Huntington Ravine Winter Access Trail Replacement
Closed Solicitation Posted
- Solicitation number
- 12445525B0013
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Gorham, New Hampshire, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service is soliciting bids for the Huntington Ravine Winter Access Trail Replacement project through the White Mountain National Forest's Androscoggin Ranger District in New Hampshire. The procurement involves demolishing five existing trail bridges and constructing new bridges of varying lengths: one 41-foot bridge (with 24-foot main span and 17-foot approach span), two 26-foot bridges, one 30-foot bridge, and one 24-foot bridge. Four bridges will be single span steel girder bridges with timber plank decks on steel grade beam foundations, while the 41-foot bridge will feature a timber dowel-lam deck. Additional work includes approach surface treatment, removal of existing materials, placement of riprap, and adherence to attached construction plans. This Invitation for Bid (IFB) follows FAR Part 14 procedures with evaluation based on lowest-priced, responsive, and responsible offeror criteria, and bids were due September 22, 2025, at 1:00 PM EST following a mandatory site visit held August 29, 2025.
This solicitation is set aside for small businesses and falls under Davis-Bacon and Related Acts wage requirements, with the Abstract of Offers showing four contractors submitted bids ranging from $1,540,980 to $4,627,739. The project has an estimated magnitude between $1,000,000 and $5,000,000 and requires contractors to be active in SAM.gov for award eligibility. The successful contractor must begin work within 10 calendar days of award and complete the project within 307 calendar days, with specific seasonal restrictions for in-stream work (June 1st to September 15th) and tree cutting (November 15th to March 31st). Performance will take place in Gorham, New Hampshire, within the White Mountain National Forest, with complex logistics potentially requiring helicopter transport for material delivery due to the remote mountainous location and lack of detour routes during construction.
Notice text
6 versions
Update #6 · Latest ·
Attached the abstract of bids.
Added attendee list for site visit.
The new bid date will be 22 September 2025 at 1300PM EST. Bid opening link attached. The opening will be Sep 22 @ 1300 EST.
Inspection reports have been added to the attached files.
The U.S. Department of Agriculture, Forest Service announces an opportunity on the White Mountain National Forest, Androscoggin Ranger District in Gorham, NH for the following:
Work will include demolition of five existing trail bridges and unused material to be dispose of off FS lands. Construction of the new trail bridges of varying lengths. Bridge length are 41 foot (overall length) 24 ft main span and 17 ft approach span, two 26 foot bridges, a 30 foot and 24 foot bridges. Four bridges are single span steel girder bridges with a timber plank deck on steel grade beam foundations. The 41 foot bridge is steel girder bridge with timber dowel-lam deck on steel grade beam foundations. Bridge plans provided show what the structures will use; steel stringers, a timber decks and abutments. Additional work includes but not limited to, approach surface treatment, removal of existing materials and placement of riprap. All construction will be following the attached plan set.
The Davis-Bacon and Related Acts (DBRA) apply to this solicitation and is set-aside for small businesses. See attachments for complete details and bid submission instructions.
There is a Site Visit at the following directions:
Pinkham North Visitor Center, 361 Nh-16, Gorham, NH 03581 on 8/29/25 at 10:00 am EST.
Please contact Bryanne Thompson if you will attend at bryanne.thompson@usda.gov or 603-536-6258. See Solicitation Section L, 52.236-27 Site Visit (Construction) for more information.
This announcement constitutes a solicitation for construction issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.
Interested contractors must be active in SAM.gov on the date the bid is received to be eligible for award. Quotes submitted by contractors without an active record in SAM.gov will not be considered.
The solicitation is posted to SAM.gov and no hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. No reimbursement will be made for any costs associated with providing information in response to this solicitation or any follow up information requests.
For further information, review the attached IFB solicitation and associated attachments.
All questions shall be submitted by 9/12/2025.
Update #5 ·
Added attendee list for site visit.
The new bid date will be 22 September 2025 at 1300PM EST. Bid opening link attached. The opening will be Sep 22 @ 1300 EST.
Inspection reports have been added to the attached files.
The U.S. Department of Agriculture, Forest Service announces an opportunity on the White Mountain National Forest, Androscoggin Ranger District in Gorham, NH for the following:
Work will include demolition of five existing trail bridges and unused material to be dispose of off FS lands. Construction of the new trail bridges of varying lengths. Bridge length are 41 foot (overall length) 24 ft main span and 17 ft approach span, two 26 foot bridges, a 30 foot and 24 foot bridges. Four bridges are single span steel girder bridges with a timber plank deck on steel grade beam foundations. The 41 foot bridge is steel girder bridge with timber dowel-lam deck on steel grade beam foundations. Bridge plans provided show what the structures will use; steel stringers, a timber decks and abutments. Additional work includes but not limited to, approach surface treatment, removal of existing materials and placement of riprap. All construction will be following the attached plan set.
