Attachment 7_Bid Schedule_rev 3.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Luckey Remediation Services Federal contract opportunity
Solicitation number
W912P420R0004
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

This solicitation is for remediation services at the Luckey FUSRAP site in Ohio. The selected contractor will excavate, transport, and dispose of contaminated soil, sediment, and materials. Additional tasks include site maintenance, security, project management, sampling and analysis, well decommissioning, and restoration. Material handling will require strict controls. Procedures must ensure safety during on-site work and transportation. A pre-proposal conference will be held on June 24th. Questions are due by July 10th and answers will be provided by July 24th. The Army Corps of Engineers Buffalo District will award the contract.

View the file

Other files for this federal contract opportunity

Other files attached to Luckey Remediation Services, newest first.
File Type Posted
Amendment 05.docx DOCX document
Attachment 7_Bid Schedule_rev 3.pdf PDF
PWS Section C_Revised Final_2020-08-07_optimized.pdf PDF
Off-Site Water Disposal ICN_2016-06_Redacted.pdf PDF
Misc Facility Drawings.pdf PDF
Amendment 04.pdf PDF
June 2020 - June 2021 Permit Revision- USACE 2019 Luckey Ohio_Redacted.pdf PDF
7-50 UN3077 2020 manifest example - Redacted.pdf PDF
Round 4 Questions 31 Jul 2020.docx DOCX document
Luckey PID 04-16-20 As Record Complete 20200416.pdf PDF
7-50 UN2912 2019 manifest example - Redacted.pdf PDF
Luckey WWTS Results.xlsx XLSX spreadsheet
-7 NonHaz 2020 manifest example_Redacted.pdf PDF
-7 UN3077 2020 manifest example -Redacted.pdf PDF
Luckey site Beryllium Variance revision July 2020 MA Final.pdf PDF
Main Production Bldg Slab Details_Redacted.pdf PDF
Misc Facility Drawings_2_Redacted.pdf PDF
S60789 B10040 OMM Rev. 1.0.pdf PDF
Photographic Record_Luckey Buildings.pdf PDF
Figure 4_(rev 1).pdf PDF
Sanitary Wastewater Treatment System_Redacted.pdf PDF
Attachment 7_Bid Schedule_rev 2.xlsx XLSX spreadsheet
Historic Facility Drawings.pdf PDF
Building and Debris Volume Estimates.pdf PDF
Attachment 7_Bid Schedule_rev 2.pdf PDF
Round 3 Questions_22 July.docx DOCX document
Amendment 03.docx DOCX document
Attachment 7_Bid Schedule_rev 1.pdf PDF
Attachment 7_Bid Schedule_rev 1.xlsx XLSX spreadsheet
Round 2 Questions 08 Jul.docx DOCX document
Aerial Photo.pdf PDF
Amendment 02.docx DOCX document
Round 1 Questions 26 Jun 2020.docx DOCX document
Amendment 01.pdf PDF
Luckey Pre-Proposal Conf(Rev1).pdf PDF
Luckey Pre-Proposal Conference Attendees.xlsx XLSX spreadsheet
Attachment 7_Bid Schedule.pdf PDF
W912P420R0004.pdf PDF
Attachment 10_Past Performance Questionnaire.pdf PDF
Attachment 7_Bid Schedule.xlsx XLSX spreadsheet
Attachment 9_Sample Letter of Commitment to Use Subcontractor.docx DOCX document
Wage Determination.pdf PDF
Attachment 1_Performance Work Statement.pdf PDF
Attachment 8_WBS Spreadsheet.xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Bid Schedule - Summary

Task Description CLIN Payment Total Price

1Mobilization0001FFP$ - 0
4Demobilization0002FFP$ - 0
2aSoil Remediation (Trenches 1 and 2)0003CPFF$ - 0
3aTransportation and Disposal (Trenches 1 and 2)0004FFP$ - 0
Total (CLIN 0001 - 0004)$ - 0
2bSoil Remediation (Trench 3)0005(Option)CPFF$ - 0
3bTransportation and Disposal (Trench 3)0006(Option)FFP$ - 0
2cSoil Remediation (Trenches 4 and 5)0007(Option)CPFF$ - 0
3cTransportation and Disposal (Trenches 4 and 5)0008(Option)FFP$ - 0
2dSoil Remediation (Storage Area)0009(Option)CPFF$ - 0
3dTransportation and Disposal (Storage Area)0010(Option)FFP$ - 0
2eSoil Remediation (Under Production Building)0011(Option)CPFF$ - 0
3eTransportation and Disposal (Under Production Building)0012(Option)FFP$ - 0
2fSoil Remediation (Ditch)0013(Option)CPFF$ - 0
3fTransportation and Disposal (Ditch)0014(Option)FFP$ - 0
5aBuilding Deconstruction (Melting, Alloying, and Shipping Building)0015(Option)CPFF$ - 0
5bBuilding Deconstruction (Laboratory Building)0016(Option)CPFF$ - 0
5cBuilding Deconstruction (Maintenance Office Building)0017(Option)CPFF$ - 0
5dBuilding Deconstruction (Main Office Building)0018(Option)CPFF$ - 0
5eBuilding Deconstruction (Employee Activity Building)0019(Option)CPFF$ - 0
5fBuilding Deconstruction (Storage Building)0020(Option)CPFF$ - 0
5gBuilding Deconstruction (Small Structures)0021(Option)CPFF$ - 0

&8Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit Contract W912P420R0004

&8Sheet &P of &N

CPFF

Bid Schedule - Cost Plus Fixed Fee Tasks
WBS NumberDescriptionUnitQuantityUnit Direct CostDirect Cost

Task 2a: Soil Remediation (Trenches 1 and 2)

331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX08Solids Collection and Containment
0801Contaminated Soil CollectionJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0
331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0
331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 2a$ - 0
Total Indirect Cost, Task 2a(%)$ - 0
Total Cost, Task 2a$ - 0
Fee(%)$ - 0
Total Price, Task 2a$ - 0

Task 2b: Soil Remediation (Trench 3)

331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX08Solids Collection and Containment
0801Contaminated Soil CollectionJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0
331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0
331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 2b$ - 0
Total Indirect Cost, Task 2b(%)$ - 0
Total Cost, Task 2b$ - 0
Fee(%)$ - 0
Total Price, Task 2b$ - 0

Task 2c: Soil Remediation (Trenches 4 and 5)

331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX08Solids Collection and Containment
0801Contaminated Soil CollectionJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0
331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0
331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 2c$ - 0
Total Indirect Cost, Task 2c(%)$ - 0
Total Cost, Task 2c$ - 0
Fee(%)$ - 0
Total Price, Task 2c$ - 0

Task 2d: Soil Remediation (Storage Area)

331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX08Solids Collection and Containment
0801Contaminated Soil CollectionJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0
331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0
331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 2d$ - 0
Total Indirect Cost, Task 2d(%)$ - 0
Total Cost, Task 2d$ - 0
Fee(%)$ - 0
Total Price, Task 2d$ - 0

Task 2e: Soil Remediation (Under Production Building)

331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX08Solids Collection and Containment
0801Contaminated Soil CollectionJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0
331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0
331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 2e$ - 0
Total Indirect Cost, Task 2e(%)$ - 0
Total Cost, Task 2e$ - 0
Fee(%)$ - 0
Total Price, Task 2e$ - 0

Task 2f: Soil Remediation (Ditch)

331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX08Solids Collection and Containment
0801Contaminated Soil CollectionJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0
331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0
331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 2f$ - 0
Total Indirect Cost, Task 2f(%)$ - 0
Total Cost, Task 2f$ - 0
Fee(%)$ - 0
Total Price, Task 2f$ - 0

Task 5a: Building Deconstruction (Melting, Alloying, & Shipping Building)

331XX01Mobilization and Prepatory Work
0103Submittals/Implementation PlansJOB1$ - 0$ - 0
331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0

331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0

331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
1921Transportation to Storage/Disposal FacilityJOB1$ - 0$ - 0
1922Disposal Fees and TaxesJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0

331XX 21 Demobilization JOB 1 $ - 0 $ - 0

331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 5a$ - 0
Total Indirect Cost, Task 5a(%)$ - 0
Total Cost, Task 5a$ - 0
Fee(%)$ - 0
Total Price, Task 5a$ - 0

Task 5b: Building Deconstruction (Laboratory Building)

331XX01Mobilization and Prepatory Work
0103Submittals/Implementation PlansJOB1$ - 0$ - 0
331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0

331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0

331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
1921Transportation to Storage/Disposal FacilityJOB1$ - 0$ - 0
1922Disposal Fees and TaxesJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0

331XX 21 Demobilization JOB 1 $ - 0 $ - 0

331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 5b$ - 0
Total Indirect Cost, Task 5b(%)$ - 0
Total Cost, Task 5b$ - 0
Fee(%)$ - 0
Total Price, Task 5b$ - 0

Task 5c: Building Deconstruction (Maintenance Office Building)

331XX01Mobilization and Prepatory Work
0103Submittals/Implementation PlansJOB1$ - 0$ - 0
331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0

331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0

331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
1921Transportation to Storage/Disposal FacilityJOB1$ - 0$ - 0
1922Disposal Fees and TaxesJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0

331XX 21 Demobilization JOB 1 $ - 0 $ - 0

331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 5c$ - 0
Total Indirect Cost, Task 5c(%)$ - 0
Total Cost, Task 5c$ - 0
Fee(%)$ - 0
Total Price, Task 5c$ - 0

Task 5d: Building Deconstruction (Main Office Building)

331XX01Mobilization and Prepatory Work
0103Submittals/Implementation PlansJOB1$ - 0$ - 0
331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0

331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0

331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
1921Transportation to Storage/Disposal FacilityJOB1$ - 0$ - 0
1922Disposal Fees and TaxesJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0

331XX 21 Demobilization JOB 1 $ - 0 $ - 0

331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 5d$ - 0
Total Indirect Cost, Task 5d(%)$ - 0
Total Cost, Task 5d$ - 0
Fee(%)$ - 0
Total Price, Task 5d$ - 0

Task 5e: Building Deconstruction (Employee Activity Building)

331XX01Mobilization and Prepatory Work
0103Submittals/Implementation PlansJOB1$ - 0$ - 0
331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0

331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0

331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
1921Transportation to Storage/Disposal FacilityJOB1$ - 0$ - 0
1922Disposal Fees and TaxesJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0

331XX 21 Demobilization JOB 1 $ - 0 $ - 0

331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 5e$ - 0
Total Indirect Cost, Task 5e(%)$ - 0
Total Cost, Task 5e$ - 0
Fee(%)$ - 0
Total Price, Task 5e$ - 0

Task 5f: Building Deconstruction (Storage Building)

331XX01Mobilization and Prepatory Work
0103Submittals/Implementation PlansJOB1$ - 0$ - 0
331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0

331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0

331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
1921Transportation to Storage/Disposal FacilityJOB1$ - 0$ - 0
1922Disposal Fees and TaxesJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0

331XX 21 Demobilization JOB 1 $ - 0 $ - 0

331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 5f$ - 0
Total Indirect Cost, Task 5f(%)$ - 0
Total Cost, Task 5f$ - 0
Fee(%)$ - 0
Total Price, Task 5f$ - 0

Task 5g: Building Deconstruction (Small Structures)

331XX01Mobilization and Prepatory Work
0103Submittals/Implementation PlansJOB1$ - 0$ - 0
331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX03Site Work
0302Clearing and GrubbingJOB1$ - 0$ - 0
0304Roads/Parking/Curbs/WalksJOB1$ - 0$ - 0
0305FencingJOB1$ - 0$ - 0
331XX05Surface Water Collection and Control
0507Sediment BarriersJOB1$ - 0$ - 0
331XX09Liquids/Sediments/Sludges Collection and Containment
0907Lagoons/Basins/Tanks/Dikes/Pump SystemJOB1$ - 0$ - 0

331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0

331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
1921Transportation to Storage/Disposal FacilityJOB1$ - 0$ - 0
1922Disposal Fees and TaxesJOB1$ - 0$ - 0
331XX20Site Restoration
2001EarthworkJOB1$ - 0$ - 0
2004Revegetation and PlantingJOB1$ - 0$ - 0

331XX 21 Demobilization JOB 1 $ - 0 $ - 0

331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Direct Cost, Task 5g$ - 0
Total Indirect Cost, Task 5g(%)$ - 0
Total Cost, Task 5g$ - 0
Fee(%)$ - 0
Total Price, Task 5g$ - 0
Total Indirect Cost (Tasks 2a - 2f and 5a - 5g)(%)$ - 0
Total Cost (Tasks 2a - 2f and 5a - 5g)$ - 0
Fee (Tasks 2a - 2f and 5a - 5g))(%)$ - 0
Total Price (Tasks 2a - 2f and 5a - 5g)$ - 0

&8Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit

FFP

Bid Schedule - Firm Fixed Price Tasks
WBS NumberDescriptionUnitQuantityUnit CostTotal Cost

