Attachment 7_Bid Schedule_rev 2.pdf

PDF 286 KB Posted

Attached to
Luckey Remediation Services Federal contract opportunity
Solicitation number
W912P420R0004
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

This document is an invitation for bids for remediation services at the Luckey site in Wood County, Ohio. The U.S. Army Corps of Engineers is seeking a contractor to excavate, transport, and dispose of FUSRAP-contaminated soil, sediment, and materials at a licensed facility. Additional required activities include overall site maintenance and security, project management and construction quality assurance/quality control, preparation of work plans and engineering designs for approval, perimeter air monitoring during remediation, sampling and analysis of excavated materials, operation of an on-site laboratory, storm water and wastewater management and control, decommissioning and installation of monitoring wells, remedial compliance sampling and analysis, backfilling and restoration of remediated areas, and supporting the Corps during public meetings. Material characterization, handling, and management will require strict control and accounting. Procedures must be developed and implemented to ensure safety at the site and during transportation. A pre-proposal conference will be held on June 24, 2020, with questions due by July 10 and responses by July 24.

View the file

Other files for this federal contract opportunity

Other files attached to Luckey Remediation Services, newest first.
File Type Posted
Amendment 05.docx DOCX document
Attachment 7_Bid Schedule_rev 3.pdf PDF
PWS Section C_Revised Final_2020-08-07_optimized.pdf PDF
Attachment 7_Bid Schedule_rev 3.xlsx XLSX spreadsheet
Off-Site Water Disposal ICN_2016-06_Redacted.pdf PDF
Misc Facility Drawings.pdf PDF
Misc Facility Drawings_2_Redacted.pdf PDF
S60789 B10040 OMM Rev. 1.0.pdf PDF
Photographic Record_Luckey Buildings.pdf PDF
Figure 4_(rev 1).pdf PDF
Sanitary Wastewater Treatment System_Redacted.pdf PDF
Attachment 7_Bid Schedule_rev 2.xlsx XLSX spreadsheet
Historic Facility Drawings.pdf PDF
Building and Debris Volume Estimates.pdf PDF
-7 NonHaz 2020 manifest example_Redacted.pdf PDF
-7 UN3077 2020 manifest example -Redacted.pdf PDF
Luckey site Beryllium Variance revision July 2020 MA Final.pdf PDF
Main Production Bldg Slab Details_Redacted.pdf PDF
Amendment 04.pdf PDF
June 2020 - June 2021 Permit Revision- USACE 2019 Luckey Ohio_Redacted.pdf PDF
7-50 UN3077 2020 manifest example - Redacted.pdf PDF
Round 4 Questions 31 Jul 2020.docx DOCX document
Luckey PID 04-16-20 As Record Complete 20200416.pdf PDF
7-50 UN2912 2019 manifest example - Redacted.pdf PDF
Luckey WWTS Results.xlsx XLSX spreadsheet
Round 3 Questions_22 July.docx DOCX document
Amendment 03.docx DOCX document
Amendment 02.docx DOCX document
Attachment 7_Bid Schedule_rev 1.xlsx XLSX spreadsheet
Round 2 Questions 08 Jul.docx DOCX document
Aerial Photo.pdf PDF
Attachment 7_Bid Schedule_rev 1.pdf PDF
Round 1 Questions 26 Jun 2020.docx DOCX document
Luckey Pre-Proposal Conference Attendees.xlsx XLSX spreadsheet
Luckey Pre-Proposal Conf(Rev1).pdf PDF
Amendment 01.pdf PDF
Attachment 7_Bid Schedule.pdf PDF
W912P420R0004.pdf PDF
Wage Determination.pdf PDF
Attachment 1_Performance Work Statement.pdf PDF
Attachment 8_WBS Spreadsheet.xlsx XLSX spreadsheet
Attachment 7_Bid Schedule.xlsx XLSX spreadsheet
Attachment 9_Sample Letter of Commitment to Use Subcontractor.docx DOCX document
Attachment 10_Past Performance Questionnaire.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit

Contract W912P420R0004

Sheet 1 of 17

Task Description Payment Total Price

1 Mobilization 0001 FFP -$ 4 Demobilization 0002 FFP -$

2a Soil Remediation (Trenches 1 and 2) 0003 CPFF -$ 3a Transportation and Disposal (Trenches 1 and 2) 0004 FFP -$