The Davis-Bacon and Related Acts (DBRA) apply to this solicitation and is set-aside for small businesses. See attachments for complete details and bid submission instructions.
There is a Site Visit at the following directions:
Pinkham North Visitor Center, 361 Nh-16, Gorham, NH 03581 on 8/29/25 at 10:00 am EST.
Please contact Bryanne Thompson if you will attend at bryanne.thompson@usda.gov or 603-536-6258. See Solicitation Section L, 52.236-27 Site Visit (Construction) for more information.
This announcement constitutes a solicitation for construction issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.
Interested contractors must be active in SAM.gov on the date the bid is received to be eligible for award. Quotes submitted by contractors without an active record in SAM.gov will not be considered.
The solicitation is posted to SAM.gov and no hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. No reimbursement will be made for any costs associated with providing information in response to this solicitation or any follow up information requests.
For further information, review the attached IFB solicitation and associated attachments.
All questions shall be submitted by 9/12/2025.
Update #4 ·
The new bid date will be 22 September 2025 at 1300PM EST. Bid opening link attached. The opening will be Sep 22 @ 1300 EST.
Inspection reports have been added to the attached files.
The U.S. Department of Agriculture, Forest Service announces an opportunity on the White Mountain National Forest, Androscoggin Ranger District in Gorham, NH for the following:
Work will include demolition of five existing trail bridges and unused material to be dispose of off FS lands. Construction of the new trail bridges of varying lengths. Bridge length are 41 foot (overall length) 24 ft main span and 17 ft approach span, two 26 foot bridges, a 30 foot and 24 foot bridges. Four bridges are single span steel girder bridges with a timber plank deck on steel grade beam foundations. The 41 foot bridge is steel girder bridge with timber dowel-lam deck on steel grade beam foundations. Bridge plans provided show what the structures will use; steel stringers, a timber decks and abutments. Additional work includes but not limited to, approach surface treatment, removal of existing materials and placement of riprap. All construction will be following the attached plan set.
The Davis-Bacon and Related Acts (DBRA) apply to this solicitation and is set-aside for small businesses. See attachments for complete details and bid submission instructions.
There is a Site Visit at the following directions:
Pinkham North Visitor Center, 361 Nh-16, Gorham, NH 03581 on 8/29/25 at 10:00 am EST.
Please contact Bryanne Thompson if you will attend at bryanne.thompson@usda.gov or 603-536-6258. See Solicitation Section L, 52.236-27 Site Visit (Construction) for more information.
This announcement constitutes a solicitation for construction issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.
Interested contractors must be active in SAM.gov on the date the bid is received to be eligible for award. Quotes submitted by contractors without an active record in SAM.gov will not be considered.
The solicitation is posted to SAM.gov and no hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. No reimbursement will be made for any costs associated with providing information in response to this solicitation or any follow up information requests.
For further information, review the attached IFB solicitation and associated attachments.
All questions shall be submitted by 9/12/2025.
Update #3 ·
The new bid date will be 22 September 2025 at 1300PM EST.
Inspection reports have been added to the attached files.
The U.S. Department of Agriculture, Forest Service announces an opportunity on the White Mountain National Forest, Androscoggin Ranger District in Gorham, NH for the following:
Work will include demolition of five existing trail bridges and unused material to be dispose of off FS lands. Construction of the new trail bridges of varying lengths. Bridge length are 41 foot (overall length) 24 ft main span and 17 ft approach span, two 26 foot bridges, a 30 foot and 24 foot bridges. Four bridges are single span steel girder bridges with a timber plank deck on steel grade beam foundations. The 41 foot bridge is steel girder bridge with timber dowel-lam deck on steel grade beam foundations. Bridge plans provided show what the structures will use; steel stringers, a timber decks and abutments. Additional work includes but not limited to, approach surface treatment, removal of existing materials and placement of riprap. All construction will be following the attached plan set.
The Davis-Bacon and Related Acts (DBRA) apply to this solicitation and is set-aside for small businesses. See attachments for complete details and bid submission instructions.
There is a Site Visit at the following directions:
Pinkham North Visitor Center, 361 Nh-16, Gorham, NH 03581 on 8/29/25 at 10:00 am EST.
Please contact Bryanne Thompson if you will attend at bryanne.thompson@usda.gov or 603-536-6258. See Solicitation Section L, 52.236-27 Site Visit (Construction) for more information.
This announcement constitutes a solicitation for construction issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.
Interested contractors must be active in SAM.gov on the date the bid is received to be eligible for award. Quotes submitted by contractors without an active record in SAM.gov will not be considered.
The solicitation is posted to SAM.gov and no hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. No reimbursement will be made for any costs associated with providing information in response to this solicitation or any follow up information requests.
For further information, review the attached IFB solicitation and associated attachments.
All questions shall be submitted by 9/12/2025.
Update #2 ·
Inspection reports have been added to the attached files.
The U.S. Department of Agriculture, Forest Service announces an opportunity on the White Mountain National Forest, Androscoggin Ranger District in Gorham, NH for the following:
Work will include demolition of five existing trail bridges and unused material to be dispose of off FS lands. Construction of the new trail bridges of varying lengths. Bridge length are 41 foot (overall length) 24 ft main span and 17 ft approach span, two 26 foot bridges, a 30 foot and 24 foot bridges. Four bridges are single span steel girder bridges with a timber plank deck on steel grade beam foundations. The 41 foot bridge is steel girder bridge with timber dowel-lam deck on steel grade beam foundations. Bridge plans provided show what the structures will use; steel stringers, a timber decks and abutments. Additional work includes but not limited to, approach surface treatment, removal of existing materials and placement of riprap. All construction will be following the attached plan set.
The Davis-Bacon and Related Acts (DBRA) apply to this solicitation and is set-aside for small businesses. See attachments for complete details and bid submission instructions.
There is a Site Visit at the following directions:
Pinkham North Visitor Center, 361 Nh-16, Gorham, NH 03581 on 8/29/25 at 10:00 am EST.
Please contact Bryanne Thompson if you will attend at bryanne.thompson@usda.gov or 603-536-6258. See Solicitation Section L, 52.236-27 Site Visit (Construction) for more information.
This announcement constitutes a solicitation for construction issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.
Interested contractors must be active in SAM.gov on the date the bid is received to be eligible for award. Quotes submitted by contractors without an active record in SAM.gov will not be considered.
The solicitation is posted to SAM.gov and no hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. No reimbursement will be made for any costs associated with providing information in response to this solicitation or any follow up information requests.
For further information, review the attached IFB solicitation and associated attachments.
All questions shall be submitted by 9/12/2025.
Update #1 ·
The U.S. Department of Agriculture, Forest Service announces an opportunity on the White Mountain National Forest, Androscoggin Ranger District in Gorham, NH for the following:
Work will include demolition of five existing trail bridges and unused material to be dispose of off FS lands. Construction of the new trail bridges of varying lengths. Bridge length are 41 foot (overall length) 24 ft main span and 17 ft approach span, two 26 foot bridges, a 30 foot and 24 foot bridges. Four bridges are single span steel girder bridges with a timber plank deck on steel grade beam foundations. The 41 foot bridge is steel girder bridge with timber dowel-lam deck on steel grade beam foundations. Bridge plans provided show what the structures will use; steel stringers, a timber decks and abutments. Additional work includes but not limited to, approach surface treatment, removal of existing materials and placement of riprap. All construction will be following the attached plan set.
The Davis-Bacon and Related Acts (DBRA) apply to this solicitation and is set-aside for small businesses. See attachments for complete details and bid submission instructions.
There is a Site Visit at the following directions:
Pinkham North Visitor Center, 361 Nh-16, Gorham, NH 03581 on 8/29/25 at 10:00 am EST.
Please contact Bryanne Thompson if you will attend at bryanne.thompson@usda.gov or 603-536-6258. See Solicitation Section L, 52.236-27 Site Visit (Construction) for more information.
This announcement constitutes a solicitation for construction issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.
Interested contractors must be active in SAM.gov on the date the bid is received to be eligible for award. Quotes submitted by contractors without an active record in SAM.gov will not be considered.
The solicitation is posted to SAM.gov and no hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. No reimbursement will be made for any costs associated with providing information in response to this solicitation or any follow up information requests.
For further information, review the attached IFB solicitation and associated attachments.
All questions shall be submitted by 9/12/2025.
Files
Show all 22
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Huntington Ravine Winter Access Trail Bridges Replacement | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| Acadia National Park | Federal Highway Administration | Total Small Business | |
| Cisco Branch Ontonagon River Bridge Replacement | Forest Service | Total Small Business | |
| ND NP THRO 204(1) Buck Hill Road | Federal Highway Administration | No set-aside |