This file is a Construction Drawing Set for the Kautz Road Substation (KRS) renovation project at Fermi National Accelerator Laboratory under RFP-383167-CD. The drawing set provides the technical specifications and visual documentation required for the general contractor to rebuild and renovate the KRS, which supplies electricity to various laboratory buildings and systems serving both conventional facility needs and process utility requirements. The drawings detail the construction scope, including foundation work, installation of a new prefabricated control house building, electrical systems, and associated infrastructure necessary to expand and revitalize the substation to serve existing and future loads.

The project is constrained by Fermilab's accelerator shutdown window, with an anticipated construction period from January 1, 2028, through January 1, 2030. Key project milestones include: completion of submittals and shop drawing approvals within 60 calendar days of Notice to Proceed; access to the Kautz Road Substation yard and construction commencement on January 4, 2028; completion of building foundation by March 31, 2028; and formal Authorization for Use and Possession by July 2, 2029. The general contractor is responsible for furnishing all supervision, labor, materials, tools, equipment, transportation, bonding, safety oversight, quality control, and management necessary to execute the complete construction scope as detailed in the drawings and technical specifications.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .