Huntington Ravine Winter Access Trail Bridges Replacement
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 12445525B0013
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Gorham, New Hampshire, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Forest Service, Department of Agriculture, is seeking contractors to replace five existing trail bridges on the Huntington Ravine Winter Access Trail with new bridges of varying lengths. The project requires demolition of the current structures and disposal of materials off Forest Service lands, followed by construction of new bridges including a 41-foot bridge with 24-foot main span and 17-foot approach span, two 26-foot bridges, one 30-foot bridge, and one 24-foot bridge. Four of the new bridges will be single-span steel girder bridges with timber plank decks on steel grade beam foundations. Contractors must supply all labor, materials, equipment, utilities, and maintain valid licenses for the work. The solicitation is expected to be issued on or about August 22, 2025, with proposal documents available electronically through SAM.gov in PDF format.
This procurement is designated as a Total Small Business set-aside, restricting participation to qualifying small businesses. Prospective contractors must maintain active registration in the System for Award Management (SAM) both at proposal submission and award. The solicitation number is 12445525B0013, and the work falls under NAICS code 237310 for Highway, Street, and Bridge Construction. No current contractor or incumbent information is provided in the pre-solicitation notice. The notice does not specify contract value ranges or performance timelines, indicating these details will be included in the formal solicitation documents. Interested parties must monitor SAM.gov for amendments and changes, as paper copies will not be distributed.
Notice text
GENERAL:
The U.S. Forest Service, Department of Agriculture, is soliciting proposals on a Total Small Business set aside basis from all interested businesses having the capability to perform the work described below. The solicitation will be issued electronically at www.sam.gov. Proposal documents will be available for download and specifications will be available in Adobe PDF format; and drawings will be available in PDF format. Please Note: Paper copies of the solicitation will not be made available.
Solicitation #: 12445525B0013
Vendors can search for opportunities and award history on www.sam.gov without registering. Interested vendors and plan holders are required to visit the website periodically to check for amendments and other changes to the synopsis or solicitation documents.
Prospective offerors desiring to conduct business with the USDA are required to have an active registration in the Systems for Awards Management (SAM) at www.sam.gov at the receipt of proposals and at the time of award.
This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation. Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after the date listed below.
Proposed Solicitation Issue Date: Estimated on/about August 22, 2025.
Description:
The work for this project requires the Contractor to be responsible for supplying all labor,
materials, equipment, utilities, miscellaneous items, freight and delivery and all
necessary valid licenses for the work summarized as follows:
Work will include demolition of five existing trail bridges and unused material to be dispose of off FS lands. Construction of the new trail bridges of varying lengths. Bridge length are 41 foot (overall length) 24 ft main span and 17 ft approach span, two 26 foot bridges, a 30 foot and 24 foot bridges. Four bridges are single span steel girder bridges with a timber plank deck on steel grade beam foundations. The 41 foot bridge is steel girder bridge with timber dowel-lam deck on steel grade beam foundations. Bridge plans provided show what the structures will use; steel stringers, a timber decks and abutments. Additional work includes but not limited to, approach surface treatment, removal of existing materials and placement of riprap.
Type of Procurement: This will be sealed bid in accordance with FAR Part 14.
GENERAL INFORMATION: IAW FAR 36.204, the estimated magnitude of the project is between $1 million and $5 million.
Estimated Period of Performance: 90 calendar days from Notice to Proceed
Proposal receipt date is not known at this time. The actual date will be established in the solicitation documents
A pre-proposal meeting may be posted, and date/location will be noted in the solicitation.
This project is subject to the Davis-Bacon Act. Bonds will be required as follows:
Contractors are reminded that any amount awarded over $35,000 requires submission of a Payment Bond. Any amount over $150,000.00 requires both payment and performance bonds.
Be advised that this requirement may be delayed, cancelled, or revised at any time during the process based on decisions related to Department of Agriculture (USDA) and the U.S. Forest Service (FS) changes.
This procurement is a Total Small Business set aside set aside. Responsible small business sources may submit an offer that will be considered. The small business size standard for NAICS 237310 is $45 million.
All responsible sources may submit an offer which, if submitted in a timely manner, will be considered. It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov.
Place of Performance:
White Mountain National Forest
Huntington Ravine Winter Access Trail
Access to the trail is out of the AMC Pinkham Notch Visitor Center, 361 NH -16 Gorham, New Hampshire, Coos County, within the White Mountain National Forest, Androscoggin Ranger District.
Primary Point of Contact:
Michelle Reed
michelle.r.reed@usda.gov
Notice history
| Notice | Type | Posted |
|---|---|---|
| Huntington Ravine Winter Access Trail Replacement | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Acadia National Park | Federal Highway Administration | Total Small Business | |
| YELL 338223 - Bridge Preservation | National Office | No set-aside | |
| Cisco Branch Ontonagon River Bridge Replacement | Forest Service | Total Small Business | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity