June 2020 - June 2021 Permit Revision- USACE 2019 Luckey Ohio_Redacted.pdf
PDF 219 KB Posted
- Attached to
- Luckey Remediation Services
- Solicitation number
- W912P420R0004
About this file
This solicitation is for remediation services at the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site in Luckey, Ohio. The scope of work includes excavating, transporting, and disposing of FUSRAP-contaminated soil, sediment, and materials. Additional activities may consist of overall site maintenance and security, project management and construction quality assurance/quality control, preparation of project work plans and engineering design, perimeter air monitoring, sampling and analysis of excavated soils/fill, operation of an on-site laboratory, storm water and wastewater management and control, decommissioning and installation of monitoring wells, remedial compliance sampling and analysis, backfilling and restoration of remediated areas, and supporting the U.S. Army Corps of Engineers during meetings. The pre-proposal conference will be held virtually on June 24, 2020, and all questions are due by July 10, 2020. The Army Corps of Engineers district office in Buffalo, New York is the issuing agency.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Toledo Department of Public Utilities
Edward A. Moore, Director
420 Madison Avenue, Suite 100 • Toledo, Ohio 43604 | Customer Service (419) 245-1800 | Fax (419) 245-1853 | Web: https://toledo.oh.gov/services/public-utilities/
June 5, 2020
Emailed c/o US Army Corps of Engineers 21200 Luckey Road Luckey, OH 43443
RE: Permit to Discharge
Dear Mr.
US Army Corps of Engineers is hereby granted permission to discharge to the City of Toledo’s WWTP thru Northwestern Water & Sewer District’s sanitary sewer system utilizing manhole #140-13-1041 on Latcha Rd adjacent to 3511 Latcha Rd, Millbury, OH 43447. This permit is valid from June 15, 2020 thru June 15, 2021. You will be required to maintain compliance with the following stipulations while discharging:
• US Army Corps of Engineers shall maintain compliance with the Toledo Municipal Code, Chapters 929, 930 and 1775 at all times. The provisions of these chapters shall apply to all discharges from the US Army Corps of Engineers site location in Luckey, Ohio.
• US Army Corps of Engineers shall maintain compliance with the attached parameters. Fines or penalties for such violations will be established per TMC Code 930.
• US Army Corps of Engineers shall immediately notify the Toledo Division of Environmental Services (TDOES) of any modifications to the discharge location and/or any entity associated with the discharge process.
• US Army Corps of Engineers shall immediately notify TDOES of any malfunctions and/or upsets of the process and/or discharge.
• US Army Corps of Engineers shall submit any potential process changes to TDOES for review prior to implementation of such changes.
• US Army Corps of Engineers shall cease all discharges during heavy rain events, which may cause bypass of the Wastewater Treatment Plant and/or Combined Sewer Overflows.
• US Army Corps of Engineers shall permit TDOES’ representatives access to the site for inspections.
Monitoring of the discharge will take place prior to, during, and once discharge is complete.
• US Army Corps of Engineers shall be permitted to batch discharge, but shall not deposit any solids into the City of Toledo sanitary sewer system.
• US Army Corps of Engineers shall maintain flow that does not exceed 100 gpm (unless otherwise agreed upon), and shall continuously monitor the discharge to ensure no issues or overflows.
• US Army Corps of Engineers shall notify TDOES and submit sampling analytical for any additional/future batches of wastewater collected onsite to TDOES for final approval prior to discharging any wastewater to the City of Toledo sanitary sewer.
• US Army Corps of Engineers is aware that the surcharge rates stated in the application are subject to change (increase) during the life of the permit.
Page 2-Discharge Permit
The Director of Public Utilities or his representative, the Toledo Division of Environmental Services (TDOES), shall be responsible for the administration and enforcement of this permit. The City of Toledo, Division of Environmental Services has the authority to revoke all permits to discharge and to cease operations if any of the above requirements and the Permit for Unusual Discharge is violated. This permit does not exempt US Army Corps of Engineers from any federal, state, or local environmental law or regulation. This permit expires on June 15, 2021, but may be renewed for additional time, if needed.
If you should have any questions, please do not hesitate to contact me at or
Respectfully, Cc:
Page 3-Discharge Permit
Acceptable Criteria for Discharge
Parameter Units Limit (Not to Exceed)
Cadmium, Total mg/L 0.3 Copper, Total mg/L 1.0 Lead, Total mg/L 1.5 Nickel, Total mg/L 2.9 Zinc, Total mg/L 6.3 Silver, Total mg/L 0.2 Mercury, Total mg/L 0.0002 (BMP’s)* Chromium, Hexavalent mg/L 0.8 Arsenic, Total mg/L 0.6 Cyanide, Total mg/L 1.1 Oil & Grease (TPH) mg/L 100 (avg.)/250(grab) Total Toxic Organics mg/L 5.0 Benzene** mg/L 0.14 Toluene** mg/L 1.36 Ethyl Benzene** mg/L 1.59 Xylene** mg/L 0.41
LEL % 10
PCB, Total mg/L 0.007 pH s.u. 5-12
*Best Management Practices: Parameter shall be managed by BMPs.
** For not to exceed threshold limit values refer to U.S. EPA’s “Guidance to Protect POTW Workers from Toxic and Reactive Gases and Vapors”.