Task 1: Mobilization

331XX01Mobilization and Prepatory Work
0101Mobilization of Construction Equipment and FacilitiesJOB1$ - 0$ - 0
0102Mobilization of PersonnelJOB1$ - 0$ - 0
0103Submittals/Implementation PlansJOB1$ - 0$ - 0
0104Setup/Construct Temporary FacilitiesJOB1$ - 0$ - 0
0105Construct Temporary UtilitiesJOB1$ - 0$ - 0
331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Task 1$ - 0

Task 3a: Transportation and Disposal (Trenches 1 and 2)

331XX19Disposal
1921Transportation to Storage/Disposal FacilityTON78,274$ - 0$ - 0
1922Disposal Fees and TaxesTON78,274$ - 0$ - 0
Total Task 3a$ - 0

Task 3b Transportation and Disposal (Trench 3)

331XX19Disposal
1921Transportation to Storage/Disposal FacilityTON32,159$ - 0$ - 0
1922Disposal Fees and TaxesTON32,159$ - 0$ - 0
Total Task 3b$ - 0

Task 3c: Transportation and Disposal (Trenches 4 and 5)

331XX19Disposal
1921Transportation to Storage/Disposal FacilityTON37,181$ - 0$ - 0
1922Disposal Fees and TaxesTON37,181$ - 0$ - 0
Total Task 3c$ - 0

Task 3d: Transportation and Disposal (Storage Area)

331XX19Disposal
1921Transportation to Storage/Disposal FacilityTON3,521$ - 0$ - 0
1922Disposal Fees and TaxesTON3,521$ - 0$ - 0
Total Task 3d$ - 0

Task 3e: Transportation and Disposal (Under Production Building)

331XX19Disposal
1921Transportation to Storage/Disposal FacilityTON1,672$ - 0$ - 0
1922Disposal Fees and TaxesTON1,672$ - 0$ - 0
Total Task 3e$ - 0

Task 3f: Transportation and Disposal (Ditch)

331XX19Disposal
1921Transportation to Storage/Disposal FacilityTON1,970$ - 0$ - 0
1922Disposal Fees and TaxesTON1,970$ - 0$ - 0
Total Task 3f$ - 0

Task 4: Demobilization

331XX02Monitoring, Sampling, Testing, and Analysis
0201Meteorological MonitoringJOB1$ - 0$ - 0
0202Radiation MonitoringJOB1$ - 0$ - 0
0203Air Monitoring and SamplingJOB1$ - 0$ - 0
0204Monitoring WellsJOB1$ - 0$ - 0
0205Sampling Surface Water/Groundwater/Liquid WasteJOB1$ - 0$ - 0
0206Sampling Soil and SedimentJOB1$ - 0$ - 0
0208Sampling Radioactive Contaminated MediaJOB1$ - 0$ - 0
0209Laboratory Chemical AnalysisJOB1$ - 0$ - 0
0210Radioactive Waste AnalysisJOB1$ - 0$ - 0
0211Geotechnical TestingJOB1$ - 0$ - 0
0213On-site Laboratory FacilitiesJOB1$ - 0$ - 0
0214Off-site Laboratory FacilitiesJOB1$ - 0$ - 0
0290Beryllium Monitoring, Sampling, Testing, and AnalysisJOB1$ - 0$ - 0
331XX19Disposal (Commercial)
1920Container HandlingJOB1$ - 0$ - 0
1921Transportation to Storage/Disposal FacilityJOB1$ - 0$ - 0
1922Disposal Fees and TaxesJOB1$ - 0$ - 0

331XX 20 Site Restoration JOB 1 $ - 0 $ - 0

331XX21Demobilization
2101Removal of Temporary FacilitiesJOB1$ - 0$ - 0
2102Removal of Temporary UtilitiesJOB1$ - 0$ - 0
2103Final DecontaminationJOB1$ - 0$ - 0
2104Demobilization of Construction Equipment and FacilitiesJOB1$ - 0$ - 0
2105Demobilization of PersonnelJOB1$ - 0$ - 0
2106SubmittalsJOB1$ - 0$ - 0
331XX22General Requirements
2201Supervision and ManagementJOB1$ - 0$ - 0
2204Engineering, Surveying, and Quality ControlJOB1$ - 0$ - 0
2206First Aid, Fire Protection, Traffic Control and SecurityJOB1$ - 0$ - 0
2207Health and SafetyJOB1$ - 0$ - 0
2208Temporary Construction Facilities (Ownership)JOB1$ - 0$ - 0
2209Temporary Construction Facilities (Operation)JOB1$ - 0$ - 0
2210Project UtilitiesJOB1$ - 0$ - 0
Total Task 4$ - 0

&8Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit

File details come from the government source that posted it. Updated .