amendments 01-04 and expects the final PWS to be posted via Amendment 05 no later than 07 Aug 2020.  A proposal due date extension is not anticipated since the final PWS is incorporating previously communicated changes.    

7/23/2020 Update:  Amendment 03 is attached.  It extends the proposal due date, updates Section B, Section, L, Section M, and answers questions.  The Government is still finalizing answers to the remaining 90+ questions.  The next Amendment will answer all remaining questions.  Target date for the next Amendment is no later than 31 July 2020.    

7/20/2020 Update:  The Government is still in the process of answering the remaining questions.   Target date for the release of the next Amendment is 24 July 2020.  The proposal due date will be extended to 12 Aug 2020 via the next Amendment.  

7/8/2020 Update: Amendment 02 is attached.  It includes an Updated Section L, answers to questions, and a revised bid schedule.  The Government is in the process of answering the additonal 80+ questions we've received to date and will get them published as soon as possible.

6/26/2020 Update:  Amendment 01 is attached.  It includes an Updated Section L, the roster from the Pre-Proposal Conference, the Presentation, and the Q&A received through 6/25/2020.

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #7 ·

7/31/2020 Update:  Amendment 04 is attached.  It updates Section B, Section L, provides an updated bid schedule, and answers questions. Also, please note, the Final Status Survey Plan (FSSP Rev. 3) has been updated and is located on the Luckey website.  The Government is updating the PWS based on Amendments 01-04 and expects the final PWS to be posted via Amendment 05 no later than 07 Aug 2020.  A proposal due date extension is not anticipated since the final PWS is incorporating previously communicated changes.    

7/23/2020 Update:  Amendment 03 is attached.  It extends the proposal due date, updates Section B, Section, L, Section M, and answers questions.  The Government is still finalizing answers to the remaining 90+ questions.  The next Amendment will answer all remaining questions.  Target date for the next Amendment is no later than 31 July 2020.    

7/20/2020 Update:  The Government is still in the process of answering the remaining questions.   Target date for the release of the next Amendment is 24 July 2020.  The proposal due date will be extended to 12 Aug 2020 via the next Amendment.  

7/8/2020 Update: Amendment 02 is attached.  It includes an Updated Section L, answers to questions, and a revised bid schedule.  The Government is in the process of answering the additonal 80+ questions we've received to date and will get them published as soon as possible.

6/26/2020 Update:  Amendment 01 is attached.  It includes an Updated Section L, the roster from the Pre-Proposal Conference, the Presentation, and the Q&A received through 6/25/2020.

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #6 ·

7/23/2020 Update:  Amendment 03 is attached.  It extends the proposal due date, updates Section B, Section, L, Section M, and answers questions.  The Government is still finalizing answers to the remaining 90+ questions.  The next Amendment will answer all remaining questions.  Target date for the next Amendment is no later than 31 July 2020.    

7/20/2020 Update:  The Government is still in the process of answering the remaining questions.   Target date for the release of the next Amendment is 24 July 2020.  The proposal due date will be extended to 12 Aug 2020 via the next Amendment.  

7/8/2020 Update: Amendment 02 is attached.  It includes an Updated Section L, answers to questions, and a revised bid schedule.  The Government is in the process of answering the additonal 80+ questions we've received to date and will get them published as soon as possible.

6/26/2020 Update:  Amendment 01 is attached.  It includes an Updated Section L, the roster from the Pre-Proposal Conference, the Presentation, and the Q&A received through 6/25/2020.

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #5 ·

7/24/2020 Update:  The Government is still in the process of answering the remaining questions.   Target date for the release of the next Amendment is 24 July 2020.  The proposal due date will be extended to 12 Aug 2020 via the next Amendment.  

7/8/2020 Update: Amendment 02 is attached.  It includes an Updated Section L, answers to questions, and a revised bid schedule.  The Government is in the process of answering the additonal 80+ questions we've received to date and will get them published as soon as possible.

6/26/2020 Update:  Amendment 01 is attached.  It includes an Updated Section L, the roster from the Pre-Proposal Conference, the Presentation, and the Q&A received through 6/25/2020.

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #4 ·

7/8/2020 Update: Amendment 02 is attached.  It includes an Updated Section L, answers to questions, and a revised bid schedule.  The Government is in the process of answering the additonal 80+ questions we've received to date and will get them published as soon as possible.

6/26/2020 Update:  Amendment 01 is attached.  It includes an Updated Section L, the roster from the Pre-Proposal Conference, the Presentation, and the Q&A received through 6/25/2020.

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #3 ·

6/26/2020 Update:  Amendment 01 is attached.  It includes an Updated Section L, the roster from the Pre-Proposal Conference, the Presentation, and the Q&A received through 6/25/2020.

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #2 ·

6/18/2020 Update:  The solicitation states the cut-off date for questions to be considered for response is five calendar days after the Pre-Proposal conference.  The cut-off date is 10 Jul 2020.  The solicitation will be updated via Amendment 01 when issued.

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Update #1 ·

Attached is the solicitation.  A Pre-Proposal Conference will be held on 24 Jun at 1300 EDT.  It will be virtual.  Please contact jeffrey.g.ernest@usace.army.mil for the link and call-in information by 22 Jun.  All questions are due no later than 10 July 2020.   The Government plans to respond to all questions no later than 24 July 2020.  The Government does not intend to extend the proposal due date.

1. SITE DESCRIPTION
The Luckey site is located at the corner of Gilbert and Luckey Roads at 21200 Luckey Road, northwest of the Village of Luckey in Wood County, Ohio. The Village of Luckey is 22 miles southwest of Toledo, Ohio. The site encompasses
approximately 40 acres and contains a large production building and warehouse, two abandoned rail spurs, and several smaller process and support buildings. The surrounding area west, north, and east of the site is primarily residential farmland.


The site was used for beryllium processing in support of the national defense program from 1949 to 1961. Beryl ore (beryllium aluminum silicate); scrap beryllium; and radiologically contaminated scrap metal were brought to the
site during this period. Records also indicate that beryllium scrap from other operations was sent to the site that might have been radiologically contaminated.


In 1961 the General Services Administration sold the site to a privately owned company with the government retaining access rights in order to remove any remaining beryllium ore. The property changed ownership several times
since 1961 and the most recent transaction involved sale of the property from Hayes Lemmerz International, Inc. (HLI) to Industrial Properties Recovery, LLC (IPR). IPR refused to close on the sale and was sued by HLI, who was granted
a default judgment transferring the title (quit claim deed) to IPR, including all environmental liability. The site / facilities are not currently being used.


The Luckey site is included in the FUSRAP. Contaminants of concern include beryllium, lead, radium-226, thorium-230, uranium-234, and uranium-238 in soils, sediments, fill materials, other miscellaneous debris, and groundwater.

Remediation services are currently being performed on site by North Wind Portage.

2. PROJECT DESCRIPTION
The work and services shall consist of environmental remediation and support for the U.S. Army 
Corps of Engineers (USACE), Buffalo, New York District. The project focus consists of the 
excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a 
properly licensed facility. Additional activities may include, but not be limited to:

•  Overall site maintenance and security
•  Project management and construction quality assurance / quality control

•  Preparation of project work plans and engineering design for USACE approval
•  Perimeter air monitoring during the remedial action
•  Sampling and analysis of excavated soils/fill
•  Operation of an on-site laboratory
•  Storm water and wastewater management and control
•  Decommissioning and installation of monitoring wells
•  Remedial compliance sampling and analysis
•  Backfilling and restoration of remediated areas
•  Supporting USACE during meetings with the public, local officials, and regulators

Material characterization, handling and management will require strict control and accounting.  Procedures will need to be developed and implemented to ensure safety at the site and during transportation.
 

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment 05.docx DOCX document
Attachment 7_Bid Schedule_rev 3.pdf PDF
Attachment 7_Bid Schedule_rev 3.xlsx XLSX spreadsheet
PWS Section C_Revised Final_2020-08-07_optimized.pdf PDF
Off-Site Water Disposal ICN_2016-06_Redacted.pdf PDF
Misc Facility Drawings.pdf PDF
-7 NonHaz 2020 manifest example_Redacted.pdf PDF
-7 UN3077 2020 manifest example -Redacted.pdf PDF
Luckey site Beryllium Variance revision July 2020 MA Final.pdf PDF
Main Production Bldg Slab Details_Redacted.pdf PDF
Amendment 04.pdf PDF
June 2020 - June 2021 Permit Revision- USACE 2019 Luckey Ohio_Redacted.pdf PDF
7-50 UN3077 2020 manifest example - Redacted.pdf PDF
Round 4 Questions 31 Jul 2020.docx DOCX document
Luckey PID 04-16-20 As Record Complete 20200416.pdf PDF
7-50 UN2912 2019 manifest example - Redacted.pdf PDF
Luckey WWTS Results.xlsx XLSX spreadsheet
Misc Facility Drawings_2_Redacted.pdf PDF
S60789 B10040 OMM Rev. 1.0.pdf PDF
Photographic Record_Luckey Buildings.pdf PDF
Figure 4_(rev 1).pdf PDF
Sanitary Wastewater Treatment System_Redacted.pdf PDF
Attachment 7_Bid Schedule_rev 2.xlsx XLSX spreadsheet
Historic Facility Drawings.pdf PDF
Building and Debris Volume Estimates.pdf PDF
Attachment 7_Bid Schedule_rev 2.pdf PDF
Round 3 Questions_22 July.docx DOCX document
Amendment 03.docx DOCX document
Attachment 7_Bid Schedule_rev 1.xlsx XLSX spreadsheet
Round 2 Questions 08 Jul.docx DOCX document
Aerial Photo.pdf PDF
Attachment 7_Bid Schedule_rev 1.pdf PDF
Amendment 02.docx DOCX document
Round 1 Questions 26 Jun 2020.docx DOCX document
Luckey Pre-Proposal Conf(Rev1).pdf PDF
Amendment 01.pdf PDF
Luckey Pre-Proposal Conference Attendees.xlsx XLSX spreadsheet
Attachment 7_Bid Schedule.pdf PDF
W912P420R0004.pdf PDF
Attachment 7_Bid Schedule.xlsx XLSX spreadsheet
Attachment 9_Sample Letter of Commitment to Use Subcontractor.docx DOCX document
Attachment 10_Past Performance Questionnaire.pdf PDF
Wage Determination.pdf PDF
Attachment 1_Performance Work Statement.pdf PDF
Attachment 8_WBS Spreadsheet.xlsx XLSX spreadsheet
Show all 45

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Luckey Remediation Services Award Award Notice
Luckey Remediation Services This notice · Latest solicitation Solicitation
Luckey Remediation Services Pre-Solicitation
Luckey Remediation Services Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity