Abstract of Offers Huntington.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 12445525B0013
- Issued by
-
Department of Agriculture Forest Service
About this file
The file is an Abstract of Offers for the Huntington Ravine Winter Access Trail Replacement project, documenting bid details from seven potential contractors. The solicitation, issued by the U.S. Department of Agriculture Forest Service for the White Mountain National Forest, requires demolition of five existing trail bridges and construction of new trail bridges with varying lengths (41-foot, 26-foot, 30-foot, and 24-foot), including steel girder bridges with timber plank or dowel-lam decks on steel grade beam foundations.
The bid abstract reveals four contractors submitted pricing: Kovilic Construction Co, Rays Electric and General Contracting, J.P. Sicard Inc., with total bid prices ranging from $1,540,980 to $4,627,739. The project is set aside for small businesses, applies Davis-Bacon wage rates, and has a bid date of 22 September 2025 at 1:00 PM EST. A mandatory site visit is scheduled for 29 August 2025 at 10:00 AM EST at the Pinkham North Visitor Center in Gorham, NH, with contact information provided for Bryanne Thompson. Contractors must be active in SAM.gov to be eligible for award.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Abstract of Offerors |
| ISSUING OFFICE: |
| Address |
| SOLICITATION NO.: | 12445525B0013 | ||||||||||
| PROJECT: | Huntington Ravine Trail Bridges Replacement | OFFEROR NO. 1 | OFFEROR NO. 2 | OFFEROR NO. 3 | OFFEROR NO. 4 | OFFEROR NO. 5 | OFFEROR NO. 6 | OFFEROR NO. 7 | |||
| Vendor Name: | Kovilic Construction Co | Rays Electric and General Contracting | J.P. Sicard Inc. | ||||||||
| Vendor City/State: | |||||||||||
| Amendments Acknowledged: | |||||||||||
| Acceptance Time: | |||||||||||
| SAM eUID | |||||||||||
| Business Size: | |||||||||||
| Bid Guarantee: | Yes | Yes | Yes | ||||||||
| Government Estimate | OFFEROR NO. 1 PRICE | OFFEROR NO. 2 PRICE | OFFEROR NO. 3 PRICE | OFFEROR NO. 4 PRICE | OFFEROR NO. 5 PRICE | OFFEROR NO. 6 PRICE | OFFEROR NO. 7 PRICE | ||||
| ITEM | |||||||||||
| NO. | DESCRIPTION | EST. | |||||||||
| QTY. | UNIT |
OF
| MEASURE | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
AMOUNT
| 1 | Mobilization | 1 | LS | $152,700.00 | $152,700.00 | $20,000.00 | $20,000.00 | $1,883,222.60 | $1,883,222.60 | $1,125,000.00 | $1,125,000.00 | $0.00 | $0.00 |
| 2 | Construction Survey and Staking, Method 1, Tolerance Class C | 1 | LS | $48,000.00 | $48,000.00 | $30,000.00 | $30,000.00 | $5,000.00 | $5,000.00 | $12,500.00 | $12,500.00 | $0.00 | $0.00 |
| 3 | Silt Sock | 218 | LF | $10.00 | $2,180.00 | $100.00 | $21,800.00 | $7.38 | $1,608.79 | $7.00 | $1,526.00 | $0.00 | $0.00 |
| 4 | Earth Berms | 30 | FT | $335.00 | $10,050.00 | $500.00 | $15,000.00 | $105.73 | $3,171.80 | $23.00 | $690.00 | $0.00 | $0.00 |
| 5 | Clearing and Grubbing, Disposal Method A Removal of Old Structure, Portions, Disposal | 1 | LS | $1,000.00 | $1,000.00 | $25,000.00 | $25,000.00 | $27,900.00 | $27,900.00 | $187,011.00 | $187,011.00 | $0.00 | $0.00 |
| 6 | Method A | 1 | LS | $120,000.00 | $120,000.00 | $25,000.00 | $25,000.00 | $1,470.00 | $1,470.00 | $1,418,000.00 | $1,418,000.00 | $0.00 | $0.00 |
| 7 | Trail Excavation, Compaction Method B | 4 | CY | $400.00 | $1,600.00 | $500.00 | $2,000.00 | $1,125.00 | $4,500.00 | $222.00 | $888.00 | $0.00 | $0.00 |
| 8 | Structure Excavation | 233 | CY | $400.00 | $93,200.00 | $500.00 | $89,000.00 | $25.28 | $4,500.00 | $20.00 | $3,560.00 | $0.00 | $0.00 |
| 9 | Structural Backfill | 35 | CY | $500.00 | $17,500.00 | $500.00 | $12,000.00 | $125.00 | $3,000.00 | $61.00 | $1,464.00 | $0.00 | $0.00 |
| 10 | Salvage Backfill, Compaction Method 7 | 75 | CY | $350.00 | $26,250.00 | $500.00 | $33,500.00 | $44.78 | $3,000.00 | $27.00 | $1,809.00 | $0.00 | $0.00 |
| 11 | Riprap, Class VI, Machine Placed | 155 | CY | $1,000.00 | $155,000.00 | $1,000.00 | $155,000.00 | $165.63 | $25,672.24 | $123.00 | $19,065.00 | $0.00 | $0.00 |
| 12 | Geotextile, Type III, Class I | 160 | SY | $20.00 | $3,200.00 | $25.00 | $4,000.00 | $1.68 | $268.80 | $6.00 | $960.00 | $0.00 | $0.00 |
| 13 | Aggregate Base, Grading D, Compaction Method B Structural Steel, Galv, Furnished, Fabricated | 22 | CY | $800.00 | $17,600.00 | $1,000.00 | $22,000.00 | $83.45 | $1,835.90 | $79.00 | $1,738.00 | $0.00 | $0.00 |
| 14 | Erected | 16013 | LBS | $35.00 | $560,455.00 | $25.00 | $400,325.00 | $23.08 | $369,561.40 | $59.00 | $944,767.00 | $0.00 | $0.00 |
| 15 | Substructure Steel, Salvaged, Modified, and Erected | 15238 | LBS | $10.00 | $152,380.00 | $60.00 | $914,280.00 | $17.78 | $271,000.00 | $8.00 | $121,904.00 | $0.00 | $0.00 |
| 16 | Treated Structural Timber | 1 | LS | $123,200.00 | $123,200.00 | $700,000.00 | $700,000.00 | $233,696.20 | $233,696.20 | $625,734.00 | $625,734.00 | ||
| 17 | Underdrain System, 6 Inch | 120 | LF | $28.00 | $3,360.00 | $100.00 | $12,000.00 | $54.63 | $6,555.43 | $14.00 | $1,680.00 | ||
| 18 | Placing Conserved Topsoil, 3 Inch | 39 | SY | $15.00 | $585.00 | $100.00 | $3,100.00 | $16.13 | $500.00 | $152.00 | $4,712.00 | ||
| 19 | Seeding, Hydraulic or Dry Method | 1 | LS | $6,000.00 | $6,000.00 | $20,000.00 | $20,000.00 | $1,955.80 | $1,955.80 | $2,062.00 | $2,062.00 | ||
| 20 | Mulching, Hydraulic or Dry Method Rolled Erosion Control Product, Type 2.D | 1 | LS | $2,000.00 | $2,000.00 | $20,000.00 | $20,000.00 | $424.20 | $424.20 | $2,059.00 | $2,059.00 | ||
| 21 | Natural Netting | 31 | SY | $15.00 | $585.00 | $100.00 | $3,100.00 | $36.87 | $1,143.08 | $35.00 | $1,085.00 | ||
| 22 | Signs, Type III Sheeting | 21 | SF | $35.00 | $735.00 | $100.00 | $2,100.00 | $221.19 | $4,645.03 | $307.00 | $6,447.00 | ||
| 23 | Post, Steel 3 lb | 120 | LF | $50.00 | $6,000.00 | $100.00 | $12,000.00 | $6.57 | $788.76 | $12.00 | $1,440.00 | ||
| 24 | Reflectivity | 20 | EA | $370.00 | $7,400.00 | $100.00 | $2,000.00 | $146.50 | $2,930.00 | $19.00 | $380.00 | ||
| 25 | Temporary Trail Closure | 1 | LS | $30,000.00 | $30,000.00 | $50,000.00 | $50,000.00 | $8,450.00 | $8,450.00 | $114,258.00 | $114,258.00 | ||
| TOTAL PRICE | $1,540,980.00 | $2,773,205.00 | $2,866,800.02 | $4,627,739.00 | $0.00 | ||||||||
| I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. | |||||||||||||
| Signature: | No Bid Guarantee, Past Performance or Technical Approach information provided. | ||||||||||||
| Date: |
File details come from the government source that posted it. Updated .