Summary Bid Schedule - Summary
Task Description CLIN Payment Total Price
| 1 | Mobilization | 0001 | FFP | $ - 0 |
| 4 | Demobilization | 0002 | FFP | $ - 0 |
| 2a | Soil Remediation (Trenches 1 and 2) | 0003 | CPFF | $ - 0 |
| 3a | Transportation and Disposal (Trenches 1 and 2) | 0004 | FFP | $ - 0 |
| Total (CLIN 0001 - 0004) | | | $ - 0 |
| 2b | Soil Remediation (Trench 3) | 0005 | (Option) | CPFF | $ - 0 |
| 3b | Transportation and Disposal (Trench 3) | 0006 | (Option) | FFP | $ - 0 |
| 2c | Soil Remediation (Trenches 4 and 5) | 0007 | (Option) | CPFF | $ - 0 |
| 3c | Transportation and Disposal (Trenches 4 and 5) | 0008 | (Option) | FFP | $ - 0 |
| 2d | Soil Remediation (Storage Area) | 0009 | (Option) | CPFF | $ - 0 |
| 3d | Transportation and Disposal (Storage Area) | 0010 | (Option) | FFP | $ - 0 |
| 2e | Soil Remediation (Under Production Building) | 0011 | (Option) | CPFF | $ - 0 |
| 3e | Transportation and Disposal (Under Production Building) | 0012 | (Option) | FFP | $ - 0 |
| 2f | Soil Remediation (Ditch) | 0013 | (Option) | CPFF | $ - 0 |
| 3f | Transportation and Disposal (Ditch) | 0014 | (Option) | FFP | $ - 0 |
| 5a | Building Deconstruction (Melting, Alloying, and Shipping Building) | 0015 | (Option) | CPFF | $ - 0 |
| 5b | Building Deconstruction (Laboratory Building) | 0016 | (Option) | CPFF | $ - 0 |
| 5c | Building Deconstruction (Maintenance Office Building) | 0017 | (Option) | CPFF | $ - 0 |
| 5d | Building Deconstruction (Main Office Building) | 0018 | (Option) | CPFF | $ - 0 |
| 5e | Building Deconstruction (Employee Activity Building) | 0019 | (Option) | CPFF | $ - 0 |
| 5f | Building Deconstruction (Storage Building) | 0020 | (Option) | CPFF | $ - 0 |
| 5g | Building Deconstruction (Small Structures) | 0021 | (Option) | CPFF | $ - 0 |
&8Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit Contract W912P420R0004
&8Sheet &P of &N
CPFF
| Bid Schedule - Cost Plus Fixed Fee Tasks | | | | | |
| WBS Number | Description | Unit | Quantity | Unit Direct Cost | Direct Cost |
Task 2a: Soil Remediation (Trenches 1 and 2)
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 08 | | Solids Collection and Containment | | | | |
| 08 | 01 | Contaminated Soil Collection | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 2a | | $ - 0 |
| Total Indirect Cost, Task 2a | (%) | $ - 0 |
| Total Cost, Task 2a | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 2a | | $ - 0 |
Task 2b: Soil Remediation (Trench 3)
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 08 | | Solids Collection and Containment | | | | |
| 08 | 01 | Contaminated Soil Collection | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 2b | | $ - 0 |
| Total Indirect Cost, Task 2b | (%) | $ - 0 |
| Total Cost, Task 2b | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 2b | | $ - 0 |
Task 2c: Soil Remediation (Trenches 4 and 5)
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 08 | | Solids Collection and Containment | | | | |
| 08 | 01 | Contaminated Soil Collection | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 2c | | $ - 0 |
| Total Indirect Cost, Task 2c | (%) | $ - 0 |
| Total Cost, Task 2c | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 2c | | $ - 0 |
Task 2d: Soil Remediation (Storage Area)
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 08 | | Solids Collection and Containment | | | | |
| 08 | 01 | Contaminated Soil Collection | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 2d | | $ - 0 |
| Total Indirect Cost, Task 2d | (%) | $ - 0 |
| Total Cost, Task 2d | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 2d | | $ - 0 |
Task 2e: Soil Remediation (Under Production Building)
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 08 | | Solids Collection and Containment | | | | |
| 08 | 01 | Contaminated Soil Collection | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 2e | | $ - 0 |
| Total Indirect Cost, Task 2e | (%) | $ - 0 |
| Total Cost, Task 2e | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 2e | | $ - 0 |
Task 2f: Soil Remediation (Ditch)
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 08 | | Solids Collection and Containment | | | | |
| 08 | 01 | Contaminated Soil Collection | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 2f | | $ - 0 |
| Total Indirect Cost, Task 2f | (%) | $ - 0 |
| Total Cost, Task 2f | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 2f | | $ - 0 |
Task 5a: Building Deconstruction (Melting, Alloying, & Shipping Building)
| 331XX | 01 | | Mobilization and Prepatory Work | | | | |
| 01 | 03 | Submittals/Implementation Plans | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 21 | Transportation to Storage/Disposal Facility | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
331XX 21 Demobilization JOB 1 $ - 0 $ - 0
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 5a | | $ - 0 |
| Total Indirect Cost, Task 5a | (%) | $ - 0 |
| Total Cost, Task 5a | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 5a | | $ - 0 |
Task 5b: Building Deconstruction (Laboratory Building)
| 331XX | 01 | | Mobilization and Prepatory Work | | | | |
| 01 | 03 | Submittals/Implementation Plans | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 21 | Transportation to Storage/Disposal Facility | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
331XX 21 Demobilization JOB 1 $ - 0 $ - 0
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 5b | | $ - 0 |
| Total Indirect Cost, Task 5b | (%) | $ - 0 |
| Total Cost, Task 5b | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 5b | | $ - 0 |
Task 5c: Building Deconstruction (Maintenance Office Building)
| 331XX | 01 | | Mobilization and Prepatory Work | | | | |
| 01 | 03 | Submittals/Implementation Plans | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 21 | Transportation to Storage/Disposal Facility | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
331XX 21 Demobilization JOB 1 $ - 0 $ - 0
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 5c | | $ - 0 |
| Total Indirect Cost, Task 5c | (%) | $ - 0 |
| Total Cost, Task 5c | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 5c | | $ - 0 |
Task 5d: Building Deconstruction (Main Office Building)
| 331XX | 01 | | Mobilization and Prepatory Work | | | | |
| 01 | 03 | Submittals/Implementation Plans | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 21 | Transportation to Storage/Disposal Facility | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
331XX 21 Demobilization JOB 1 $ - 0 $ - 0
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 5d | | $ - 0 |
| Total Indirect Cost, Task 5d | (%) | $ - 0 |
| Total Cost, Task 5d | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 5d | | $ - 0 |
Task 5e: Building Deconstruction (Employee Activity Building)
| 331XX | 01 | | Mobilization and Prepatory Work | | | | |
| 01 | 03 | Submittals/Implementation Plans | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 21 | Transportation to Storage/Disposal Facility | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
331XX 21 Demobilization JOB 1 $ - 0 $ - 0
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 5e | | $ - 0 |
| Total Indirect Cost, Task 5e | (%) | $ - 0 |
| Total Cost, Task 5e | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 5e | | $ - 0 |
Task 5f: Building Deconstruction (Storage Building)
| 331XX | 01 | | Mobilization and Prepatory Work | | | | |
| 01 | 03 | Submittals/Implementation Plans | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 21 | Transportation to Storage/Disposal Facility | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
331XX 21 Demobilization JOB 1 $ - 0 $ - 0
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 5f | | $ - 0 |
| Total Indirect Cost, Task 5f | (%) | $ - 0 |
| Total Cost, Task 5f | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 5f | | $ - 0 |
Task 5g: Building Deconstruction (Small Structures)
| 331XX | 01 | | Mobilization and Prepatory Work | | | | |
| 01 | 03 | Submittals/Implementation Plans | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 02 | | Monitoring, Sampling, Testing, and Analysis | | | | |
| 02 | 01 | Meteorological Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 02 | Radiation Monitoring | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 03 | Air Monitoring and Sampling | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 04 | Monitoring Wells | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 05 | Sampling Surface Water/Groundwater/Liquid Waste | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 06 | Sampling Soil and Sediment | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 08 | Sampling Radioactive Contaminated Media | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 09 | Laboratory Chemical Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 10 | Radioactive Waste Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 11 | Geotechnical Testing | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 13 | On-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 14 | Off-site Laboratory Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 02 | 90 | Beryllium Monitoring, Sampling, Testing, and Analysis | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 03 | | Site Work | | | | |
| 03 | 02 | Clearing and Grubbing | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 04 | Roads/Parking/Curbs/Walks | JOB | 1 | $ - 0 | $ - 0 |
| 03 | 05 | Fencing | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 05 | | Surface Water Collection and Control | | | | |
| 05 | 07 | Sediment Barriers | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 09 | | Liquids/Sediments/Sludges Collection and Containment | | | | |
| 09 | 07 | Lagoons/Basins/Tanks/Dikes/Pump System | JOB | 1 | $ - 0 | $ - 0 |
331XX 10 Miscellaneous Demolition and Removal JOB 1 $ - 0 $ - 0
| 331XX | 19 | | Disposal (Commercial) | | | | |
| 19 | 20 | Container Handling | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 21 | Transportation to Storage/Disposal Facility | JOB | 1 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | JOB | 1 | $ - 0 | $ - 0 |
| 331XX | 20 | | Site Restoration | | | | |
| 20 | 01 | Earthwork | JOB | 1 | $ - 0 | $ - 0 |
| 20 | 04 | Revegetation and Planting | JOB | 1 | $ - 0 | $ - 0 |
331XX 21 Demobilization JOB 1 $ - 0 $ - 0
| 331XX | 22 | | General Requirements | | | | |
| 22 | 01 | Supervision and Management | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 04 | Engineering, Surveying, and Quality Control | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 06 | First Aid, Fire Protection, Traffic Control and Security | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 07 | Health and Safety | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 08 | Temporary Construction Facilities (Ownership) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 09 | Temporary Construction Facilities (Operation) | JOB | 1 | $ - 0 | $ - 0 |
| 22 | 10 | Project Utilities | JOB | 1 | $ - 0 | $ - 0 |
| Total Direct Cost, Task 5g | | $ - 0 |
| Total Indirect Cost, Task 5g | (%) | $ - 0 |
| Total Cost, Task 5g | | $ - 0 |
| Fee | (%) | $ - 0 |
| Total Price, Task 5g | | $ - 0 |
| Total Indirect Cost (Tasks 2a - 2f and 5a - 5g) | (%) | $ - 0 |
| Total Cost (Tasks 2a - 2f and 5a - 5g) | | $ - 0 |
| Fee (Tasks 2a - 2f and 5a - 5g)) | (%) | $ - 0 |
| Total Price (Tasks 2a - 2f and 5a - 5g) | | $ - 0 |
&8Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit
FFP
| Bid Schedule - Firm Fixed Price Tasks | | | | | |
| WBS Number | Description | Unit | Quantity | Unit Cost | Total Cost |
Task 1: Mobilization
| 331XX | 01 | | Mobilization and Prepatory Work | | | | |
| 01 | 01 | Mobilization of Construction Equipment and Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 01 | 03 | Submittals/Implementation Plans | JOB | 1 | $ - 0 | $ - 0 |
| 01 | 04 | Setup/Construct Temporary Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 01 | 05 | Construct Temporary Facilities | JOB | 1 | $ - 0 | $ - 0 |
| | | Total Task 1 | | | | $ - 0 |
Task 3a: Transportation and Disposal (Trenches 1 and 2)
| 331XX | 19 | | Disposal | | | | |
| 19 | 21 | Transportation to Storage/Disposal Facility | TON | 78,274 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | TON | 78,274 | $ - 0 | $ - 0 |
| | | Total Task 3a | | | | $ - 0 |
Task 3b Transportation and Disposal (Trench 3)
| 331XX | 19 | | Disposal | | | | |
| 19 | 21 | Transportation to Storage/Disposal Facility | TON | 32,159 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | TON | 32,159 | $ - 0 | $ - 0 |
| | | Total Task 3b | | | | $ - 0 |
Task 3c: Transportation and Disposal (Trenches 4 and 5)
| 331XX | 19 | | Disposal | | | | |
| 19 | 21 | Transportation to Storage/Disposal Facility | TON | 37,181 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | TON | 37,181 | $ - 0 | $ - 0 |
| | | Total Task 3c | | | | $ - 0 |
Task 3d: Transportation and Disposal (Storage Area)
| 331XX | 19 | | Disposal | | | | |
| 19 | 21 | Transportation to Storage/Disposal Facility | TON | 3,521 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | TON | 3,521 | $ - 0 | $ - 0 |
| | | Total Task 3d | | | | $ - 0 |
Task 3e: Transportation and Disposal (Under Production Building)
| 331XX | 19 | | Disposal | | | | |
| 19 | 21 | Transportation to Storage/Disposal Facility | TON | 1,672 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | TON | 1,672 | $ - 0 | $ - 0 |
| | | Total Task 3e | | | | $ - 0 |
Task 3f: Transportation and Disposal (Ditch)
| 331XX | 19 | | Disposal | | | | |
| 19 | 21 | Transportation to Storage/Disposal Facility | TON | 1,970 | $ - 0 | $ - 0 |
| 19 | 22 | Disposal Fees and Taxes | TON | 1,970 | $ - 0 | $ - 0 |
| | | Total Task 3f | | | | $ - 0 |
Task 4: Demobilization
| 331XX | 21 | | Demobilization | | | | |
| 21 | 01 | Removal of Temporary Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 21 | 02 | Removal of Temporary Utilities | JOB | 1 | $ - 0 | $ - 0 |
| 21 | 03 | Final Decontamination | JOB | 1 | $ - 0 | $ - 0 |
| 21 | 04 | Demobilization of Construction Equipment and Facilities | JOB | 1 | $ - 0 | $ - 0 |
| 21 | 05 | Demobilization of Personnel | JOB | 1 | $ - 0 | $ - 0 |
| 21 | 06 | Submittals | JOB | 1 | $ - 0 | $ - 0 |
| | | Total Task 4 | | | | $ - 0 |
Total Cost (Tasks 1, 3a - 3f, 4) $ - 0
&8Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit