Huntington Ravine Trail Bridge Plans.pdf
PDF 3 MB Posted
- Solicitation number
- 12445525B0013
- Issued by
-
Department of Agriculture Forest Service
About this file
These are 95% design plans for the Huntington Ravine Trail Bridge #1 Replacement project, prepared for the United States Department of Agriculture Forest Service's Eastern Region, specifically the White Mountain National Forest's Androscoggin Ranger District in Coos County, New Hampshire. The project involves replacing an existing bridge located at mile point 0.120 on the Huntington Ravine Trail, with a new 41-foot steel girder bridge featuring a 24-foot main span and 17-foot approach span, constructed with a timber dowel-laminated deck on steel grade beam foundations. The bridge will be situated near the Appalachian National Scenic Trail, with GPS coordinates of latitude 44.2650 and longitude -71.2792. The design includes detailed specifications for structural steel, timber components, foundations, deck panels, and connection details, with a focus on using salvaged steel from the existing structure and implementing erosion control measures during construction.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
PROJECT SITE
PROJECT LOCATION:
SHEET OF
United States Department of Agriculture Forest Service
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 TITLE SHEET 5/16/2025
C-02 DESIGN DATA & GENERAL NOTES 5/16/2025
C-03 QUANTITIES & MISCELLANEOUS DETAILS 5/16/2025
C-04 TEMPORARY TRAIL CLOSURE 5/16/2025
C-05 TYPICAL SECTIONS 5/16/2025
C-06 PLAN OF SITE 5/16/2025
C-07 PROFILE OF SITE 5/16/2025
C-08 PLAN OF STRUCTURE 5/16/2025
C-09 ABUTMENT PLAN 5/16/2025
C-10 STRUCTURE DETAILS 5/16/2025
FROM THE NH-16 / HUNTINGTON RAVINE TRAILHEAD INTERSECTION
OF PICKHAM'S GRANT, NEW HAMPSHIRE HEAD NORTHWEST ON
APPALACHIAN NATIONAL SCENIC TRAIL FOR 200 FEET, THEN
CONTINUE STRAIGHT ONTO TUCKERMAN RAVINE TRAIL. CONTINUE
ON TUCKERMAN RAVINE TRAIL FOR 1.6 MILES, THEN TURN RIGHT
ONTO HUNTINGTON RAVINE TRAIL. CONTINUE ON HUNTINGTON
RAVINE TRAIL FOR 0.1 MILES TO THE BRIDGE LOCATION.
5/1 5/2
5 1 6:
JA
LL
EN
Z :\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G;
EASTERN REGION
WHITE MOUNTAIN NATIONAL FOREST - ANDROSCOGGIN RANGER DISTRICT
COOS COUNTY
NEW HAMPSHIRE
HUNTINGTON RAVINE TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
STRUCTURE NUMBER: 092202-31393-0.1200 (LAT 44.2650, LONG -71.2792)
PROPOSED STRUCTURE DESCRIPTION:
41 FOOT (OVERALL LENGTH) 24 FOOT MAIN SPAN AND 17 FOOT
APPROACH SPAN STEEL GIRDER BRIDGE WITH A TIMBER
DOWEL-LAM DECK ON STEEL GRADE BEAM FOUNDATIONS.
95% PLANS
RECOMMENDED BY:
FOREST ENGINEER
DISTRICT RANGER
DATE
APPROVED:
R9 DIRECTOR OF ENGINEERING DATE
DATE
FOREST SUPERVISOR DATE
R9 BRIDGE PROGRAM MANAGER DATE
PROJECT
LOCATION
TO GORHAM
TUCKERMAN RAVINE TRAIL
HUNTINGTON RAVINE TRAIL
BOOTT SPUR TRAIL
APPALACHIAN
NATIONAL
SCENIC TRAIL
APPALACHIAN
NATIONAL
SCENIC TRAIL
NH-16
AutoCAD SHX Text
U.P. ENGINEERS & ARCHITECTS, INC.
AutoCAD SHX Text
ENGINEERING ARCHITECTURE PLANNING SURVEYING ENVIRONMENTAL
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
DESIGN DATA &
GENERAL NOTES
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-02
10 2
GENERAL NOTES:
EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS OR IN THE SUPPLEMENTAL SPECIFICATIONS, ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE FHWA STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14.
THE PROPOSED IMPROVEMENTS COVERED BY THESE PLANS ARE IN ACCORDANCE WITH:
AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 10TH EDITION, 2024
AASHTO GUIDELINES FOR GEOMETRIC DESIGN OF LOW-VOLUME ROADS, 2ND EDITION, 2019
FSH 7709.56b TRANSPORTATION STRUCTURES HANDBOOK (USDA FOREST SERVICE)
THE EXISTING STRUCTURE SHALL BE CHECKED AT THE TIME OF STARTING CONSTRUCTION TO SEE THAT ITS RELATIONSHIP TO THE PROPOSED WORK IS AS SHOWN ON THESE PLANS AND ANY DIFFERENCES REQUIRING CHANGES IN THE NEW WORK SHALL BE REPORTED TO THE PROJECT ENGINEER.
THE WORK COVERED BY THESE PLANS INCLUDES REMOVAL OF THE ENTIRE EXISTING BRIDGE (SALVAGING AS SPECIFIED HEREIN), INSTALLATION OF THE NEW BRIDGE AS SHOWN HEREIN. CONSTRUCTION OF THE APPROACHES TO THE LIMITS SHOWN, PLACING RIPRAP, AND SLOPE RESTORATION.
THE TRAIL WILL BE CLOSED AND A DETOUR IS NOT POSSIBLE.
THE STATIONING AS SHOWN ON THESE PLANS FOR REFERENCE POINTS ARE BELIEVED TO BE CORRECT. IT SHALL, HOWEVER, BE CHECKED AT THE TIME OF STARTING CONSTRUCTION, AND IF THE STATIONING SHOWN ON THE PLANS IS INCORRECT, IT SHALL BE REPORTED TO THE ENGINEER.
THE CONTRACTOR SHALL COORDINATE ALL OF THEIR WORK AND ANY UTILITY COMPANIES RELOCATION WORK AT NO ADDITIONAL COST TO THE
PROJECT.
FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH PUBLIC ACT 174, THE CONTRACTOR SHALL DIAL "811" A MINIMUM OF THREE FULL WORKING DAYS, EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE PUBLIC UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED. MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING UTILITY OWNERS WHO MAY NOT BE A PART OF THE "DIG SAFE" ALERT SYSTEM.
IN LIEU OF A GEOTECHNICAL INVESTIGATION, THE FOUNDATIONS WERE DESIGNED WITH AN ASSUMED ALLOWABLE BEARING PRESSURE OF 2,000 PSF.
THE CONTRACTOR SHALL VERIFY SOILS PRIOR TO CONSTRUCTION OF ABUTMENTS BY HAND DIGGING. IF ORGANIC, SOFT OR OTHERWISE UNSUITABLE SOILS ARE ENCOUNTERED, HE SHALL CONTACT THE FOREST SERVICE CONTRACTING OFFICER REPRESENTATIVE FOR FURTHER INSTRUCTION.
WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXPECTED WATER LEVELS DURING CONSTRUCTION.
NO MATERIAL SHALL BE ALLOWED TO ERODE INTO THE WATER COURSE, NOR SHALL MATERIAL BE PLACED INTO THE WATER COURSE EXCEPT AS
SHOWN ON THESE PLANS.
ALL EQUIPMENT SHALL BE CLEANED ACCORDING TO THE SPECIFICATIONS PRIOR TO USE ON THIS PROJECT. CONTRACTOR SHALL MAKE EQUIPMENT
AVAILABLE FOR INSPECTION PRIOR TO MOBILIZATION ONTO FS LANDS.
THE CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE FOREST SERVICE CONTRACTING OFFICER REPRESENTATIVE IF HERITAGE
RESOURCES OR HUMAN REMAINS ARE ENCOUNTERED.
NO WORK SHALL BE PERFORMED ON FEDERAL HOLIDAYS OR WEEKENDS WITHOUT PRIOR APPROVAL FROM THE FOREST SERVICE CONTRACTING
OFFICER REPRESENTATIVE.
THE CONTRACTOR SHALL PERFORM ALL IN-STREAM WORK BETWEEN JUNE 1ST THROUGH SEPTEMBER 15TH.
TREES SHALL BE CUT BETWEEN NOVEMBER 15TH AND MARCH 31ST.
SPECIFICATIONS:
ALL GRADING COMBINATIONS, AND SIZE REFER TO DOUGLAS FIR UNLESS SHOWN OTHERWISE ON THE PLANS. THE DESIGN VALUES FOLLOW LRFD BRIDGE DESIGN SPECIFICATIONS. THESE ARE THE MINIMUM REQUIREMENTS. OTHER SPECIES MAY BE USED WITH APPROVAL FROM THE FOREST SERVICE CONTRACTING OFFICER REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
GRADING:
ALL DOUGLAS FIR-LARCH TO BE GRADED PER WCLIB STANDARD GRADING RULES. SOUTHERN PINE TO BE GRADED PER SPIB.
STEEL BEAMS AND DIAPHRAGMS SHALL BE AASHTO M270 GRADE 50 (GALVANIZED STEEL).
MATERIAL & TREATMENT:
TIMBER PRESERVATION TREATMENT SHALL BE IN ACCORDANCE WITH CURRENT STATE AND/ OR AASHTO SPECIFICATIONS. ALL TIMBER SHALL BE
TREATED WITH COPPER NAPHTHENATE HYDROCARBON SOLVENT A, PER AWPA, UC4B (MINIMUM).
REFERENCE DESIGN VALUES SHOWN ARE PER AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 10TH EDITION, 2024 (U.N.O.)
DECK PLANK TO BE 4" DOUGLAS FIR-LARCH, NO.1 & BETTER (> 2 INCH WIDE) S2S1E. REFERENCE DESIGN VALUES (KSI): Fbo = 1.20, Fvo = 0.18, Eo = 1,800
CURB BLOCK TO BE DOUGLAS FIR-LARCH, DENSE SELECT STRUCTURAL (POSTS AND TIMBERS). REFERENCE DESIGN VALUES (KSI): Fbo = 1.75, Fvo = 0.17, Eo = 1,700
CURB RAIL TO BE DOUGLAS FIR, COMB. SYMBOL 24F-V8, DF/DF. REFERENCE DESIGN VALUES (KSI): Fbxo = 2.40, Fbyo = 1.55, Fvxo = 0.265, Fvyo = 0.23, Exo = 1,800, Eyo = 1,600
MISCELLANEOUS:
ALL TIMBER TO BE CUT EXACT LENGTH, DRESSED TO SIZE REQUIRED AND ALL PRACTICAL FRAMING TO BE DONE PRIOR TO TREATMENT.
ALL DECK PLANKS SHALL BE PREDRILLED PRIOR TO TREATMENT.
ALL PLANK FOR DECK PANELS SHALL BE PRECISION END TRIMMED TO LENGTH WITH 1/4" UNDERLENGTH & NO OVERLENGTH TOLERANCE
PERMITTED.
DECK PANELS SHALL BE ASSEMBLED WITH 3/8" DIAMETER RING SHANK DOWELS. ALL DOWELS ARE TO BE SIMULTANEOUSLY DRIVEN WITH EQUAL FORCE USING A MECHANICAL PRESS. ENSURING ALL HEADS ARE FLUSH WITH THE SURFACE OF THE TIMBER PLANK. MULTIPLE IMPACT TOOLS ARE
NOT TO BE USED TO SET DOWELS BECAUSE OF POTENTIAL FOR WOOD FIBER RUPTURE.
DECK PANELS WILL BE DELIVERED TO JOBSITE AFTER BEING FULLY ASSEMBLED TO FABRICATION PLANT.
ALL HARDWARE FOR TIMBER CONNECTIONS TO MEET ASTM A307-97 GALVANIZED TO F2329 (A153). ALL HIGH STRENGTH HARDWARE FOR DIAPHRAGM CONNECTIONS TO MEET ASTM F3125 GRADE A325 TYPE 3 OR GRADE A449 GALVANIZED TO A153.
ALL BOLTED STEEL CONNECTIONS SHALL BE MADE WITH A325 TYPE III BOLTS.
IF GALVANIZED FASTENERS ARE CUT OR DAMAGED IN THE FIELD, THEY SHALL BE REPLACED OR TOUCHED UP WITH COLD GALVANIZING COMPOUND AT THE DISCRETION OF THE FOREST SERVICE CONTRACTING OFFICER REPRESENTATIVE.
CONSTRUCTION NOTES:
TIMBER DECK PANELS ARE MARKED IN THE SHOP FOR USE IN FIELD PLACEMENT OF THE PANELS ON THE GIRDERS, e.g. A1, B1, C1 FOR SPAN 1.
PLACE PANELS AS SHOWN ON SHOP DRAWINGS.
ALL HOLES DRILLED IN THE FIELD WHERE SPIKES ARE USED ARE TO BE 1/16" SMALL THAN THE SPIKE SIZE.
ALL HOLES DRILLED FOR BOLTS ARE TO BE 1/16" LARGER THAN BOLT SIZE.
HOLES DRILLED FOR 3/4" LAG BOLTS ARE TO BE 9/16" IN DIAMETER FOR THE THREADED PORTION OF THE BOLT AND 13/16" FOR THE SHANK.
ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH TIMBER TO HAVE ON PLATE WASHER BETWEEN NUT & TIMBER, AND BOLT HEAD &
TIMBER.
ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH STEEL TO HAVE ONE CUT WASHER BETWEEN NUT & STEEL, OR BOLT HEAD & STEEL.
SET THREADS ON ALL BOLTS AT NUT WITH A CENTER PUNCH AFTER TIGHTENING.
ALL TIMBER CUT OR DRILLED IN THE FIELD SHALL BE TREATED WITH COPPER NAPHTHENATE.
ALTHOUGH ALL PRACTICAL PRE-FRAMING WILL BE DONE PRIOR TO TREATING, SOME CUTTING & DRILLING WILL BE REQUIRED IN THE FIELD.
IF GALVANIZED FASTENERS ARE CUT OR DAMAGED IN THE FIELD, THEY SHALL BE REPLACED OR TOUCHED UP WITH COLD GALVANIZING COMPOUND AT THE DISCRETION OF THE FOREST SERVICE CONTRACTING OFFICER REPRESENTATIVE.
THE STEEL SUPERSTRUCTURE FROM THE OLD BRIDGE SHALL BE RE-USED FOR THE FOUNDATION OF THE NEW BRIDGE. THIS WORK SHALL BE PAID
FOR AS SUBSTRUCTURE STEEL, SALVAGED, MODIFIED, AND ERECTED.
HYDRAULIC DATA:
100 YEAR FREQUENCY
DRAINAGE AREA...............................................................................................................................................0.35 SQ MI
Q100...................................................................................................................................................................780.00 CFS
VELOCITY THRU STRUCTURE..........................................................................................................................10.98 FPS
BRIDGE OPEN AREA THRU STRUCTURE....................................................................................................76.11 SQ FT
FLOW AREA THRU STRUCTURE...................................................................................................................71.04 SQ FT
HIGH WATER ELEVATION................................................................................................................................3478.77 FT
SCOUR CRITICAL CODE
DESIGN DATA:
LOAD RATING (RATING FACTORS):
H-10 (CONCURRENT WITH SNOW LOAD)
INVENTORY RATING (STRENGTH 1, FLEXURE, MAIN SPAN).................................................................................1.16
OPERATING RATING (STRENGTH 1, FLEXURE, MAIN SPAN).................................................................................1.50
NOTE: LIVE LOAD DEFLECTION DOES NOT EXCEED 1/800 OF THE SPAN LENGTH.
DEAD LOAD:
THE DESIGN UNIT WEIGHT FOR ALL TIMBERS...................................................................................................50 PCF
THE BRIDGE RAILING LOAD...............................................................................................................39 PLF (PER SIDE)
SNOW LOAD...........................................................................................................................................................105 PSF
MATERIAL & FABRICATION NOTES:
SHOP DRAWINGS:
THE FABRICATOR SHALL BE RESPONSIBLE FOR THE PREPARATION OF SHOP DRAWINGS FOR THE TIMBER DECK, TIMBER RAILING, STEEL
BEAMS, AND STEEL DIAPHRAGMS IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
QUANTITIES
& MISCELLANEOUS
DETAILS
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-03
10 3
ABBREVIATIONS (PLAN):
LPSM - LUMP SUM
LNFT - LINEAR FEET
CUYD - CUBIC YARD
SQYD - SQUARE YARD
EA - EACH
LBS - POUNDS
EX - EXISTING
PROP - PROPOSED
NTS - NOT TO SCALE
TYP - TYPICAL
CL - CENTER LINE
CIP - COMPACTED IN PLACE
P.O.B. - POINT OF BEGINNING
P.O.E. - POINT OF ENDING
REF PT - REFERENCE POINT
OHWM - ORDINARY HIGH WATER MARK
OBS WSE - OBSERVED WATER SURFACE ELEVATION
Q100 WSE - 100 YEAR FLOOD WATER SURFACE ELEVATION
F.F. - FRONT FACE
B.F. - BACK FACE
SPA - SPACES
ABUT - ABUTMENT
PL - PLATE
GALV - GALVANIZED
U.N.O. - UNLESS NOTED OTHERWISE
MOBILIZATION15101 LPSM 1
ITEM NO. DESCRIPTION UNITS QUANTITY
CONSTRUCTION SURVEY AND STAKING, METHOD 1, TOLERANCE CLASS C15201 LPSM
SILT SOCK15702 LNFT
REMOVAL OF OLD STRUCTURE, PORTIONS, DISPOSAL METHOD A20304 LPSM
AGGREGATE BASE, GRADING D, COMPACTION METHOD B30103 CUYD
SEEDING, DRY METHOD62503 LPSM
TEMPORARY TRAIL CLOSURE63501 LPSM
TRAIL EXCAVATION, COMPACTION METHOD B20401 CUYD 4
CLEARING AND GRUBBING, DISPOSAL METHOD A20102 LPSM 1
STRUCTURE EXCAVATION20801 CUYD 120
STRUCTURAL BACKFILL20803 CUYD 35
OBJECT MARKERS, CARSONITE, HIGH INTENSITY REFLECTIVITY 63307 EACH 4
PLACING CONSERVED TOPSOIL, 3-INCH62403 SQYD 39
POST, STEEL, 3 LB63306 LNFT 20
62901 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D WITH NATURAL NETTING SQYD 39
TREATED STRUCTURAL TIMBER55704 LPSM 1
SUMMARY OF PROJECT QUANTITIES
RIPRAP, CLASS VI, MACHINE PLACED25101 CUYD 75
SIGNS, TYPE III SHEETING63301 SQFT 3
GEOTEXTILE, TYPE III, CLASS I 25116 SQYD 160
OBJECT MARKER
SCALE: NTS
2'-2"
8"
2'-6"
2'-2"
6'-0"
2'-0"
BEGIN/END
STRUCTURE
TOP OF ROAD
TOP OF
STRUCTURE/
GRND
CARSONITEINSIDE EDGE OF
BRIDGE RAIL OR
TRAVEL WAY
1'-4"
OBJECT MARKERS, CARSONITE,
HIGH INTENSITY REFLECTIVITY
MULCHING, DRY METHOD62509 LPSM 1
STRUCTURAL STEEL, GALV, FURNISHED, FABRICATED AND ERECTED55501 LBS 5987
SUBSTRUCTURE STEEL, SALVAGED, MODIFIED, AND ERECTED55501.1 LBS 4216
WEIGHT
LIMIT
TONS
STEEL POST SIGN DETAIL
SCALE: NTS
42" (MIN.)
6'-6"
(MAX.)
5'-3"
POST, STEEL, 3 LB
(10 FEET)
R12-1 SIGN
EXISTING GROUND
1'-3"
1'-0"
SIGNS, TYPE III SHEETING
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
TRAFFIC CONTROL PLAN - TRAIL CLOSURE
PROJECT
LOCATION
(2) TYPE III BARRICADES,
LIGHTED AT EACH END
OF WORK ZONE
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
TEMPORARY
TRAIL CLOSURE
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-04
10 4
TRAFFIC CONTROL PLAN KEY
SIGN
TYPE III BARRICADE
MOUNTED
ON BARRICADE
W20-3
R11-2
W20-3
ALL SIGNS, EXCEPT THOSE MOUNTED ON TYPE III BARRICADES SHALL BE
MOUNTED ON DRIVEN POSTS AT A 7 FOOT BOTTOM HEIGHT.
DETOUR NOTES:
TRAIL WILL BE CLOSED AND DETOUR ROUTE IS NOT AVAILABLE FOR THE
PROJECT LOCATION.
TO GORHAM
TUCKERMAN RAVINE TRAIL
HUNTINGTON RAVINE TRAIL
BOOTT SPUR TRAIL
APPALACHIAN
NATIONAL
SCENIC TRAIL
NH-16
APPALACHIAN
NATIONAL
SCENIC TRAIL
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
TRAIL CLOSED
AutoCAD SHX Text
TRAIL CLOSED AHEAD
AutoCAD SHX Text
350 FEET
AutoCAD SHX Text
TRAIL CLOSED AHEAD
AutoCAD SHX Text
HUNTINGTON RAVINE TRAIL
HUNTINGTON RAVINE TRAIL
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
TYPICAL SECTIONS
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-05
10 5
SCALE: NTS
PROPOSED BRIDGE SECTION
14.416' DECK O-O
6.0' 6.0'
12.0' CLEAR ROADWAY
PLAN GRADE
FLATFLAT
W16x36 (TYP.)
3.16' 3.16' 3.16'
SCALE: NTS
EXISTING TYPICAL SECTION (STA 9+50 - STA 9+84)
VARIES
EX BASE - UNKNOWN (VAR.)
VARIES
(VAR.)
SCALE: NTS
PROPOSED TYPICAL SECTION (STA 9+50 - STA 9+72)
6.0'
12.0'
AGGREGATE BASE,
GRADING D, COMPACTION
METHOD B
(6")
EXISTING
GROUND
PLACING CONSERVED TOPSOIL, 3-INCH
(TYP)
2.0%2.0%
SEEDING, HYDRAULIC OR DRY METHOD
MULCHING, HYDRAULIC OR DRY METHOD
ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
(TYP)
TRAIL EXCAVATION,
COMPACTION METHOD B
(AS REQUIRED)
PLAN GRADE
6.0'
1:3
2.0'
1.0'
STRUCTURE
BACKFILL CLEARING AND GRUBBING,
DISPOSAL METHOD A
(ONLY MINIMUM AS REQUIRED
FOR CONSTRUCTION, TYP.)
1:2
13.60' PAY LIMITS OF AGGREGATE BASE,
GRADING D, COMPACTION METHOD B
9.0'-14.0' (VAR.)
EX GRADE
(STA 10+16 - STA 10+33)
(STA 10+13 - STA 10+33)
SCALE: NTS
PROPOSED APPROACH BRIDGE SECTION
14.416' DECK O-O
6.0' 6.0'
12.0' CLEAR ROADWAY
PLAN GRADE
FLATFLAT
W14x26 (TYP.)
3.16' 3.16' 3.16'
SCALE: NTS
EXISTING BRIDGE SECTION
10.0' DECK O-O
5.0' 5.0'
EXISTING
GRADE
FLATFLAT
3" THICK TRANSVERSE
PLANK DECK
EXISTING W16x26
(TYP.)3.0' 3.0' 3.0'
1:3
REMOVE OF OLD STRUCTURE
PORTIONS, DISPOSAL METHOD A
SUBSTRUCTURE STEEL,
SALVAGE, MODIFIED, AND
ERECTED
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text
BM1
BM2
CP CHK FROM NEW BASE
BM3
9+00
10+00
11+00
PC
: 8
+5 8.
PC: 9+37.33
PC
: 1
0+
.7
PT
: 8
+5 5.
PT: 8+70.89
PT
: 9
+7 2.
PT: 11+08.45
N23° 3 3' 51"W
66.44'
N16° 21' 29"E 81.55'
N15° 00' 00"W
45.32'
PC STA = 9+37.33
N = 643510.9409 E = 1085752.9684
PI STA = 9+55.49
N = 643527.5867 E = 1085745.7084
PT STA = 9+72.17
N = 643545.0117 E = 1085750.8230
= 39.92 R = 50.00' T = 18.16' L = 34.84'
PC STA = 10+53.72
N = 643623.2565 E = 1085773.7895
PI STA = 10+81.79
N = 643650.1895 E = 1085781.6949
PT STA = 11+08.45
N = 643677.3023 E = 1085774.4300
= 31.36 R = 100.00' T = 28.07' L = 54.73'
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
HUNTINGTON RAVINE
TRAIL @ MP 0.120
PLAN OF SITE
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-06
10 6
GENERAL NOTES:
1. COORDINATE SYSTEM REFERS TO NAD83 NEW HAMPSHIRE STATE
PLANES, US FOOT. DATUM REFERS TO NAVD88.
2. REFERENCE POINTS "A" AND "B" REFER TO FINISH GRADE AT
CENTERLINE AT THE ENDS OF THE PROPOSED BRIDGE BEAMS.
3. PROVIDE SMOOTH TRANSITION FROM EXISTING TO PROPOSED
TRAIL AT THE ENDS OF THE BRIDGE APPROACHES. FADE OR
EXTEND PROFILE SLIGHTLY AS REQUIRED.
4. SURVEY WAS COMPLETED BY HORIZONS ENGINEERING FOR THIS
PROJECT BETWEEN OCTOBER AND DECEMBER 2024.
DESCRIPTION
HORIZONTAL AND VERTICAL CONTROL
LOCATION
STA / OFFSET NORTHING EASTING ELEVATIONPOINT
BM3
LEGEND
BENCHMARK
TREE LINE
EDGE OF GRAVEL
RIGHT OF WAY (R.O.W.)
PROPOSED EXISTING
SILT SOCK
RIPRAP
BM2
BM1 9+34.60, 5.1' LT 1085749.3983643506.4010 3476.74 8" BIRCH
GENERAL PLAN OF SITE
PROPOSED
SLOPE STAKE LINE
(TYP)
P.O.E.
REF PT "D"
EXISTING BRIDGE AND
APPROACHES TO BE REMOVED
P.O.B.
REF PT "C"
REF
PT "A"
REF
PT "B"
SILT SOCK
(TYP)
HUNTINGTON
RAVINE TRAIL
CONSTRUCTION
9+70.88, 12.8' LT
10+18.70, 18.4' RT
AGGREGATE BASE
REFERENCE POINTS
LOCATION
STATION NORTHING EASTING ELEVATIONPOINT
C D
B A
9+50.00
9+72.00 10+13.00
10+33.20
SOIL EROSION CONTROL REQUIREMENTS
SEEDING WITH MULCH
AND/ OR MATTING
FACILITATES ESTABLISHMENT OF VEGETATIVE COVER.
EFFECTIVE FOR DRAINAGEWAYS WITH LOW VELOCITY.
EASILY PLACED IN SMALL QUANTITIES BY INEXPERIENCED
PERSONNEL. SHOULD INCLUDE PREPARED TOPSOIL BED.
KEY DETAIL CHARACTERISTICS
RIPRAP USED WHERE VEGETATION IS NOT EASILY ESTABLISHED.
EFFECTIVE FOR HIGH VELOCITIES OR HIGH
CONCENTRATIONS. PERMITS RUNOFF TO INFILTRATE
SOIL. DISSIPATES ENERGY FLOW AT SYSTEM OUTLETS.
54 SILT SOCK FILTERS AND DETAINS RUNOFF.
3480.87 3478.10
PROPOSED 12' WIDE
AGGREGATE BASE, GRADING D,
COMPACTION METHOD B
(TYP)
CLEARING AND GRUBBING,
DISPOSAL METHOD A (TYP)
EXISTING EDGE GRAVEL
CLEARING AND GRUBBING,
DISPOSAL METHOD A
(TYP)
PROPERTY OWNER:
WHITE MOUNTAIN
NATIONAL FOREST
EXISTING EDGE GRAVEL
12'
EXISTING EDGE OF WATER
TR
IB
T O
C U
TL
ER
R
IV
ER
PROPOSED 12' WIDE
AGGREGATE BASE, GRADING D,
COMPACTION METHOD B
(TYP)
12" FIR
12" SPRUCE
PROPOSED
STRUCTURE
STA. 10+01
PROPERTY OWNER:
WHITE MOUNTAIN
NATIONAL FOREST
PROPERTY OWNER:
WHITE MOUNTAIN
NATIONAL FOREST
PROPERTY OWNER:
WHITE MOUNTAIN
NATIONAL FOREST
HUNTINGTON
RAVINE TRAIL
12'
EXISTING EDGE OF WATER
TR
IB
T O
C U
TL
ER
R
IV
ER
Feet 0 10 20
1085738.1149643547.0541 1085781.5355643584.4923
1085750.7738643544.8428 1085762.3219643584.1865 1085749.4214643523.0653 1085768.0108643603.5690
3479.43 3481.57
3477.73 3474.18
EXISTING ANCHOR
BOLT WITH CABLE
EXISTING ANCHOR
BOLT WITH CABLE
13 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text
.6
8+75
.0
9+00
.5
.1
.1
9+50
.8
.5
.7
.6
10+00
.4
.4
.5
10+50
.5
.8
11+00
PVI STA: 9+56.22
PVI ELEV: 3474.92
G.C.: 21.33% K: 0.58
LVC: 12.43
BV
C
S:
+5 0.
BV
C E:
4.
EV
C
S:
+6 2.
EV
C E:
7.
LOW PT STA: 9+50.00
LOW PT ELEV: 3474.18
PVI STA: 10+30.30
PVI ELEV: 3478.08
G.C.: 13.00% K: 0.44
LVC: 5.78
BV
C
S:
0+
.4
BV
C
E:
8.
EV
C
S:
0+
.1
EV
C
E:
7.
LOW PT STA: 10+33.19
LOW PT ELEV: 3477.74
PVI STA: 9+68.11
PVI ELEV: 3478.89
G.C.: -19.32% K: 0.39
LVC: 7.62
BV
C
S:
+6 4.
BV
C E:
7.
EV
C
S:
+7 2.
EV
C E:
9.
HIGH PT STA: 9+72.00
HIGH PT ELEV: 3479.43
PVI STA: 10+16.47
PVI ELEV: 3481.54
G.C.: -24.00% K: 0.29
LVC: 6.84
BV
C
S:
0+
.0
BV
C
E:
1.
EV
C
S:
0+
.8
EV
C
E:
0.
HIGH PT STA: 10+13.00
HIGH PT ELEV: 3481.57
.00
-1.00%
.00
.3
3%
-25.00%
-12.00%
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
HUNTINGTON RAVINE
TRAIL @ MP 0.120
PROFILE OF SITE
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-07
10 7
GENERAL PROFILE
PROPOSED ROAD PROFILE AT CL
EXISTING ROAD PROFILE AT CL
Q100 WSE
= 3478.77'
OBS WSE = 3475.48'
REF PT "C"
P.O.B.
MATCH EXISTING
23.5'
CHANNEL
PROPOSED BRIDGE, CL STA 10+01:
41 FOOT (OVERALL LENGTH) 24 FOOT MAIN SPAN AND 17 FOOT
APPROACH SPAN STEEL GIRDER BRIDGE WITH A TIMBER
DOWEL-LAM DECK ON STEEL GRADE BEAM FOUNDATIONS.
PROP. LOW
CHORD
= 3479.77'
REF
PT "A"
REF PT "D"
P.O.E.
MATCH EXISTING
REF
PT "B"
EXISTING BRIDGE (TO BE REMOVED) CL STA 10+00.00:
23.9 FOOT (OVERALL LENGTH) x 10'-0" FOOT WIDE (O-O) STEEL
GIRDER BRIDGE WITH TIMBER APPROACHES ON STACKED
TIMBER SILLS.
3478.42
LIMITS OF
STRUCTURE
BACKFILL
LIMITS OF
STRUCTURE
BACKFILL
PROPOSED PROFILE @ CL
EXISTING PROFILE @ CL
3476.44
3478.66
Feet (Horizontal) 0 10 20
Feet (Vertical) 0 1 2
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
BM2
CP CHK FROM NEW BASE
BM3
10+00
PT
: 9
+7 2.
N16° 21' 29"E 81.55'
14.00%
-1.00%
12.00%
33.33%
-25.00%
-12.00%
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
HUNTINGTON RAVINE
TRAIL @ MP 0.120
PLAN OF STRUCTURE
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-08
10 8
PROPOSED
SLOPE STAKE LINE
(TYP)
SILT SOCK (TYP)
CLEARING AND GRUBBING,
DISPOSAL METHOD A (TYP)
EXISTING EDGE GRAVEL CLEARING AND GRUBBING,
DISPOSAL METHOD A
(TYP)
EXISTING EDGE GRAVEL
EXISTING EDGE OF WATER
TRIB TO CUTLER RIVER
HUNTINGTON
RAVINE TRAIL
TR
IB
T O
C U
TL
ER
R
IV
ER
CONSTRUCTION
AND SURVEY
CENTERLINE
EXISTING STRUCTURE
(TO BE REMOVED)
BRIDGE PLAN
BRIDGE ELEVATION
PROPOSED GRADE
EXISTING
GROUND
AT TOE
PER PLAN
RIPRAP, CLASS VI
RIPRAP DETAIL
SCALE: NTS
REF PT "B"
STA: 10+13
REF PT "A"
STA: 9+72
PROPOSED
RIPRAP,
CLASS VI
(TYP)
AGGREGATE BASE,
GRADING D,
COMPACTION METHOD B
(6")
3'-9"
3'-9"
PER PLAN
OBJECT MARKERS,
CARSONITE, HIGH
INTENSITY
REFLECTIVITY
3'-9" 1'-0"
NOTE: FOR RIPRAP ALONG SIDES OF CHANNEL,
EXCAVATE EXISTING SOILS DOWN TO PROPOSED
BOTTOM OF RIPRAP. RIPRAP DEPTH MAY BE
REDUCED IF BEDROCK IS ENCOUNTERED.
3'-9"
2'-0"
FLATREF PT "A"
REF PT "B"
LIMITS OF
STRUCTURE
BACKFILL
Q100 WSE = 3478.77'
OBS WSE = 3475.48'
STREAM BED
EL 3474.63' (+/-)
@ STA. 10+00
PROP. LOW
CHORD
= 3479.77'
3478.42
3476.44
3478.66
SCUPPER: 3 SPA @ 7'-4" = 22'-0"
1'
24'-0" BRIDGE CURB
1'
W16x36
12'-0"
CLEAR
14'-5"
DECK
O-O
PROPOSED
STRUCTURE
STA. 10+01
41'-0" (OVERALL BRIDGE LENGTH - REF. PT. A TO REF. PT. B)
24'-0" (OVERALL DECK LENGTH)17'-0" (OVERALL DECK LENGTH)
HUNTINGTON
RAVINE TRAIL
SCUPPER: 2 SPA @ 7'-6" = 15'-0"1'
17'-0" BRIDGE CURB
1'
OBJECT MARKERS,
CARSONITE, HIGH
INTENSITY REFLECTIVITY
OBJECT MARKERS,
CARSONITE, HIGH
INTENSITY
REFLECTIVITY
OBJECT MARKERS,
CARSONITE, HIGH
INTENSITY
REFLECTIVITY
90°
PROPOSED 12' WIDE
AGGREGATE BASE,
GRADING D, COMPACTION
METHOD B
(TYP)
RIPRAP, CLASS VI
(TYP. ALL QUADRANTS)
SILT SOCK (TYP)
5.0'
10.7' 5.8'
8.0'
10.0'
11.7'
6.6'
(TYP.)
16.5'
P.O.E.
REF PT "D"
P.O.B.
REF PT "C"
LIMITS OF
STRUCTURE
BACKFILL
Feet 0 4 8
W14x26
WEIGHT LIMITS
SIGN (R12-1)
(10 TON)
WEIGHT LIMITS
SIGN (R12-1)
(10 TON)
LIMITS OF:
STRUCTURE EXCAVATION LIMITS OF:
STRUCTURE EXCAVATION
REF PT "C"
P.O.E.
REF PT "D"
NOTE: APPROXIMATE LOW CHORD
OF EXISTING BRIDGE = 3477.43'
TR
IB
T O
C U
TL
ER
R
IV
ER
EXISTING FLOW CHANNEL
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
STA. 10+00
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
ABUTMENT PLAN
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-09
10 9
REF PT "B"
11'-101 2"
1'-21 4" 3'-2" 3'-2" 3'-01
2" 1'-21 4"
SCALE: NTS
SOUTH ABUTMENT PLAN
11'-101 2"
1'-21 4" 3'-2" 3'-2" 3'-2" 1'-21
4"
SCALE: NTS
PIER PLAN
1'-21 4" 3'-2" 3'-2" 3'-2" 1'-21
4"
11'-101 2"
1'-21 4" 3'-2" 3'-2" 3'-2" 1'-21
4"
SCALE: NTS
NORTH ABUTMENT PLAN
REF PT "A"
PROPOSED W14x26
EXISTING W16x26
EXISTING W16x26
EXISTING W16x26
PROPOSED W14x26
EXISTING W16x26
EXISTING W16x26
PROPOSED W16x36
STA. 9+89
A
A
B
B
C
C
SCALE: NTS
SOUTH ABUTMENT SECTION A-A
SCALE: NTS
PIER SECTION B-B
SCALE: NTS
NORTH ABUTMENT SECTION C-C
PROPOSED
W14x26
R
EF
. P T.
A
4"73
4"
EXISTING W16x26
(SUBSTRUCTURE STEEL,
SALVAGED, MODIFIED,
AND ERECTED)
PROPOSED
W14x26
PROPOSED
W16x36
4"73
4"
ST
A.
+8
R
EF
. P
T.
B
4"73
4"
PROPOSED
W16x36
(4) 3/4"Ø HOLES FOR 5/8"Ø
A325 BOLTS (TYP.) 11
4"
4"
1" 3"
1"
PROPOSED 1/2" STEEL
WEB STIFFENER (TYP.)
PROPOSED STEEL SOLE PLATE
PROPOSED STEEL SOLE PLATE
1"11 4"
1" 3"
1"
PROPOSED 1/2" STEEL
WEB STIFFENER (TYP.)
4"
3"
4"
PROPOSED 1/2" STEEL
WEB STIFFENER (TYP.)
1"
2"
5'-111 4"
5'-111 4"
EXISTING W16x26
EXISTING W16x26
(SUBSTRUCTURE STEEL,
SALVAGED, MODIFIED,
AND ERECTED)
SEE BACKER PLANK
CONNECTION ON
SHEET C-10
1/2" GAP (MIN.)
(4) 3/4"Ø HOLES FOR 5/8"Ø A325 BOLTS (TYP.)
EXISTING W16x26
(SUBSTRUCTURE STEEL,
SALVAGED, MODIFIED,
AND ERECTED)
SEE BACKER PLANK CONNECTION
ON SHEET C-10
1/4"
1/4" 1/4"
NOTE:
1. THE BEAMS SALVAGED FROM THE OLD
SUPERSTRUCTURE ARE TO BE CUT IN HALF AND
PLACED AS SHOWN FOR NEW FOUNDATIONS.
2. ANY REMAINING SALVAGED STEEL (NOT SHOWN) IS
TO BE TACK WELDED TO FOUNDATION STEEL AND
BURIED IN THE APPROACHES.
3. DO NOT BACKFILL THE FOUNDATIONS/STRUCTURE
UNTIL THE SUPERSTRUCTURE HAS BEEN PLACED
AND SECURED.
4"
PROPOSED 1/2" STEEL WEB STIFFENER
(NON-GALVANIZED)(INCLUDE WITH
SUBSTRUCTURE STEEL, SALVAGED,
MODIFIED, AND ERECTED)
1/4" 1/4"
1/4"
C L
BE
AR
IN
G
3"
PROPOSED 1/2" STEEL WEB STIFFENER
(NON-GALVANIZED)(INCLUDE WITH
SUBSTRUCTURE STEEL, SALVAGED,
MODIFIED, AND ERECTED)
1/4"
1/4"
PROPOSED 1/2" STEEL WEB STIFFENER
(NON-GALVANIZED)(INCLUDE WITH
SUBSTRUCTURE STEEL, SALVAGED,
MODIFIED, AND ERECTED)
C L
BE
AR
IN
G
(4) 3/4"Ø HOLES FOR 5/8"Ø
A325 BOLTS (TYP.)
1/4"TOP & BOT
4"
W14x26 CL
PIER
EXISTING W16x26
PROPOSED W16x36
EXISTING W16x26
EXISTING W16x26
4"
3"
4"
EXISTING W16x26
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
5/1 5/2
5 1 6:
JA
LL
EN
Z:
\U
-0
U
SD
A
FS
R 9 T
ST
-U
SF
S
BR
ID
GE
ID
IQ
F
Y2 4 D
ES
. 1
6-
BR
ID
GE
S\
DW
GS
\T
AS
K
0 -
H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E
#1 \11
0 - H
UN
TI
NG
TO
N
RA
VI
NE
T
RA
IL
B
RI
DG
E #1
.D W
G
EASTERN REGION
HUNTINGTON RAVINE
TRAIL BRIDGE #1
REPLACEMENT @ MP 0.120
WHITE MOUNTAIN
NATIONAL FOREST
ANDROSCOGGIN
RANGER DISTRICT
STRUCTURE DETAILS
5/16/2025
D.CARTER
J.ALLEN
G.JUNTTILA
U28-04493
C-10
10 10
4'-9"
4'-9"
A
A
4" DECK (NOM.)
SECTION AT SCUPPER
SCALE: NTS
SECTION A-A
SCALE: NTS
C L
RO
AD
W
AY
B
RI
DG
E
17' (NORMAL TO TOP FLANGE)
3'-2"
3'-2"
3'-2"
8'-2"
STRUCTURAL STEEL, GALV, FURNISHED,
FABRICATED, AND ERECTED (W14x26)
BOLTED CONNECTIONS
PER DIAPHRAGM
CONNECTION DETAIL (TYP.)
DIAPHRAGM CONNECTION
SCALE: NTS
C12x20.7 DIAPHRAGM
1/2"
SP
A.
C12 - OMIT AT FASCIA
13/16"Ø HOLES FOR 3/4"Ø
A325 BOLTS (TYP.)
SECTION B-B
SCALE: NTS
CENTERLINE OF
BEARING
3/4"Ø x 30" ASTM A307 GALV.
DM. HD. BOLTS WITH HEX
NUT AND (1) MALLEABLE
IRON WASHER EA.
(3) SPA.
@ 5"
4"
2"
2"
4" 4"
8"
4"
2"
2"
4" DECK (NOM.)
(2) 1"Ø x 14" ASTM A307 GALV.
DM. HD. BOLTS WITH HEX NUT
AND (1) MALLEABLE IRON
WASHER EA. (@ SPLICE)
3/4"Ø x 30" ASTM A307 GALV. DM. HD.
BOLTS WITH HEX NUT AND (1)
MALLEABLE IRON WASHER EA.
2"
1"
8"
4"x123
8"
GLU-LAM CURB
C12x20.7 DIAPHRAGM
1/2"
SP
A.
C12 - OMIT AT FASCIA
13/16"Ø HOLES FOR 3/4"Ø
A325 BOLTS (TYP.)
BEAM, DIAPHRAGM, DECK PLAN
SCALE: NTS
4'-9"
4'-9"
C L
RO
AD
W
AY
B
RI
DG
E
24'
3'-2"
3'-2"
3'-2"
4"
11'-8"
STRUCTURAL STEEL, GALV,
FURNISHED, FABRICATED, AND
ERECTED (W16x36)
BOLTED CONNECTIONS
PER DIAPHRAGM
CONNECTION DETAIL (TYP.)
CENTERLINE OF BEARING
4" 12'
APPROACH SPAN MAIN SPAN
WEB STIFFENER DETAIL
SCALE: NTS
2"
1'-3"
PROPOSED 1/2" STEEL
WEB STIFFENER
3/4" CHAMFER
(TYP.)
3 x 6" TIMBER NAILER, (TYP.)
(S2S1E) (2 1/2")
4" DECK PANELS,
S2S1E (3 1/2")
3/4"Ø X 9" DM. HD. BOLT
W/ (1) 3/4" CUT WASHER
& (1) 3/4" LOCK NUT @ 48"
O.C., BOLT THROUGH
DECK, NAILER, AND
STEEL GIRDER, FIELD
DRILL, (TYP.)
3/4"Ø X 4" HEX HD. BOLT W/ (1) 3/4" CUT
WASHER & (1) 3/4" LOCK NUT COUNTERSUNK
@ 48" O.C., THROUGH NAILER AND STEEL
GIRDER, FIELD DRILL, (TYP.)
4"
4"
BOLT
(STAGGER
@48" O.C.)
NAILER (TYP.)
B
B
3" x 12" BACKER PLANK
14'-5"
14'-5"
BOLT
(STAGGER
@ 48" O.C.)
NAILER (TYP.)
B
B
5/8" x 3" DM. HD. DR. SPIKE @ 12" O.C., PANEL SHIPLAP JOINT, (TYP.)
PANEL CONNECTION DETAIL
SCALE: NTS
BACKER PLANK CONNECTION
SCALE: NTS
3" M
IN
L4" x 4" x 1/2" x 9"
13/16"Ø HOLES FOR 3/4"Ø
A325 BOLTS (TYP.)
5/16" x 8" GRK-RSS
SCREWS OR EQUAL
3" x 12" BACKER
PLANK, S2S1E
(2 1/2")
BEVELED SOLE PLATE DETAILS
SCALE: NTS
APPROACH PIER
5-1/2" 1-1/2"
1-1/2"
1-1/4" 1-1/4"
3"
3"
5-1/2"
1/4"
1"
5-1/4" 1-1/2"
1-1/2"
1-1/4"
3"
5-1/4"
1"
1-3/4"
13/16"Ø HOLES
(TYP.)
STEEL
(TYP.) STRUCTURAL STEEL, GALV,
FURNISHED, FABRICATED,
AND ERECTED
(L4" x 4" x 1/2" x 8-1/2")
STRUCTURAL STEEL, GALV,
FURNISHED, FABRICATED,
AND ERECTED
(L4" x 4" x 1/2" x 8-1/2")
NOTE:
1. PANEL DECK, BACKER
PLANK, NAILER, CURB
RAILING, AND HARDWARE
SHALL BE INCLUDED WITH
"TREATED STRUCTURAL
TIMBER".
2. SOLE PLATE AND
HARDWARE FOR
DIAPHRAGM AND BACKER
PLANK CONNECTIONS TO BE
INCLUDED WITH
"STRUCTURAL STEEL, GALV,
FURNISHED, FABRICATED,
AND ERECTED".
3"
48"
(TYP.)
4" DECK PANEL (PANEL LENGTHS PER MFR)
(15'-21
2" DECK LENGTH)
4" DECK PANELS (PANEL LENGTHS PER MFR)
(24'-21
2" DECK LENGTH)
8'-6"
3/4"Ø X 4" HEX HD. BOLT
(SEE SECTION B-B) (TYP.)
3/4"Ø X 9" DM. HD. BOLT
(SEE SECTION B-B) (TYP.)
3/4"Ø X 4" HEX HD. BOLT
(SEE SECTION B-B) (TYP.)
3/4"Ø X 9" DM. HD. BOLT
(SEE SECTION B-B) (TYP.)
NOTE:
PROVIDE WASHERS FOR BOLTS THAT ARE BEVELED
AT THE SAME ANGLE AS THE SOLE PLATES.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text
| Sheets and Views |
| TITLE-QUANTITIES-TRAFFIC |
| PLOT 24X36 |
| Sheets and Views |
| TITLE-QUANTITIES-TRAFFIC |
| PLOT 24X36 |
| Sheets and Views |
| TITLE-QUANTITIES-TRAFFIC |
| Sheets and Views |
| TITLE-QUANTITIES-TRAFFIC |
| Sheets and Views |
| TYPICALS |
| Sheets and Views |
| PLAN OF SITE |
| Sheets and Views |
| PROFILE |
| Sheets and Views |
| PLAN OF STRUCTURE |
| Sheets and Views |
| ABUTMENT |
| Sheets and Views |
| STRUCTURE DETAILS |
File details come from the government source that posted it. Updated .