Total (CLIN 0001 - 0004) -$

2b Soil Remediation (Trench 3) 0005 (Option) CPFF -$ 3b Transportation and Disposal (Trench 3) 0006 (Option) FFP -$ 2c Soil Remediation (Trenches 4 and 5) 0007 (Option) CPFF -$ 3c Transportation and Disposal (Trenches 4 and 5) 0008 (Option) FFP -$ 2d Soil Remediation (Storage Area) 0009 (Option) CPFF -$ 3d Transportation and Disposal (Storage Area) 0010 (Option) FFP -$ 2e Soil Remediation (Under Production Building) 0011 (Option) CPFF -$ 3e Transportation and Disposal (Under Production Building) 0012 (Option) FFP -$ 2f Soil Remediation (Ditch) 0013 (Option) CPFF -$ 3f Transportation and Disposal (Ditch) 0014 (Option) FFP -$ 5a Building Deconstruction (Melting, Alloying, and Shipping Building) 0015 (Option) CPFF -$ 5b Building Deconstruction (Laboratory Building) 0016 (Option) CPFF -$ 5c Building Deconstruction (Maintenance Office Building) 0017 (Option) CPFF -$ 5d Building Deconstruction (Main Office Building) 0018 (Option) CPFF -$ 5e Building Deconstruction (Employee Activity Building) 0019 (Option) CPFF -$ 5f Building Deconstruction (Storage Building) 0020 (Option) CPFF -$ 5g Building Deconstruction (Small Structures) 0021 (Option) CPFF -$

Bid Schedule - Summary

CLIN

Contract W912P420R0004

Sheet 2 of 17

Description Unit Quantity Unit Direct

Cost Direct Cost

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 08 Solids Collection and Containment 08 01 Contaminated Soil Collection JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 2a -$ Total Indirect Cost, Task 2a (%) -$

Total Cost, Task 2a -$ Fee (%) -$

Total Price, Task 2a -$

WBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

Task 2a: Soil Remediation (Trenches 1 and 2)

Contract W912P420R0004

Sheet 3 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 08 Solids Collection and Containment 08 01 Contaminated Soil Collection JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 2b -$ Total Indirect Cost, Task 2b (%) -$

Total Cost, Task 2b -$ Fee (%) -$

Total Price, Task 2b -$

Task 2b: Soil Remediation (Trench 3)

Contract W912P420R0004

Sheet 4 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 08 Solids Collection and Containment 08 01 Contaminated Soil Collection JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 2c -$ Total Indirect Cost, Task 2c (%) -$

Total Cost, Task 2c -$ Fee (%) -$

Total Price, Task 2c -$

Task 2c: Soil Remediation (Trenches 4 and 5)

Contract W912P420R0004

Sheet 5 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 08 Solids Collection and Containment 08 01 Contaminated Soil Collection JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 2d -$ Total Indirect Cost, Task 2d (%) -$

Total Cost, Task 2d -$ Fee (%) -$

Total Price, Task 2d -$

Task 2d: Soil Remediation (Storage Area)

Contract W912P420R0004

Sheet 6 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 08 Solids Collection and Containment 08 01 Contaminated Soil Collection JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 2e -$ Total Indirect Cost, Task 2e (%) -$

Total Cost, Task 2e -$ Fee (%) -$

Total Price, Task 2e -$

Task 2e: Soil Remediation (Under Production Building)

Contract W912P420R0004

Sheet 7 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 08 Solids Collection and Containment 08 01 Contaminated Soil Collection JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 2f -$ Total Indirect Cost, Task 2f (%) -$

Total Cost, Task 2f -$ Fee (%) -$

Total Price, Task 2f -$

Task 2f: Soil Remediation (Ditch)

Contract W912P420R0004

Sheet 8 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 01 Mobilization and Prepatory Work 01 03 Submittals/Implementation Plans JOB 1 -$ -$

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 10 Miscellaneous Demolition and Removal JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$ 19 21 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 19 22 Disposal Fees and Taxes JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 21 Demobilization JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 5a -$ Total Indirect Cost, Task 5a (%) -$

Total Cost, Task 5a -$ Fee (%) -$

Total Price, Task 5a -$

Task 5a: Building Deconstruction (Melting, Alloying, & Shipping Building)

Contract W912P420R0004

Sheet 9 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 01 Mobilization and Prepatory Work 01 03 Submittals/Implementation Plans JOB 1 -$ -$

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 10 Miscellaneous Demolition and Removal JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$ 19 21 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 19 22 Disposal Fees and Taxes JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 21 Demobilization JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 5b -$ Total Indirect Cost, Task 5b (%) -$

Total Cost, Task 5b -$ Fee (%) -$

Total Price, Task 5b -$

Task 5b: Building Deconstruction (Laboratory Building)

Contract W912P420R0004

Sheet 10 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 01 Mobilization and Prepatory Work 01 03 Submittals/Implementation Plans JOB 1 -$ -$

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 10 Miscellaneous Demolition and Removal JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$ 19 21 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 19 22 Disposal Fees and Taxes JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 21 Demobilization JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 5c -$ Total Indirect Cost, Task 5c (%) -$

Total Cost, Task 5c -$ Fee (%) -$

Total Price, Task 5c -$

Task 5c: Building Deconstruction (Maintenance Office Building)

Contract W912P420R0004

Sheet 11 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 01 Mobilization and Prepatory Work 01 03 Submittals/Implementation Plans JOB 1 -$ -$

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 10 Miscellaneous Demolition and Removal JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$ 19 21 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 19 22 Disposal Fees and Taxes JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 21 Demobilization JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 5d -$ Total Indirect Cost, Task 5d (%) -$

Total Cost, Task 5d -$ Fee (%) -$

Total Price, Task 5d -$

Task 5d: Building Deconstruction (Main Office Building)

Contract W912P420R0004

Sheet 12 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 01 Mobilization and Prepatory Work 01 03 Submittals/Implementation Plans JOB 1 -$ -$

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 10 Miscellaneous Demolition and Removal JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$ 19 21 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 19 22 Disposal Fees and Taxes JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 21 Demobilization JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 5e -$ Total Indirect Cost, Task 5e (%) -$

Total Cost, Task 5e -$ Fee (%) -$

Total Price, Task 5e -$

Task 5e: Building Deconstruction (Employee Activity Building)

Contract W912P420R0004

Sheet 13 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 01 Mobilization and Prepatory Work 01 03 Submittals/Implementation Plans JOB 1 -$ -$

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 10 Miscellaneous Demolition and Removal JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$ 19 21 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 19 22 Disposal Fees and Taxes JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 21 Demobilization JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 5f -$ Total Indirect Cost, Task 5f (%) -$

Total Cost, Task 5f -$ Fee (%) -$

Total Price, Task 5f -$

Task 5f: Building Deconstruction (Storage Building)

Contract W912P420R0004

Sheet 14 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

331XX 01 Mobilization and Prepatory Work 01 03 Submittals/Implementation Plans JOB 1 -$ -$

331XX 02 Monitoring, Sampling, Testing, and Analysis 02 01 Meteorological Monitoring JOB 1 -$ -$ 02 02 Radiation Monitoring JOB 1 -$ -$ 02 03 Air Monitoring and Sampling JOB 1 -$ -$ 02 04 Monitoring Wells JOB 1 -$ -$ 02 05 Sampling Surface Water/Groundwater/Liquid Waste JOB 1 -$ -$ 02 06 Sampling Soil and Sediment JOB 1 -$ -$ 02 08 Sampling Radioactive Contaminated Media JOB 1 -$ -$ 02 09 Laboratory Chemical Analysis JOB 1 -$ -$ 02 10 Radioactive Waste Analysis JOB 1 -$ -$ 02 11 Geotechnical Testing JOB 1 -$ -$ 02 13 On-site Laboratory Facilities JOB 1 -$ -$ 02 14 Off-site Laboratory Facilities JOB 1 -$ -$ 02 90 Beryllium Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$

331XX 03 Site Work 03 02 Clearing and Grubbing JOB 1 -$ -$ 03 04 Roads/Parking/Curbs/Walks JOB 1 -$ -$ 03 05 Fencing JOB 1 -$ -$

331XX 05 Surface Water Collection and Control 05 07 Sediment Barriers JOB 1 -$ -$

331XX 09 Liquids/Sediments/Sludges Collection and Containment 09 07 Lagoons/Basins/Tanks/Dikes/Pump System JOB 1 -$ -$

331XX 10 Miscellaneous Demolition and Removal JOB 1 -$ -$

331XX 19 Disposal (Commercial) 19 20 Container Handling JOB 1 -$ -$ 19 21 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 19 22 Disposal Fees and Taxes JOB 1 -$ -$

331XX 20 Site Restoration 20 01 Earthwork JOB 1 -$ -$ 20 04 Revegetation and Planting JOB 1 -$ -$

