This is a Statement of Work (SOW) for UIP Subproject 2 – KRS, the Kautz Road Substation Construction Scope, issued by Fermi National Accelerator Laboratory (Fermilab), a U.S. Department of Energy Office of Science facility managed by Fermi Forward Discovery Group, LLC.

The subcontractor is required to rebuild and renovate the Kautz Road Substation (KRS), which supplies electricity to various laboratory buildings and systems serving both conventional facility needs and process utility requirements. The scope of work includes demolition of the existing building, equipment, conduit, ductbanks, and medium voltage feeders; expansion of KRS to accommodate a new control building on the existing foundation plus new supporting structures; installation of building foundations; installation of low voltage and medium voltage power feeders with medium voltage transformer; civil utilities upgrade and pavement renovation per new site plan; installation of harmonic filters; and installation of 345kV substation yard equipment. All detailed construction requirements are defined in the construction drawings and specifications referenced as attachments. The subcontractor must complete all Kautz Road Substation Upgrades by September 30, 2029. All subcontractor requirements, including required schedule submissions, are specified in Division 01 of the specifications.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UIP Subproject 2 – KRS Statement of Work (SOW)

Kautz Road Substation Construction Scope

Revision 1 May 28, 2026

Statement of Work: UIP - Kautz Road Substation Replacement ISD Engineering

Fermi National Accelerator Laboratory 2

1. SCOPE OF SERVICES – KAUTZ ROAD SUBSTATION

REPLACEMENT

1.1 Description

The Kautz Road Substation (KRS) subproject is one of the subprojects of the Utility Improvement Project (UIP). The subcontracted Architect/Engineer (A/E) has completed the 100% Final Design (FD) of the KRS subproject. Those documents are included for reference.

This scope of work is to rebuild and renovate the KRS, which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.

The Subproject 2 detailed construction requirements and scope of work is defined in the construction drawings and specifications.

1.2 Scope

At a high level, the scope of work for the Kautz Road Substation Rebuild includes but is not limited to the following:

• Demolition of existing building, equipment, conduit, ductbanks, MV feeders and others as indicated in the drawings.

• Expand KRS for location of new control building which will be located on the existing foundation as well as new pad and supporting structures to accommodate the size increase.

• Installation of foundation for new building addition.

• Installation of low voltage power to the building and within the building

• Installation of medium voltage power feeders to the building, including medium voltage transformer.

• Civil utilities upgrade and pavement renovation, associated with new site plan.

• Installation of harmonic filters

• Installation of 345kV substation yard equipment.

The scope of work is dictated by the drawings and specifications, which is included as an attachment.

1.3 Activities

All requirements of the Subcontractor are listed in the Division 01 specifications, including required schedule submissions.

Statement of Work: UIP - Kautz Road Substation Replacement ISD Engineering

Fermi National Accelerator Laboratory 3

1.4 Deliverables

The Subcontractor shall complete the Kautz Road Substation Upgrades by September 30, 2029.