Attachment 7_Bid Schedule.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Luckey Remediation Services
- Solicitation number
- W912P420R0004
About this file
This document includes a solicitation and performance work statement for remediation services at the Luckey FUSRAP Site in Ohio. The solicitation seeks proposals for excavation, transportation, and disposal of contaminated soils, sediments, and materials. Services will also include site maintenance, security, project management, quality control, permitting and compliance sampling. Material handling will require strict control and accounting procedures. The pre-proposal conference will be held on June 24th and questions are due by July 10th, with responses by July 24th. The proposal due date will not be extended. The work locations are specified as the Luckey FUSRAP Site and surrounding areas. The soliciting agency is the Department of the Army Corps of Engineers Buffalo District. The incumbent is listed as North Wind Portage.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Activity | Description | Unit | Quantity | Unit Cost | Direct Cost | Fixed Fee | Total Cost | |
| Percent | Cost |
Primary Tasks
| Task 1 - Mobilization | |||
| 331XX01 | Mobilization and Prepatory Work | JOB | 1 |
| Task 2a Soil Remediation (Trenches 1 and 2) | |||
| 331XX02 | Monitoring, Sampling, Testing, and Analysis | JOB | 1 |
| 331XX03 | Site Work | JOB | 1 |
| 331XX05 | Surface Water Collection and Control | JOB | 1 |
| 331XX08 | Solids Collection and Containment | JOB | 1 |
| 331XX09 | Liquids/Sediments/Sludges Collection and Containment | JOB | 1 |
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX20 | Site Restoration | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Task 2a |
| Task 2b Soil Remediation (Trench 3) | |||
| 331XX02 | Monitoring, Sampling, Testing, and Analysis | JOB | 1 |
| 331XX03 | Site Work | JOB | 1 |
| 331XX05 | Surface Water Collection and Control | JOB | 1 |
| 331XX08 | Solids Collection and Containment | JOB | 1 |
| 331XX09 | Liquids/Sediments/Sludges Collection and Containment | JOB | 1 |
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX20 | Site Restoration | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Task 2b |
| Task 2c Soil Remediation (Trenches 4 and 5) | |||
| 331XX02 | Monitoring, Sampling, Testing, and Analysis | JOB | 1 |
| 331XX03 | Site Work | JOB | 1 |
| 331XX05 | Surface Water Collection and Control | JOB | 1 |
| 331XX08 | Solids Collection and Containment | JOB | 1 |
| 331XX09 | Liquids/Sediments/Sludges Collection and Containment | JOB | 1 |
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX20 | Site Restoration | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Task 2c |
| Task 2d Storage Area | |||
| 331XX02 | Monitoring, Sampling, Testing, and Analysis | JOB | 1 |
| 331XX03 | Site Work | JOB | 1 |
| 331XX05 | Surface Water Collection and Control | JOB | 1 |
| 331XX08 | Solids Collection and Containment | JOB | 1 |
| 331XX09 | Liquids/Sediments/Sludges Collection and Containment | JOB | 1 |
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX20 | Site Restoration | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Task 2d |
| Task 2e Under Production Building | |||
| 331XX02 | Monitoring, Sampling, Testing, and Analysis | JOB | 1 |
| 331XX03 | Site Work | JOB | 1 |
| 331XX05 | Surface Water Collection and Control | JOB | 1 |
| 331XX08 | Solids Collection and Containment | JOB | 1 |
| 331XX09 | Liquids/Sediments/Sludges Collection and Containment | JOB | 1 |
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX20 | Site Restoration | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Task 2e |
| Task 2f Ditch | |||
| 331XX02 | Monitoring, Sampling, Testing, and Analysis | JOB | 1 |
| 331XX03 | Site Work | JOB | 1 |
| 331XX05 | Surface Water Collection and Control | JOB | 1 |
| 331XX08 | Solids Collection and Containment | JOB | 1 |
| 331XX09 | Liquids/Sediments/Sludges Collection and Containment | JOB | 1 |
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX20 | Site Restoration | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Task 2f |
| Task 3a Transportation and Disposal (Trenches 1 and 2) | |||||
| 331XX19 | Disposal | ||||
| 331XX1921 | Transportation to Storage/Disposal Facility | TON | 78,274 | --- | --- |
| 331XX1922 | Disposal Fees and Taxes | TON | 78,274 | --- | --- |
| Subtotal Task 3a | --- | ||||
| Task 3b Transportation and Disposal (Trench 3) | |||||
| 331XX19 | Disposal | ||||
| 331XX1921 | Transportation to Storage/Disposal Facility | TON | 32,159 | --- | --- |
| 331XX1922 | Disposal Fees and Taxes | TON | 32,159 | --- | --- |
| Subtotal Task 3b | |||||
| Task 3c Transportation and Disposal (Trenches 4 and 5) | |||||
| 331XX19 | Disposal | ||||
| 331XX1921 | Transportation to Storage/Disposal Facility | TON | 37,181 | --- | --- |
| 331XX1922 | Disposal Fees and Taxes | TON | 37,181 | --- | --- |
| Subtotal Task 3c | --- | ||||
| Task 3d Transportation and Disposal (Storage Area) | |||||
| 331XX19 | Disposal | ||||
| 331XX1921 | Transportation to Storage/Disposal Facility | TON | 3,521 | --- | --- |
| 331XX1922 | Disposal Fees and Taxes | TON | 3,521 | --- | --- |
| Subtotal Task 3d | --- | ||||
| Task 3e Transportation and Disposal (Under Production Building) | |||||
| 331XX19 | Disposal | ||||
| 331XX1921 | Transportation to Storage/Disposal Facility | TON | 1,672 | --- | --- |
| 331XX1922 | Disposal Fees and Taxes | TON | 1,672 | --- | --- |
| Subtotal Task 3e | --- | ||||
| Task 3f Transportation and Disposal (Ditch) | |||||
| 331XX19 | Disposal | ||||
| 331XX1921 | Transportation to Storage/Disposal Facility | TON | 1,970 | --- | --- |
| 331XX1922 | Disposal Fees and Taxes | TON | 1,970 | --- | --- |
| Subtotal Task 3f | --- | ||||
| Task 4 Demobilization | |||||
| 331XX21 | Demobilization | JOB | 1 |
| Total Bid Amount (Primary Tasks) |
| Optional Tasks |
| Optional Task 5a - Building Deconstruction (Melting, Alloying, & Shipping Building) | |||
| 331XX01 | Mobilization and Prepatory Work | JOB | 1 |
| 331XX10 | Miscellaneous Demolition and Removal | JOB | 1 |
| 331XX19 | Disposal (Commercial) | ||
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX1921 | Transportation to Storage/Disposal Facility | JOB | 1 |
| 331XX1922 | Disposal Fees and Taxes | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Optional Task 5a | |||
| Optional Task 5b - Building Deconstruction (Laboratory Building) | |||
| 331XX01 | Mobilization and Prepatory Work | JOB | 1 |
| 331XX10 | Miscellaneous Demolition and Removal | JOB | 1 |
| 331XX19 | Disposal (Commercial) | ||
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX1921 | Transportation to Storage/Disposal Facility | JOB | 1 |
| 331XX1922 | Disposal Fees and Taxes | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Optional Task 5b | |||
| Optional Task 5c - Building Deconstruction (Maintenance Office Building) | |||
| 331XX01 | Mobilization and Prepatory Work | JOB | 1 |
| 331XX10 | Miscellaneous Demolition and Removal | JOB | 1 |
| 331XX19 | Disposal (Commercial) | ||
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX1921 | Transportation to Storage/Disposal Facility | JOB | 1 |
| 331XX1922 | Disposal Fees and Taxes | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Optional Task 5c |
| Optional Task 5d - Building Deconstruction (Main Office Building) | |||
| 331XX01 | Mobilization and Prepatory Work | JOB | 1 |
| 331XX10 | Miscellaneous Demolition and Removal | JOB | 1 |
| 331XX19 | Disposal (Commercial) | ||
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX1921 | Transportation to Storage/Disposal Facility | JOB | 1 |
| 331XX20 | Site Restoration | JOB | 1 |
| 331XX1922 | Disposal Fees and Taxes | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Optional Task 5d | |||
| Optional Task 5e - Building Deconstruction (Employee Activity Building) | |||
| 331XX01 | Mobilization and Prepatory Work | JOB | 1 |
| 331XX10 | Miscellaneous Demolition and Removal | JOB | 1 |
| 331XX19 | Disposal (Commercial) | ||
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX1921 | Transportation to Storage/Disposal Facility | JOB | 1 |
| 331XX1922 | Disposal Fees and Taxes | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Optional Task 5e | |||
| Optional Task 5f - Building Deconstruction (Storage Building) | |||
| 331XX01 | Mobilization and Prepatory Work | JOB | 1 |
| 331XX10 | Miscellaneous Demolition and Removal | JOB | 1 |
| 331XX19 | Disposal (Commercial) | ||
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX1921 | Transportation to Storage/Disposal Facility | JOB | 1 |
| 331XX1922 | Disposal Fees and Taxes | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Optional Task 5f | |||
| Optional Task 5g - Building Deconstruction (Small Structures) | |||
| 331XX01 | Mobilization and Prepatory Work | JOB | 1 |
| 331XX10 | Miscellaneous Demolition and Removal | JOB | 1 |
| 331XX19 | Disposal (Commercial) | ||
| 331XX1920 | Container Handling | JOB | 1 |
| 331XX1921 | Transportation to Storage/Disposal Facility | JOB | 1 |
| 331XX1922 | Disposal Fees and Taxes | JOB | 1 |
| 331XX22 | General Requirements | JOB | 1 |
| Subtotal Optional Task 5g | |||
| Total Bid Amount (Optional Tasks) |
Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit Contract W912P420R0004
Sheet &P of &N
File details come from the government source that posted it. Updated .