Humbolt pacific crest trail bridge replacement
Open Solicitation Posted
- Solicitation number
- 1240LT27Q0026
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Bridgeport, California 93517, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service seeks quotes to replace the Pacific Crest Trail bridge over the West Fork West Walker River in the Hoover Wilderness, with revised quotes due December 11, 2026 at 1700 Mountain Time. The Set Aside line reads "No Set-Aside Used," but the Rev2 note and the Rev2 Schedule of Items describe a Total Small Business set-aside, a conflict to resolve with the contracting officer before bidding.
Place of performance is Bridgeport, California 93517, within the Bridgeport Ranger District of Humboldt-Toiyabe National Forest in Mono County. The site has no motorized access. Materials are slung in by helicopter from a staging area about 8 miles away, and landings up to one mile from the bridge are acceptable.
The work comprises seven line items, all lump sum except 30 linear feet of approach railing: helicopter-supported mobilization, full removal of the existing steel and timber bridge, structure excavation and backfill, a temporary bypass trail and ford crossing with signage, hazard tree removal (approximately 10 to 12 trees, 10 to 24 inches diameter at breast height), and design, fabrication, transport, and installation of a 35-foot glulam deck panel bridge. Alternative steel truss designs are not acceptable. Work must comply with Minimum Requirements Analysis Framework wilderness regulations and Leave No Trace principles. Explosives are prohibited. Shop drawings and calculations require Forest Service approval. Davis-Bacon wage determination CA20260020, effective July 30, 2026, applies.
Performance runs July 1, 2027 through October 29, 2027 (120 days) under a firm fixed-price award. The magnitude range is $500,000 to $1,000,000. The anticipated award date of December 10, 2026 precedes the revised due date. Bid bond equals 20% of the quote. Quotes are submitted electronically to Contracting Officer Lonnie D. Root at lonnie.root@usda.gov. Performance and payment bonds are required within 10 calendar days of award.
Award goes to the responsible quoter with the lowest evaluated price among technically acceptable quotes, with no price-technical trade-offs. Technical acceptability rests on schedule capability and understanding of material requirements. Rev2 replaces the Experience Questionnaire and Past Performance Data Sheet (C04d and C04e) with D04f. The detailed evaluation factors are in attachment C04f. The pre-bid meeting (November 6, 2026) and the question deadline (November 11, 2026) have passed. No incumbent is named. NAICS is 237310, and PSC is Y1LB.
Notice text
4 versions
Update #4 · Latest ·
HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Rev2 (11/20/26)
- Due Date Changed to 12/11/2026
- C04d & CO4e has been Replaced with D04f and removed from SAM
- Link to Video showing area is added as https://usfs-public.box.com/s/1nrudtpidlbvjnrs37ffzf0mefimog21
- C04a updated SOI with CO4a Rev2
- Note Small Business Set Aside is “Total Small Business set-aside.”
- Magnitued Range are Between $500,000 and $1,000,000
- Bid Bond amount: Shall be 20% of Quote
- Quotes Must be submitted Electronicly to CO at lonnie.root@usda.gov
Revised Attachments:
C04 R2_1240LT27Q0026_SOW
C04a R2 SOI
C04b R2_Drawings_PCT TRAIL BRIDGE
CO4f_EvaluationFactors
C04g R2_QA 11_05_2026_PCT_Bridge
Removed Attachments:
C04d Experience Questionnaire_1240LT27Q0026 - Removed
C04e Past Performance Data Sheet_1240LT27Q0026 - Removed
============================================================
Rev1
Q&A Due Date: 11/11/2026
Vendor Questions must be Emailed Directly to the COR:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
jordan.burge@usda.gov
VIRTUAL PRE-BID MEETING
The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible.
Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish). Just cancel the “open Teams” window, then select the “join through browser” option. If you are calling from a phone and don’t already have an account, use the phone number and meeting ID below.
https://teams.microsoft.com/meet/2468609727966558?p=WAkhAgBGrwO9mYB2Su
Phone Number: (202) 650-0123
Meeting ID: 898702315#
====================================================================
HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Forest: Humboldt-Toiyabe National Forest (HTNF)
Bridgeport Ranger Station
The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access.
Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience.
ATTACHMENTS:
C04a ScheduleOfItems_SectionB_1240LT27Q0026
C04b DesignDrawings_1240LT27Q0026
C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026
C04d Experience Questionnaire_1240LT27Q0026 - Removed
C04e Past Performance Data Sheet_1240LT27Q0026 - Removed
AWARD SCHEDULE:
Site Visit: Friday, November 6 at 10:00am PST on Zoom
Q&A Due Date: 11/11/2026
Quotes Due Date: 11/28/2026 - 1700 MT
Anticipated Award Date: 12/10/2026
POP: July/01/2027 - 10/29/2027 = 120 days
Contracting Officer Representative:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
jordan.burge@usda.gov
Update #3 ·
Rev1
Q&A Due Date: 11/11/2026
Vendor Questions must be Emailed Directly to the COR:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
jordan.burge@usda.gov
VIRTUAL PRE-BID MEETING
The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible.
Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish). Just cancel the “open Teams” window, then select the “join through browser” option. If you are calling from a phone and don’t already have an account, use the phone number and meeting ID below.
https://teams.microsoft.com/meet/2468609727966558?p=WAkhAgBGrwO9mYB2Su
Phone Number: (202) 650-0123
Meeting ID: 898702315#
HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Forest: Humboldt-Toiyabe National Forest (HTNF)
Bridgeport Ranger Station
The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access.
Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience.
ATTACHMENTS:
C04a ScheduleOfItems_SectionB_1240LT27Q0026
C04b DesignDrawings_1240LT27Q0026
C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026
C04d Experience Questionnaire_1240LT27Q0026
C04e Past Performance Data Sheet_1240LT27Q0026
AWARD SCHEDULE:
Site Visit: Friday, November 6 at 10:00am PST on Zoom
Q&A Due Date: 11/11/2026
Quotes Due Date: 11/28/2026 - 1700 MT
Anticipated Award Date: 12/10/2026
POP: July/01/2027 - 10/29/2027 = 120 days
Contracting Officer Representative:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
jordan.burge@usda.gov
Update #2 ·
Rev1
VIRTUAL PRE-BID MEETING
The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible.
Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish). Just cancel the “open Teams” window, then select the “join through browser” option. If you are calling from a phone and don’t already have an account, use the phone number and meeting ID below.
https://teams.microsoft.com/meet/2468609727966558?p=WAkhAgBGrwO9mYB2Su
Phone Number: (202) 650-0123
Meeting ID: 898702315#
HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Forest: Humboldt-Toiyabe National Forest (HTNF)
Bridgeport Ranger Station
The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access.
Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience.
ATTACHMENTS:
C04a ScheduleOfItems_SectionB_1240LT27Q0026
C04b DesignDrawings_1240LT27Q0026
C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026
C04d Experience Questionnaire_1240LT27Q0026
C04e Past Performance Data Sheet_1240LT27Q0026
AWARD SCHEDULE:
Site Visit: Friday, November 6 at 10:00am PST on Zoom
Q&A Due Date: 11/04/2026
Quotes Due Date: 11/28/2026 - 1700 MT
Anticipated Award Date: 12/10/2026
POP: July/01/2027 - 10/29/2027 = 120 days
Contracting Officer Representative:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
jordan.burge@usda.gov
Update #1 ·
HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Forest: Humboldt-Toiyabe National Forest (HTNF)
Bridgeport Ranger Station
The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access.
Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience.
ATTACHMENTS:
C04a ScheduleOfItems_SectionB_1240LT27Q0026
C04b DesignDrawings_1240LT27Q0026
C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026
C04d Experience Questionnaire_1240LT27Q0026
C04e Past Performance Data Sheet_1240LT27Q0026
AWARD SCHEDULE:
Site Visit: 11/03/2026 - to be held on Zoom do to location
Q&A Due Date: 11/04/2026
Quotes Due Date: 11/28/2026 - 1700 MT
Anticipated Award Date: 12/10/2026
POP: July/01/2027 - 10/29/2027 = 120 days
Contracting Officer Representative:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
jordan.burge@usda.gov
Files
| File | Type | Posted |
|---|---|---|
| C04 R2_1240LT27Q0026_SOW.pdf | ||
| CO4f R2_EvaluationFactors.docx | DOCX document | |
| C04a R2 SOI.xls | XLS spreadsheet | |
| C04b R2_Drawings_PCT TRAIL BRIDGEup.pdf | ||
| C04g R2_QA 11_05_2026_PCT_Bridge.doc | DOC document | |
| C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026.txt | TXT text file | |
| C04 1240LT27Q0026_SOW.pdf | ||
| C04a SOI_1240LT27Q0026.xls | XLS spreadsheet | |
| C04b Drawings_PCT TRAIL BRIDGE_1240LT27Q0026.pdf | ||
| C04d Experience Questionnaire _1240LT27Q0026.pdf | ||
| C04e - Past Performance Data Sheet_1240LT27Q0026.pdf |
Show all 11
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Elkhorn Trail Bridge | Forest Service | Total Small Business | |
| Camptonville Housing Decommissioning | Forest Service | Total Small Business | |
| GAOA Brainard Lake Recreation Area Deferred Maintenance | Forest Service | Total Small Business | |
| SNPLMA Kalamazoo Fence | Forest Service | Total Small Business | |
| ANF Suppression Damage Chantry | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity