Attachment 7_Bid Schedule.pdf
PDF 112 KB Posted
- Attached to
- Luckey Remediation Services Federal contract opportunity
- Solicitation number
- W912P420R0004
About this file
This solicitation package includes a bid schedule and performance work statement outlining the requirements for remediation services at the Luckey FUSRAP Site in Ohio. The contractor will be responsible for excavating, transporting, and disposing of contaminated soils, sediments, and materials from six trenches, a storage area, and other locations on site. Additional tasks may include site maintenance, project management, engineering support, air monitoring, sampling and analysis, well decommissioning and installation, backfilling, and restoration activities. Material handling will require strict controls and procedures to ensure safety during remediation and transportation. The pre-proposal conference will be held virtually on June 24 and all questions are due by July 10, with responses by July 24. The proposal due date is not planned to be extended.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit
Contract W912P420R0004
Sheet 1 of 4
Percent Cost
Task 1 - Mobilization 331XX01 Mobilization and Prepatory Work JOB 1
Task 2a Soil Remediation (Trenches 1 and 2) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1
Subtotal Task 2a
Task 2b Soil Remediation (Trench 3) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1
Subtotal Task 2b
Task 2c Soil Remediation (Trenches 4 and 5) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1
Subtotal Task 2c
Task 2d Storage Area 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1
Subtotal Task 2d
Task 2e Under Production Building 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1
Primary Tasks
Fixed FeeUnit Quantity Unit Cost Direct Cost Total CostDescriptionActivity
Contract W912P420R0004
Sheet 2 of 4
Percent Cost Fixed FeeUnit Quantity Unit Cost Direct Cost Total CostDescriptionActivity
331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1
Subtotal Task 2e
Task 2f Ditch 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1
Subtotal Task 2f
Task 3a Transportation and Disposal (Trenches 1 and 2) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 78,274 --- --- 331XX1922 Disposal Fees and Taxes TON 78,274 --- ---
Subtotal Task 3a ---
Task 3b Transportation and Disposal (Trench 3) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 32,159 --- --- 331XX1922 Disposal Fees and Taxes TON 32,159 --- ---
Subtotal Task 3b
Task 3c Transportation and Disposal (Trenches 4 and 5) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 37,181 --- --- 331XX1922 Disposal Fees and Taxes TON 37,181 --- ---
Subtotal Task 3c ---
Task 3d Transportation and Disposal (Storage Area) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 3,521 --- --- 331XX1922 Disposal Fees and Taxes TON 3,521 --- ---
Subtotal Task 3d ---
Task 3e Transportation and Disposal (Under Production Building) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 1,672 --- --- 331XX1922 Disposal Fees and Taxes TON 1,672 --- ---
Subtotal Task 3e ---
Task 3f Transportation and Disposal (Ditch) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 1,970 --- --- 331XX1922 Disposal Fees and Taxes TON 1,970 --- ---
Subtotal Task 3f ---
Task 4 Demobilization 331XX21 Demobilization JOB 1
Contract W912P420R0004
Sheet 3 of 4
Percent Cost Fixed FeeUnit Quantity Unit Cost Direct Cost Total CostDescriptionActivity
Total Bid Amount (Primary Tasks)
Optional Task 5a - Building Deconstruction (Melting, Alloying, & Shipping Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1
331XX22 General Requirements JOB 1 Subtotal Optional Task 5a
Optional Task 5b - Building Deconstruction (Laboratory Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1
331XX22 General Requirements JOB 1 Subtotal Optional Task 5b
Optional Task 5c - Building Deconstruction (Maintenance Office Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1
331XX22 General Requirements JOB 1 Subtotal Optional Task 5c
Optional Task 5d - Building Deconstruction (Main Office Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1
331XX20 Site Restoration JOB 1 331XX1922 Disposal Fees and Taxes JOB 1
331XX22 General Requirements JOB 1 Subtotal Optional Task 5d
Optional Task 5e - Building Deconstruction (Employee Activity Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1
331XX22 General Requirements JOB 1 Subtotal Optional Task 5e
Optional Tasks
Contract W912P420R0004
Sheet 4 of 4
Percent Cost Fixed FeeUnit Quantity Unit Cost Direct Cost Total CostDescriptionActivity
Optional Task 5f - Building Deconstruction (Storage Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1
331XX22 General Requirements JOB 1 Subtotal Optional Task 5f
Optional Task 5g - Building Deconstruction (Small Structures) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1
331XX22 General Requirements JOB 1 Subtotal Optional Task 5g
Total Bid Amount (Optional Tasks)