Attachment 7_Bid Schedule.pdf

PDF 112 KB Posted

Attached to
Luckey Remediation Services Federal contract opportunity
Solicitation number
W912P420R0004
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

This solicitation package includes a bid schedule and performance work statement outlining the requirements for remediation services at the Luckey FUSRAP Site in Ohio. The contractor will be responsible for excavating, transporting, and disposing of contaminated soils, sediments, and materials from six trenches, a storage area, and other locations on site. Additional tasks may include site maintenance, project management, engineering support, air monitoring, sampling and analysis, well decommissioning and installation, backfilling, and restoration activities. Material handling will require strict controls and procedures to ensure safety during remediation and transportation. The pre-proposal conference will be held virtually on June 24 and all questions are due by July 10, with responses by July 24. The proposal due date is not planned to be extended.

View the file

Other files for this federal contract opportunity

Other files attached to Luckey Remediation Services, newest first.
File Type Posted
Amendment 05.docx DOCX document
Attachment 7_Bid Schedule_rev 3.pdf PDF
PWS Section C_Revised Final_2020-08-07_optimized.pdf PDF
Attachment 7_Bid Schedule_rev 3.xlsx XLSX spreadsheet
Off-Site Water Disposal ICN_2016-06_Redacted.pdf PDF
Misc Facility Drawings.pdf PDF
Misc Facility Drawings_2_Redacted.pdf PDF
S60789 B10040 OMM Rev. 1.0.pdf PDF
Photographic Record_Luckey Buildings.pdf PDF
Figure 4_(rev 1).pdf PDF
Sanitary Wastewater Treatment System_Redacted.pdf PDF
Attachment 7_Bid Schedule_rev 2.xlsx XLSX spreadsheet
Historic Facility Drawings.pdf PDF
Building and Debris Volume Estimates.pdf PDF
Attachment 7_Bid Schedule_rev 2.pdf PDF
-7 NonHaz 2020 manifest example_Redacted.pdf PDF
-7 UN3077 2020 manifest example -Redacted.pdf PDF
Luckey site Beryllium Variance revision July 2020 MA Final.pdf PDF
Main Production Bldg Slab Details_Redacted.pdf PDF
Amendment 04.pdf PDF
June 2020 - June 2021 Permit Revision- USACE 2019 Luckey Ohio_Redacted.pdf PDF
7-50 UN3077 2020 manifest example - Redacted.pdf PDF
Round 4 Questions 31 Jul 2020.docx DOCX document
Luckey PID 04-16-20 As Record Complete 20200416.pdf PDF
7-50 UN2912 2019 manifest example - Redacted.pdf PDF
Luckey WWTS Results.xlsx XLSX spreadsheet
Round 3 Questions_22 July.docx DOCX document
Amendment 03.docx DOCX document
Amendment 02.docx DOCX document
Attachment 7_Bid Schedule_rev 1.xlsx XLSX spreadsheet
Round 2 Questions 08 Jul.docx DOCX document
Aerial Photo.pdf PDF
Attachment 7_Bid Schedule_rev 1.pdf PDF
Round 1 Questions 26 Jun 2020.docx DOCX document
Luckey Pre-Proposal Conference Attendees.xlsx XLSX spreadsheet
Luckey Pre-Proposal Conf(Rev1).pdf PDF
Amendment 01.pdf PDF
W912P420R0004.pdf PDF
Wage Determination.pdf PDF
Attachment 1_Performance Work Statement.pdf PDF
Attachment 8_WBS Spreadsheet.xlsx XLSX spreadsheet
Attachment 7_Bid Schedule.xlsx XLSX spreadsheet
Attachment 9_Sample Letter of Commitment to Use Subcontractor.docx DOCX document
Attachment 10_Past Performance Questionnaire.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit

Contract W912P420R0004

Sheet 1 of 4

Percent Cost

Task 1 - Mobilization 331XX01 Mobilization and Prepatory Work JOB 1

Task 2a Soil Remediation (Trenches 1 and 2) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1

Subtotal Task 2a

Task 2b Soil Remediation (Trench 3) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1

Subtotal Task 2b

Task 2c Soil Remediation (Trenches 4 and 5) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1

Subtotal Task 2c

Task 2d Storage Area 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1

Subtotal Task 2d

Task 2e Under Production Building 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1

Primary Tasks

Fixed FeeUnit Quantity Unit Cost Direct Cost Total CostDescriptionActivity

Contract W912P420R0004

Sheet 2 of 4

Percent Cost Fixed FeeUnit Quantity Unit Cost Direct Cost Total CostDescriptionActivity

331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1

Subtotal Task 2e

Task 2f Ditch 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 331XX03 Site Work JOB 1 331XX05 Surface Water Collection and Control JOB 1 331XX08 Solids Collection and Containment JOB 1 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 331XX1920 Container Handling JOB 1 331XX20 Site Restoration JOB 1 331XX22 General Requirements JOB 1

Subtotal Task 2f

Task 3a Transportation and Disposal (Trenches 1 and 2) 331XX19 Disposal

331XX1921 Transportation to Storage/Disposal Facility TON 78,274 --- --- 331XX1922 Disposal Fees and Taxes TON 78,274 --- ---

Subtotal Task 3a ---

Task 3b Transportation and Disposal (Trench 3) 331XX19 Disposal

331XX1921 Transportation to Storage/Disposal Facility TON 32,159 --- --- 331XX1922 Disposal Fees and Taxes TON 32,159 --- ---

Subtotal Task 3b

Task 3c Transportation and Disposal (Trenches 4 and 5) 331XX19 Disposal

331XX1921 Transportation to Storage/Disposal Facility TON 37,181 --- --- 331XX1922 Disposal Fees and Taxes TON 37,181 --- ---

Subtotal Task 3c ---

Task 3d Transportation and Disposal (Storage Area) 331XX19 Disposal

331XX1921 Transportation to Storage/Disposal Facility TON 3,521 --- --- 331XX1922 Disposal Fees and Taxes TON 3,521 --- ---

Subtotal Task 3d ---

Task 3e Transportation and Disposal (Under Production Building) 331XX19 Disposal

331XX1921 Transportation to Storage/Disposal Facility TON 1,672 --- --- 331XX1922 Disposal Fees and Taxes TON 1,672 --- ---

Subtotal Task 3e ---

Task 3f Transportation and Disposal (Ditch) 331XX19 Disposal

331XX1921 Transportation to Storage/Disposal Facility TON 1,970 --- --- 331XX1922 Disposal Fees and Taxes TON 1,970 --- ---

Subtotal Task 3f ---

Task 4 Demobilization 331XX21 Demobilization JOB 1

Contract W912P420R0004

Sheet 3 of 4

Percent Cost Fixed FeeUnit Quantity Unit Cost Direct Cost Total CostDescriptionActivity

Total Bid Amount (Primary Tasks)

Optional Task 5a - Building Deconstruction (Melting, Alloying, & Shipping Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)

331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1

331XX22 General Requirements JOB 1 Subtotal Optional Task 5a

Optional Task 5b - Building Deconstruction (Laboratory Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)

331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1

331XX22 General Requirements JOB 1 Subtotal Optional Task 5b

Optional Task 5c - Building Deconstruction (Maintenance Office Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)

331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1

331XX22 General Requirements JOB 1 Subtotal Optional Task 5c

Optional Task 5d - Building Deconstruction (Main Office Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)

331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1

331XX20 Site Restoration JOB 1 331XX1922 Disposal Fees and Taxes JOB 1

331XX22 General Requirements JOB 1 Subtotal Optional Task 5d

Optional Task 5e - Building Deconstruction (Employee Activity Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)

331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1

331XX22 General Requirements JOB 1 Subtotal Optional Task 5e

Optional Tasks

Contract W912P420R0004

Sheet 4 of 4

Percent Cost Fixed FeeUnit Quantity Unit Cost Direct Cost Total CostDescriptionActivity

Optional Task 5f - Building Deconstruction (Storage Building) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)

331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1

331XX22 General Requirements JOB 1 Subtotal Optional Task 5f

Optional Task 5g - Building Deconstruction (Small Structures) 331XX01 Mobilization and Prepatory Work JOB 1 331XX10 Miscellaneous Demolition and Removal JOB 1 331XX19 Disposal (Commercial)

331XX1920 Container Handling JOB 1 331XX1921 Transportation to Storage/Disposal Facility JOB 1 331XX1922 Disposal Fees and Taxes JOB 1

331XX22 General Requirements JOB 1 Subtotal Optional Task 5g

Total Bid Amount (Optional Tasks)

File details come from the government source that posted it. Updated .