331XX 21 Demobilization JOB 1 -$ -$

331XX 22 General Requirements 22 01 Supervision and Management JOB 1 -$ -$ 22 04 Engineering, Surveying, and Quality Control JOB 1 -$ -$ 22 06 First Aid, Fire Protection, Traffic Control and Security JOB 1 -$ -$ 22 07 Health and Safety JOB 1 -$ -$ 22 08 Temporary Construction Facilities (Ownership) JOB 1 -$ -$ 22 09 Temporary Construction Facilities (Operation) JOB 1 -$ -$ 22 10 Project Utilities JOB 1 -$ -$

Total Direct Cost, Task 5g -$ Total Indirect Cost, Task 5g (%) -$

Total Cost, Task 5g -$ Fee (%) -$

Total Price, Task 5g -$

Task 5g: Building Deconstruction (Small Structures)

Contract W912P420R0004

Sheet 15 of 17

Description Unit Quantity Unit Direct

Cost Direct CostWBS Number

Bid Schedule - Cost Plus Fixed Fee Tasks

Total Indirect Cost (Tasks 2a - 2f and 5a - 5g) (%) -$ Total Cost (Tasks 2a - 2f and 5a - 5g) -$

Fee (Tasks 2a - 2f and 5a - 5g)) (%) -$ Total Price (Tasks 2a - 2f and 5a - 5g) -$

Contract W912P420R0004

Sheet 16 of 17

Description Unit Quantity Unit Cost Total Cost

331XX 01 Mobilization and Prepatory Work 01 01 Mobilization of Construction Equipment and Facilities JOB 1 -$ -$ 01 03 Submittals/Implementation Plans JOB 1 -$ -$ 01 04 Setup/Construct Temporary Facilities JOB 1 -$ -$ 01 05 Construct Temporary Facilities JOB 1 -$ -$

Total Task 1 -$

331XX 19 Disposal 19 21 Transportation to Storage/Disposal Facility TON 78,274 -$ -$ 19 22 Disposal Fees and Taxes TON 78,274 -$ -$

Total Task 3a -$

331XX 19 Disposal 19 21 Transportation to Storage/Disposal Facility TON 32,159 -$ -$ 19 22 Disposal Fees and Taxes TON 32,159 -$ -$

Total Task 3b -$

331XX 19 Disposal 19 21 Transportation to Storage/Disposal Facility TON 37,181 -$ -$ 19 22 Disposal Fees and Taxes TON 37,181 -$ -$

Total Task 3c -$

331XX 19 Disposal 19 21 Transportation to Storage/Disposal Facility TON 3,521 -$ -$ 19 22 Disposal Fees and Taxes TON 3,521 -$ -$

Total Task 3d -$

331XX 19 Disposal 19 21 Transportation to Storage/Disposal Facility TON 1,672 -$ -$ 19 22 Disposal Fees and Taxes TON 1,672 -$ -$

Total Task 3e -$

331XX 19 Disposal 19 21 Transportation to Storage/Disposal Facility TON 1,970 -$ -$ 19 22 Disposal Fees and Taxes TON 1,970 -$ -$

Total Task 3f -$

Task 3f: Transportation and Disposal (Ditch)

Task 3d: Transportation and Disposal (Storage Area)

Task 3e: Transportation and Disposal (Under Production Building)

Bid Schedule - Firm Fixed Price Tasks

WBS Number

Task 1: Mobilization

Task 3a: Transportation and Disposal (Trenches 1 and 2)

Task 3b Transportation and Disposal (Trench 3)

Task 3c: Transportation and Disposal (Trenches 4 and 5)

Contract W912P420R0004

Sheet 17 of 17

Description Unit Quantity Unit Cost Total Cost

Bid Schedule - Firm Fixed Price Tasks

WBS Number

331XX 21 Demobilization 21 01 Removal of Temporary Facilities JOB 1 -$ -$ 21 02 Removal of Temporary Utilities JOB 1 -$ -$ 21 03 Final Decontamination JOB 1 -$ -$ 21 04 Demobilization of Construction Equipment and Facilities JOB 1 -$ -$ 21 05 Demobilization of Personnel JOB 1 -$ -$ 21 06 Submittals JOB 1 -$ -$

Total Task 4 -$

Total Cost (Tasks 1, 3a - 3f, 4) -$

Task 4: Demobilization

Summary
CPFF
FFP