This document is a Trail Bridge Inspection report for the HRWAT #1 bridge located in the White Mountain National Forest, Androscoggin Ranger District. The bridge is a complex, single-span timber trail bridge with a deck girder structure, designed for snow cat use on Trail #31393-0.1200. The overall bridge length is 37 feet, with an overall deck width of 144 inches and steel main span stringers. The inspection, conducted on 9/28/2023 by Steve Wright, P.E., reveals the bridge is in fair to poor condition, with specific issues including wide deck plank spacing, approach spans in poor condition, and light to moderate deterioration of timber decking and running boards.

Key recommendations include removing and replacing approach spans, considering deck and wearing surface replacement in the next several years, and addressing maintenance tasks such as repairing running planks, installing safety signage, and potential curb installation. The bridge crosses a rocky stream with good scour protection, and the surrounding environment is a dense forest with vegetation growing through the deck boards. The inspection suggests several specific maintenance tasks with associated costs, including approach fill repair ($678.88), running plank repair ($13.80 per square foot), and inspection of the deck girder ($1,725 per each).

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Trail #-MP:

1 1

Material:

4 x 16'' x 5.5'' x 37'

Material:

2 x x x

Material:

Material:

3'' x 8'' x x

Plan Number:

37' 144'' Service Under Bridge:

22.5' 144'' Vertical Under Bridge Opening (ft):

36' Top of Deck Height (ft):

Vertical Clear Height (ft):

Tr. Bridge Name: Feature Crossed: 0 31393-0.1200HRWAT #1

Structure Remarks

Bridge substructure and superstructure are in fair condition. Very wide spacing on deck planks; 3x8's spaced at 10" O.C.. The approach spans are in poor condition with local failures and should be rebuilt longer. Diaphragms in good condition with 94" spacing with no end diaphragms. 36” girder spacing (likely W16x26), W beam H=16” Wf=5.5” Tf=3/8 Tw=1/4 23'-9" overall length. Light rust on the bottom of each stringer. Running plank 5’ c-c. Sills (5) 2x12s.

Timber decking and running boards have some light to moderate moss, heavy weathering, scaring, and general deterioration. Some sections of the running boards are missing. Some plant and tree growth through deck boards and the approach spans.

Recommendations to remove and replace approach spans. Consider replacing deck and wearing surface in the next several years.

Bridge Flare (Y/N):

Maximum Span (ft):

Clear Span (ft):

Overall Deck Width (in):

Horizontal Clear Width (in):

Tread Width (in):

User Barrier Rail Type:

Max Rail Opening:

(in)

WATERWAY

TRACS

TRAIL BRIDGE

Curb Material:

Geometry / Design / Rating

Curb (Ht" x W"):

Rail Material:

Bridge Skew (°):

Dimensions (D”xW”xL”):

Approach Span Type: DECK GIRDER

Substructure Type: SPREAD FOOTING

Location: 31393 White Mountain NF Feature Crossed:

Quantity and Dimensions (Q x D” x W” x L'):

Deck Type: PLANK

Trail Class: 3 Designed Use:

White Mountain NF District:

Superstructure Number of Approach Spans:

Quantity and Dimensions (Q x D” x W” x L'):

Latitude: 44.265064 Longitude: -71.279268

Wearing Surface:

DECK GIRDER

Overall Length (ft):

STEEL

TIMBER, SAWN UNTREATED

TIMBER, UNTREATED

INSPECTION

Forest/Special Use Unit:

Main Span Type:

CategoryBRIDGE IDENTIFICATION AND LOCATION

Trail Bridge Name: HRWAT #1 Trail Number-Bridge MP:

COMPLEX

31393-0.1200

SNOW CAT

Androscoggin RD

STRUCTURE TYPE AND MATERIAL

Number of Main Spans:

Rail Ht:

(in)

TIMBER, SAWN UNTREATED

Choose an item.

None

Trail #-MP:Tr. Bridge Name: Feature Crossed: 0 31393-0.1200HRWAT #1

TRACSInspection Date: 24

Inspected by:

59. SUPERSTRUCT (Approach Span):

59. SUPERSTRUCTURE (Main Span):

Bearings

Paint

Bracing

Floor Beams

All

Flooring

Girder

Diaphrams/Bracing

Stringers/Girders Failed

Flooring

Girder

Bearings

Paint

Bracing

Floor Beams

Stringers/Girders

Inspection Frequency (Months):

Steel stringers.

ITEM

Wearing Surface:

58. DECK:

Cleanliness

Deck Slab/Panels

Drains and Drainage

Utilities

Deck Joints

REMARKS

Two rows of 2x12 running planks. Two missing deck boards.

Some scarring and heavy weathering4

Fair

Poor

Good

CODE

Failed

No significant attachment to wood abutment planks

CONDITION CODES and REMARKS

Stringers/Girders

Diaphrams/Bracing

Stringers/Girders

NOB

NOB

Fair

Fair

No end diaphragms

Surface rust, no section loss

36. User Barriers:

Post -

Curb -

All

9/28/2023

Steve Wright, P.E.

Description:

N None

Railing -

TRACS

MEET

Rocky overgrown hiking/winter access trail

A bu tm en ts

REMARKS

Rocky with large stones

Stacked PT 2x6's on grade

Opening/Stream Constraint

Vertical Underbridge Opening

COMPONENT

Deck Width

VALUE

NOB

Poor

Good

Poor

Channel Protection

Channel Scour/Erosion

Vegetation

Waterway Obstruction/Drift

Appraisal – Bridge Elements Meet TMO? (Print TMO direct from INFRA Tr. Bridge Module)

Need to replace both

Good

Good

Fair

All

60. SUBSTRUCTURE:

Alignment/Settlment/Skew

Scour/Erosion

Backing Plank/Backwall

Gabion/Reinforced Earth

Sill/Grade Beam

Stacked 2x6's

Failed

NOB

Fair

Good

Fair

Rocky stream bottom provides good scour protection

Other

TRAIL APPROACHES:

Approach Settlement

Shoulder Embankment

Surfacing

71.WATERWAY ADEQUACY:

Sill/Grade Beam

P ie rs

61. Channel

User Barrier

Bridge Grade

Trail Alignment

Trail Grade

Tread Width

TB-CPX-INS-LDR-02B

TB-CPX-WHL-01A

Load rate

TB-CPX-CRB-TBR-02A

Install curb, both sides.

47.5

Repair/replace/install safety signage

Wearing_Surface

User_Barrier Timber $59.34 / LN FT

Tasks

Repair/replace approach fills per bridge

Item Category Task Material Cost/Unit Severity

Quantity

Approaches Any material $678.88 / LS 2

Task ID

Comments

TB-CPX-APR-EMB-02B

Replace both approaches

Whole_Bridge Any material $1.99 / SQ FT 1500

Task ID

Comments

Basic Maintenance

Task ID

Comments

Inspection Steel $1725 / EACH - Difficult 1

Task ID

Comments

Inspection-deck girder, side girder, single unit slab/beam

Comments

Approaches Task ID Any material $228.33 / EACH

TB-CPX-WSF-TBR-02A

Repair running planks

Task ID

Comments

Repair/replace/install Curb

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

TB-CPX-APR-SGN-02A

Install OMs

Timber $13.80 / SQ FT - Replace in-kind 100

Wearing Surface-Repair/replace/install

Material Cost/Unit Severity

Quantity

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Tasks

Item Category Task

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

Task ID

Comments

X

** As needed, insert additional pages for photos of structure and/or site.

37'

0''

144''

HRWAT #1Structure Name: Feature Crossed: 0 Trail #-MP: 31393-0.1200

0''

0''

0'' 0''

16'' 5.5''

36'

22.5'

36" 9'

9/28/2023

River Right Approach, Abutment 1

Insert photo here.

River Left Approach Abutment 2

Trail #-MP: 31393-0.1200 Feature Crossed: 0.0000

BRIDGE PHOTOS

Insert photo here.

Date:Structure Name: HRWAT #1

Structure Name:

Feature Crossed: 0.0000

HRWAT #1 Date: 9/28/2023

Trail #-MP: 31393-0.1200

BRIDGE PHOTOS - cont.

Looking Upstream from the Bridge Deck

Insert photo here.

Looking Downstream from the Bridge Deck

HRWAT #1 Date: 9/28/2023

Trail #-MP: 31393-0.1200

BRIDGE PHOTOS - cont.

Looking Upstream - Elevation Profile

Insert photo here.

Looking Upstream - Elevation Profile

HRWAT #1 Date: 9/28/2023

Trail #-MP: 31393-0.1200

BRIDGE PHOTOS - cont.

Insert photo here.

River Right Abutment

Insert photo here.

River Left Abutment

HRWAT #1 Date: 9/28/2023

Trail #-MP: 31393-0.1200

BRIDGE PHOTOS - cont.

Insert photo here.

View of Superstructure

Insert photo here.

View of Approach Span