110-114 - Huntington Ravine Trail Bridge Schedule of Items.pdf

PDF 599 KB Posted

Attached to
Huntington Ravine Winter Access Trail Replacement
Solicitation number
12445525B0013
Issued by

About this file

This document is a Schedule of Items (Section B - Services and Prices) for bridge replacement project in the Androscoggin Ranger District of White Mountain National Forest, located in Coos County, New Hampshire. The project involves replacing five bridges at Huntington Ravine and includes numerous construction activities such as mobilization, survey and staking, excavation, structural steel work, backfilling, riprap placement, geotextile installation, and environmental restoration tasks. The contract uses the Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition, and includes 24 line items with estimated quantities for various construction materials and activities, ranging from structural steel (16,013 pounds) to earth berms (30 feet), with most items priced on a per-unit or lump sum basis. Key notes indicate that optional bid items will be awarded based on available funds, and all miscellaneous items not specifically listed are considered incidental to the contract.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

Huntington Ravine #1-#5

Bridge Replacements

Androscoggin Ranger District White Mountain National Forest

Coos County, New Hampshire

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization

Lump Sum 1

15201 Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________

15702 Silt Sock

Linear Foot 218

15705 Earth Berms Foot 30

20102 Clearing and Grubbing, Disposal Method A

20304 Removal of Old Structure, Portions, Disposal Method A

20401 Trail Excavation, Compaction Method B

Cubic Yard 4

20801 Structure Excavation

Cubic Yard 233

20803 Structural Backfill Cubic Yard 35 $________ $________

20803.1 Salvage Backfill, Compaction Method 7 Cubic Yard 75 $________ $________

25101 Riprap, Class VI, Machine Placed

Cubic Yard 155

25116 Geotextile, Type III, Class I Square Yard 160 $________ $________

30103 Aggregate Base, Grading D, Compaction Method B Cubic Yard 22

55501 Structural Steel, Galv, Furnished, Fabricated and Erected Pounds 16013 $________ $________

55501.1 Substructure Steel, Salvaged, Modified, and Erected Pounds 15238 $________ $________

55704 Treated Structural Timber Lump Sum 1 $________ $________

60501 Underdrain System, 6 Inch Linear Foot 120 $________ $________

62403 Placing Conserved Topsoil, 3 Inch Square Yard 39 $________ $________

62503 Seeding, Hydraulic or Dry Method Lump Sum 1 $________ $________

62509 Mulching, Hydraulic or Dry Method Lump Sum 1 $________ $________

62901 Rolled Erosion Control Product, Type 2.D With Natural Netting Square Yard 39 $________ $________

63301 Signs, Type III Sheeting Square foot 21 $________ $________

63306 Post, Steel 3 lb Linear Foot 120 $________ $________

63307 Object markers, Carsonite, High Intensity Reflectivity Each 20

63501 Temporary Trail Closure

Total:

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.

3. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

4. Quantities for aggregate are compacted in place volumes.

File details come from the government source that posted it. Updated .